Permit Information
Permit NumberBLD05-01741
StatusFinaled
Name AVISION LLC
Site Address 4909 N VILLA RIDGE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three and one quarter bathroom 2538 sq. ft. two story single family dwelling (2078 sq. ft. first floor/460 sq. ft. second floor) with a attached 1019 sq. ft. three car garage, a 176 sq. ft. covered back porch and a 94 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/13/20061/13/20061/13/2006PPASS
DetailsTony Young
Internet Inspection Request from: Titus Gilliam
DOC - Permit Finaled1/13/20061/13/20061/13/2006PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection1/12/20061/12/20061/13/2006 BOND
Rough grading is complete however fine grading and restoration of the disturbed hillside must still be done. For this a $1,500.00 bond is required. Upon receipt of this bond the grading and drainage is conditionally approved as noted below.

1. The fill that was placed at the back of the lot in the gully and on the adjoining property must be removed and the hillside restored to the original condition, including restoring the vegetation.

2. The fill that was placed on the lot to the north must be removed and the slope revegetated with the same type of plant material that was there prior to the encroachment.

3. The grading plan that you submitted today indicates that runoff will be directed onto the patio at the rear of the house. Provide a drainage swale in this area so that runoff is directed around the house and into the swales on each side of the house.
4. The design engineer shall inspect the final grading and certify that it was done in accordance to the approved plan

BLD-Final1/12/20061/12/20061/12/2006PFAIL
DetailsTom Arcoraci
Internet Inspection Request from: Titus Gilliam hand rail needs to return to wall
BLD-Energy code compliance10/21/200510/24/200510/24/2005APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
BLD-Framing/Rough-in10/19/200510/19/200510/19/2005PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Titus Gilliam
need straps on beam/plates,, support overbuild rafters
BLD-Foundation8/8/20058/8/20058/8/2005PPART
DetailsTony Young
john as close to 2 as possible please; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing8/4/20058/4/20058/4/2005PPART
DetailsTony Young
would like this at 1 if possible?????john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Footing8/3/20058/3/20058/3/2005PNR
DetailsTony Young
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
PubWorks Subgrade Approval6/28/20056/28/20057/28/2005 DONE
Footing subgerade approved by the geotech. 7/28/05

A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
Override - Activity Holds  7/19/2005  
Issue PAID IN FULL permit  7/19/2005 DONE
Plan assigned to (SAM)6/28/20057/15/20057/18/2005 PASS
7/18/2005 10:29:59 SAM - activity updated through activity BLDA022 from case BLD05-01741.
Routing - PLAN CHECK  7/18/2005 PASS
Case Summary (BLD)  7/18/2005  
PLANS/APPL TAKEN TO FRONT DESK  7/18/2005 DONE
Override - Activity Holds  7/18/2005  
Permit Ready to Issue  7/18/2005 DONE
Override - Activity Holds  7/18/2005  
Inspection Record Card- Bld  7/18/2005 DONE
Print Occupancy Form  7/18/2005  
Telephone call  7/18/2005 DONE
left mess that permit is ready
Routing - FIRE7/12/2005 7/14/2005 PASS
no fire sprinkler requirements for this subdivision.
Routing - Erosion and Sediment7/11/2005 7/12/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING6/29/2005 7/8/2005 PASS
verified no chimney.
Routing - PUBLIC WORKS6/28/2005 6/28/2005 PASS
Routing - PUBLIC WORKS GRADING6/28/2005 6/28/2005 PASS
Approved as Category 3
Application received  6/28/2005