Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD05-01715
StatusFinaled
Name C BAR CONSTRUCTION
Site Address 519 W FRONT ST
Project NameFRONT 5 BUILDING
Customer Number 
ePlanReviewNo
Description
(ADECCO)(FRONT 5 BUILDING) Remodel to construct a 2,210 sq.ft. office tenant on the first floor in an existing building per approved plans and engineering in a space that was created under a building core renovation under BLD04-01386. The remodel will separate out the 750 sq. ft. upper level from this first floor space and a separate permit will be required for any tenant to occupy that upper floor area. Work to include relocating the stairway to the upper level towards the south exterior wall, some new floor infill in former stair opening, a new exterior opening/door in existing masonry wall, new exterior concrete landing/sidewalk section with reinforced concrete retaining wall and guard per code, new interior walls, new interior doors and windows, interior finish, fire sprinkler work, new mechanical, and new electrical work. Special Inspection required for concrete, structural steel/welding, expansion anchors, and epoxy/adhesive anchors. A Certificate of Occupancy is to be issued when completed and approved. Other building addresses in this building are 501 W. Front Street, 519 W. Front Street, and 500 W. Broad Street. NOTE: This building is fully fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD3/4/20093/4/20097/28/2009 DONE
DetailsBarbara Stitt
First Notice has not been responded to.--GC out of business effective 7/25/08 per Bureau of Occupational License///7-28-09 BAS
First Notice 2/11/20093/4/2009 DONE
Permanent Occupancy  2/11/2009 DONE
DetailsAlexandra L. DeYoung
BLD-Final1/5/20061/6/20061/6/2006PPASS
DetailsDave Hannah
dave pending fire fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
FIRE-Final Inspection1/5/20061/6/20061/6/2006PPASS
DetailsForrest France
Items on c/n are complete, fire life safety finaled.
BLD-Final1/4/20061/5/20061/5/2006PNR
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection1/4/20061/5/20061/5/2006AFAIL
DetailsForrest France
Need to provide one fire ext. as required, two sprinkler heads in the confrence room are painted and will need replaced.
BLD-Framing/Rough-in11/23/200511/23/200511/25/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/23/2005 at 8:26:09 AM. Contact: ###-####.ok to cover after elec r/i
Issue PAID IN FULL permit  10/28/2005 DONE
Permit Ready to Issue  10/27/2005 DONE
Inspection Record Card- Bld  10/27/2005 DONE
Print Occupancy Form  10/27/2005 DONE
Telephone call  10/27/2005 DONE
left mess for kirk morris at ###-#### that permit is ready & need esc info
Routing - PLAN CHECK10/25/2005 10/26/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  10/26/2005 PASS
Plan assigned to (JCB)6/28/2005 10/26/2005 PASS
10/26/2005 14:27:03 JCB - activity updated through activity BLDA022 from case BLD05-01715.
Routing - PLANNING10/18/2005 10/25/2005 PASS
Plans needed to be routed to Marty. I forwarded on 10/21.
Routing - Erosion and Sediment10/18/2005 10/18/2005 PASS
ESC waiver request approved with attached conditions.
Routing - PLAN CHECK8/30/2005 10/18/2005 FAIL
Called architect representative, Kirk Morris, to discuss final remaining items that have still not been provided. (A completed City Special Inspection form and a detail for the new exterior concrete patio/retaining wall from the engineer) Red-lined a few other items discussed on plans. Plans to route to the ESC Division and to Planning for approval.
Telephone call  10/18/2005 DONE
Called architect representative, Kirk Morris, to discuss final remaining items that have still not been provided. (Completed City Special Inspection form, and a detail for the new exterior concrete patio/retaining wall from the engineer) Red-lined another couple itmes discussed.
Plan resubmittals received  10/17/2005  
Received (2) copies of sheet S1.0, S1.1, S2.0, S3.0 and A1.0. Also received (2) sets of structural calcs. Routed to Jason B.
Plan resubmittals received  10/3/2005 DONE
Received Letter of Transmittal,1 Letter to Steve W,1 Erosion & Sediment Control Permit Application & 2 Copys of sheet A4.0 Taken to Jason B.
Telephone call  9/26/2005 DONE
Kirk Morris of Cole + Poe Architects called and stated that the project will be moving forward and he would address all outstanding issues still needing to be addressed and provide resubmittal sheets and information.
Routing - PLAN CHECK8/5/2005 8/30/2005 FAIL
Called architect representative, Kirk Morris, to go over several items to still address and provide additional plans/information. He acknowledged and said he would get back to me.
Telephone call  8/30/2005 DONE
Called architect representative, Kirk Morris, to go over several items to still address and provide additional plans/information. He acknowledged and said he would get back to me.
Plan resubmittals received  8/23/2005  
Received (2) copies of sheet A2.1, A2.2, A3.0, A3.1, S1.0, S1.1, S2.0 and S3.0. Also received (2) sets of structural calcs. Routed to Jason B.
1st review completed  8/5/2005 FAIL
failed ESC, Planning, and Plan check
Routing - FIRE7/25/2005 8/5/2005 PASS
review faxed to architect
Routing - PLANNING7/22/2005 7/25/2005 FAIL
Sarah. Then route to Fire Dept. The project requires that a zoning certificate be applied for on the exterior modifications to the building. I contacted Stan Cole and he will submit the required documentation for review.
Routing - Erosion and Sediment7/22/2005 7/22/2005 FAIL
No ESC application, waiver letter, or plan. Informed architect in plan review to provide.
Plan resubmittals requested  7/22/2005 DONE
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK6/29/2005 7/22/2005 FAIL
Plan review e-mailed and faxed to architect. Plan resubmittals required for further review. Plans to route to Sarah in Planning and then to the Fire Dept.
Routing - PUBLIC WORKS6/28/2005 6/29/2005 PASS
Application received  6/24/2005  
Recd Pcfee & Taken To Pln CK  6/24/2005  
Fee Review-notes6/24/20056/24/2005