Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01787
StatusFinaled
Name 3 COMPANY
Site Address 7312 W BRENTWOOD DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 828sq.ft. two bedroom, one bath, one story single family dwelling with a 22sq.ft. Covered front porch per approved plans, all red-lining, and plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the City of Boise. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/200512/30/200512/30/2005PPASS
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/C issued
DOC - Permit Finaled12/30/200512/30/200512/30/2005PPASS
DetailsJim Sly
BLD-Energy code compliance11/1/200511/3/200511/3/2005APASS
DetailsTom Arcoraci
bill; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in10/31/200511/1/200511/1/2005PPASS
DetailsTom Arcoraci
bill; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing10/4/200510/5/200510/5/2005APART
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. no one on site. approved plans not on site. work was complete. Will have to check set backs on wall insp.
Issue PAID IN FULL permit  8/17/2005 DONE
Inspection Record Card- Bld  8/16/2005 DONE
Permit Ready to Issue  8/16/2005 DONE
Telephone call  8/16/2005 DONE
tlk to 3 co ###-#### that permit and fees are ready to be picked up
Plan assigned to (SRZ)8/15/20058/15/20058/15/2005 PASS
8/15/2005 11:11:13 SRZ - activity updated through activity BLDA022 from case BLD05-01787.
Plan assigned to (SAM)7/1/20057/1/20058/15/2005 DONE
Routing - PLAN CHECK7/21/2005 8/15/2005 PASS
Case Summary (BLD)  8/15/2005  
PLANS/APPL TAKEN TO FRONT DESK  8/15/2005 DONE
ONE SET RED-LINED
Routing - PUBLIC WORKS7/20/2005 7/21/2005 PASS
Routing - PLANNING7/18/2005 7/20/2005 PASS
received copy of access easement for existing drive. Site plan corrected and approved as noted.** Inspector to verify setbacks and building wall clear of easement on -site. eeg. routed 2/20 - updated system 2/21
Application received  7/1/2005  
Routing - PLANNING7/1/2005   FAIL
site plan verification - location of water meter in drive? existing drive to remain? called applicant 2nd mess 7/11/05. eeg.
Routing - PLANNING7/15/2005   FAIL
spoke with Angie Brosious regarding status of lot. additional information needed on site plan. Site plan does not accurately depict property lines or access easement. Spoke with Jeff Larson - he will bring in a copy of recorded easement and will modify site plan to reflect easement.eeg.