BLD-Final | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Mike Jordan
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Mike Jordan
|
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Driveway must be placed prior to final.
|
BLD-Energy code compliance | 1/6/2006 | 1/6/2006 | 1/6/2006 | P | PASS |
Tom Arcoraci
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 1/6/2006 | 1/6/2006 | 1/6/2006 | P | PASS |
Tom Arcoraci
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/30/2005 | 1/3/2006 | 1/3/2006 | A | PART |
Mike Jordan
|
|
|
JILL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. roof trusses ok, needs to have approved plans on site to complete framing insp. ok to insulate.
|
BLD-Framing/Rough-in | 12/29/2005 | 12/29/2005 | 12/29/2005 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 6:51:46 AM. Contact: ###-####. Mech. ri failed.
|
Issue PAID IN FULL permit | | | 9/28/2005 | | |
|
|
|
|
Telephone call | | | 9/26/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 7/1/2005 | 9/14/2005 | 9/23/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/29/2005 | | 9/23/2005 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 9/23/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/23/2005 | | DONE |
|
|
|
|
BLD-Footing | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | PART |
Tom Arcoraci
|
|
|
pat ###-#### early start appears ok
|
Plan Reviewer's activity | | | 9/14/2005 | | DONE |
|
|
|
09:50 I called and talked to Pat. I let him know that I need a roof framing plan, wall bracing to be show on the second floor, beam sizes with calculations and engineering for tall wall. Plans are on hold.
|
Early Start Permit | | | 9/13/2005 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2005 | | 8/29/2005 | | PASS |
|
|
|
passed to pw for Monday
|
Routing - PLANNING | 8/26/2005 | | 8/26/2005 | | PASS |
|
|
|
driveway width shall not exceed 33' within first 20' setback from street property line. eeg. Friday
|
Routing - PLANNING | 7/21/2005 | | 7/21/2005 | | FAIL |
|
|
|
Site plan does not meet zone setbacks - verified Muir Woods #4 to meet R-1B setbacks as zoned SRS. Called applicant and discussed options. Need revised site plan and building plans to move forward. eeg.
|
Application received | | | 7/1/2005 | | |
|
|
|
|
Routing - PLANNING | 7/1/2005 | | | | FAIL |
|
|
|
site plan incomplete and not to scale. Does not match address. called applicant. reviewing sub. eeg
|