BLD-Final | 1/30/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Jim Sly
|
|
|
Brian -- call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong C/C issued
|
DOC - Permit Finaled | 1/31/2006 | 1/29/2006 | 1/29/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 12/15/2005 | 12/16/2005 | 12/16/2005 | A | PASS |
Jim Sly
|
|
|
###-#### Dave\Energy OK
|
BLD-Framing/Rough-in | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | PASS |
Jim Sly
|
|
|
brian --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 8/24/2005 | | |
|
|
|
|
BLD-Foundation | 8/19/2005 | 8/22/2005 | 8/22/2005 | A | PASS |
Jim Sly
|
|
|
logan ###-####
|
BLD-Footing | 8/17/2005 | 8/18/2005 | 8/18/2005 | A | PART |
Jim Sly
|
|
|
logan ###-####
|
Inspection Record Card- Bld | | | 8/16/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/16/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2005 | | DONE |
|
|
|
tlk to oneal deve ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (SAM) | 6/29/2005 | 8/15/2005 | 8/15/2005 | | PASS |
|
|
|
8/15/2005 16:34:23 SAM - activity updated through activity BLDA022 from case BLD05-01763.
|
Routing - PLAN CHECK | 7/25/2005 | | 8/15/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/15/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2005 | | DONE |
|
|
|
|
Early Start Permit | | | 8/11/2005 | | DONE |
|
|
|
|
Early Start Permit | | | 8/11/2005 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/25/2005 | | 7/25/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 7/1/2005 | | 7/22/2005 | | PASS |
|
|
|
routed per cu04-00051 - review cup - setbacks per cup and front setback verified ok for shape of lot. approved as noted with minimum interior garage dimensions to be met 20 feet by 20 feet.
|
Application received | | | 6/29/2005 | | |
|
|
|
|