Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-01736
StatusFinaled
Name SPARKS COMMERCIAL CONTRACTING
Site Address 1515 W GROVE ST
Project NameLINCOLN BUILDING
Customer Number 
ePlanReviewNo
Description
(DONNIE MAC'S TRAILER PARK CUISINE) Interior and exterior remodel changing the occupancy of a 3,245 sq. ft. area from a repair garage to a new restaurant tenant in an existing 8,884 sq. ft. building including all site improvements per approved plans and DRH05-00199/CZC05-00080. Some work under this permit will also include furring and insulating the walls and insulating the ceiling in the adjacent future retail space. Work to include miscellaneous demolition work, new exterior storefront windows and doors, new glazed overhead doors, new CMU parapet extensions on the west exterior wall and a portion of the south exterior wall of the building, new roof covering with insulation, some new exterior wall coverings, new furred walls and insulation, new building core restrooms and janitor room, a new building core one-hour rated exit corridor with 20 minute rated doors, new 2-hour rated CMU wall portions and wall infill with new 90 minute rated door in 2-hour rated fire barrier wall, new steel support walls and new steel floor deck with concrete slab on top to infill former service pit, new exterior wall infill in some former overhead door openings, new steel canopy on the exterior and interior, new exterior walk-up window, new interior walls and doors, new steel framed structure to enclose kitchen, interior finish, new kitchen equipment, new walk-in cooler/freezer, two new Type I hoods with grease duct wrap system, new mechanical work including all new rooftop equipment and ducting, new plumbing, and new electrical work. This tenant area is separated from the adjacent tenant areas by a 2-hour fire barrier wall to comply with fire area provisions. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/200710/23/2007 DONE
Second Notice has not been responded to.
Fee Review-notes6/27/20056/27/200510/23/2007 DONE
Telephone call  10/23/2007 DONE
tlk to scott ###-#### that I need the final values ASAP to close the act for the year - I am faxing a new sheet for him to fill out 11:40 pm
Telephone call  10/23/2007 DONE
tlk to scott ###-#### and refax the cov for him 11:30 am
Telephone call  7/24/2007 DONE
lft ms with scott 571-791 plus contact the other company he works for the final cert of value 11:25 am
Telephone call  4/11/2007 DONE
call to scott w/ sparks, he will complete fv cert and fax back
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 10/18/200612/27/2006 DONE
Permanent occupancy  10/18/2006 DONE
Perm. Occ. Cert. # 11257 issued 10-18-06 to Donnie Mac's Trailer Park Cuisine
Permanent Occupancy 8/25/20068/25/2006 DONE
Details
BLD-Final11/29/200511/30/200511/30/2005PPART
DetailsDave Hannah
scott ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ ok for perm after other go perm
FIRE-Final Inspection11/29/200511/30/200511/30/2005APASS
DetailsForrest France
c/n items have been completed, fire life safety passed inspection.
Temporary occupancy  11/30/2005 DONE
Temp. Occ. Cert. # 5329 issued 11-30-05 to Donnie Mac's Trailer Park Cuisine.
BLD-Final11/28/200511/29/200511/29/2005PNR
DetailsTony Young
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection11/28/200511/29/200511/29/2005AFAIL
DetailsForrest France
Provide max occupant load sign as indicated on review notes, remove manual thumbturn on the NW exit door, provide the correct length sample tube for the duct detector above the kitchen area.
FIRE-Final Inspection11/28/200511/28/200511/28/2005PNR
DetailsForrest France
Hood inspection needs to be completed and approved prior to final for fire life safety. Inspection rescheduled for tomorrow am after hood inspection is completed.
BLD-Framing/Rough-in10/7/200510/10/200510/11/2005PPART
DetailsDave Hannah
SCOTT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 1hr corr ok to rock
BLD-Framing/Rough-in10/5/200510/6/200510/6/2005PPASS
DetailsDave Hannah
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in10/5/200510/5/200510/5/2005ANR
DetailsTony Young
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need trades 1st
Additional plans submitted  8/25/2005  
Received (2) copies of sheet A0.11. Routed to Bill Alexander.
Issue PAID IN FULL permit  8/17/2005 DONE
Routing - PLAN CHECK7/29/2005 7/29/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  7/29/2005 PASS
Permit Ready to Issue  7/29/2005 DONE
Inspection Record Card- Bld  7/29/2005 DONE
Print Occupancy Form  7/29/2005 DONE
Telephone call  7/29/2005 DONE
Spoke with Lois and told her that permit is ready & fees and need ACHD///7/29/05 3:20pm BAS
Routing - FIRE7/28/2005 7/29/2005 PASS
resubmittal acceptable; revised commets emailed to architect
Plan assigned to (JCB)7/1/2005 7/29/2005 PASS
7/29/2005 14:28:13 JCB - activity updated through activity BLDA022 from case BLD05-01736.
Routing - PLANNING7/27/2005 7/28/2005 PASS
Marty.
Routing - PLAN CHECK7/28/2005 7/28/2005 PEND
Plans to route to Fire Dept. for approval of resubmittals.
Plan resubmittals received  7/28/2005  
Received (2) copies of supplemental structural calcs. Routed to Jason B.
Plan resubmittals received  7/27/2005  
Received (2) copies of sheet M1.00, M2.01 and P2.02. Routed to Jason B.
Routing - PLAN CHECK7/15/2005 7/27/2005 PEND
A few final items still left for clarification. Architect will provide within next day. Plans to route to Planning again.
Telephone call  7/26/2005 DONE
Called architect Ryan McCaene to clarify a few items and requested updated plumbing plans and signed mechanical sheets.
Telephone call  7/26/2005 DONE
Electrical engineer called and said a new Lighting COMcheck would be coming that is accurate.
Plan resubmittals received  7/22/2005  
Received (2) copies of sheet A0.11, A1.11, A2.11, A2.31, A3.11, A3.21, A5.11, A5.12, A6.11, A6.12, S2.11, S5.11, M1.00, M2.01, E1.31, E1.41, E2.11, E2.21, E2.31 and ENL. Also received (1) copy of specs for Weatherglaze, Walk-in-cooler, Acrylic coating and Fire rated CMU. (2) Project start-up for Special Inspection and (3) Structural calcs also included. Routed to Jason B.
1st review completed  7/15/2005 FAIL
failed plan Tech; plan check and fire.
Routing - FIRE7/14/2005 7/15/2005 FAIL
review comments email to architect (no fax)
Plan resubmittals requested  7/14/2005 DONE
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK7/7/2005 7/14/2005 FAIL
Plan review e-mailed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Department for review.
Meeting  7/11/2005 DONE
Architect came in to discuss a few issues concerning the project. Also discussed some issues to resolve from the start of teh plan review. A complete plan review has not been completed on the project and is still being done. Architect will provide some small addendum sheets for some of the issues and another copy of the structural calculations.
Plan resubmittals received  7/11/2005 DONE
Three copies of resubmittal sheet L1.0 provided. One copy forwarded to Marty Santoyo in Planning.
Routing - PUBLIC WORKS7/5/2005 7/7/2005 PASS
Routing - Erosion and Sediment7/7/2005 7/7/2005 PASS
ESC plan waiver request approved with attached conditions.
Routing - PLUMBING7/7/2005 7/7/2005 PASS
MOVE all floor sinks out from under cabinets, additional cross connection may be required, add a water supply to the chemical station at the mop sink.
Routing - PLANNING7/7/2005 7/7/2005 PASS
Approved per DRH05-00199, as noted, and per conditions of approval of DRH05-00199.
Routing - PLANNING Land Div7/1/2005 7/5/2005 PASS
Approved. One parcel for Lots 8-12, Block 109. B C O T
Plans ACCEPTED BY PLAN TECH  7/1/2005 DONE
Green Taged 7-6-05
Plan resubmittals received  6/30/2005  
Received (3) copies of sheet A0.11 and A1.11. Also received (3) copies of the United Water letter.
Plans ACCEPTED BY PLAN TECH  6/27/2005 FAIL
Waiting for MEC Sheets - Plans on Darlas desk.
Application received  6/27/2005  
Recd Pcfee & Taken To Pln CK  6/27/2005 DONE