Permit Information
Permit NumberBLD05-01823
StatusFinaled
Name WILLIAM R SMITH
Site Address 6455 S EISENMAN RD
Project NameHarris Auto Sales Facility
Customer Number 
ePlanReviewNo
Description
Harris Auto Sales Facility - To construct a 6,210 sq. ft. two story type VB fully fire sprinklerd auto sales facility with maintance shop and wash bay. Other work includes all site improvements paving and landscaping per approved attachments, CUP05-00017, DRH05-00047. 1st floor 2768 sq.ft., 2nd floor 3442 sq. ft., fire sprinklers used for story increase
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  10/18/2007 DONE
tlk to rich ###-#### about the cofv - he was not happy on this because he wasnt the contractor - so I faxed him the cofv with int val and he would look up his plm, elec & mech bill and fax back to me 3:30 pm
Telephone call  7/24/2007 DONE
will calll back rich monday on vacation for the final values
Third Notice BLD3/21/20073/21/20075/2/2007 DONE
Second Notice has not been responded to.
Telephone call  5/2/2007 DONE
call to harris auto ctr, left msg for rich to call re fv.
Second Notice BLD3/8/20073/8/20073/21/2007 DONE
First Notice has not been responded to.
First Notice 2/13/20073/8/2007 DONE
Permanent Occupancy 2/13/20072/13/2007 DONE
Details
Permanent occupancy UNPAID FEE  2/13/2007 DONE
Perm. Occ. Cert. # 11436 issued 2-13-07 to Harris Auto Sales.
BLD-Aging Inspection1/17/20071/17/20071/17/2007 PASS
DetailsJim Storey
pending p&z
CHANGE STATUS TO (ISS)  1/9/2007 DONE
Temporary occupancy  1/8/2007 DONE
Temp. Occ. Cert. # 5510 issued 1-8-07 to Harris Auto Sales.
FIRE-Final Inspection11/16/200611/17/200611/20/2006PPASS
DetailsForrest France
c/n items are finished, final inspeciton passed.
Case Summary (BLD)  11/14/2006  
FIRE-Final Inspection11/2/200611/6/200611/6/2006AFAIL
DetailsForrest France
Missing fire dept. access markings as indicated on fire code review notes #20 and sheet c1.1 on approved plans, one emergency light at the lower level failed to operate, remove manual flush bolts on the inactive leaf at the pair of doors in the lower level.
BLD-Conference10/23/200610/23/200610/23/2006PPART
DetailsJim Storey
william- around 3:30?? ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need mti afadavid for final and auto flush bolts double doors downstairs/ pending others sign off.
BLD-Conference9/29/200610/2/200610/2/2006APASS
DetailsJim Storey
rob - 8:30 or 9 am; Phone #: ###-#### Internet Inspection Request from: Barbara Buckleyceilling ok for cover.
BLD-Energy code compliance8/1/20068/1/20068/2/2006PPASS
DetailsJim Storey
smith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in6/19/20066/20/20066/20/2006APASS
DetailsJim Storey
bob - nailing insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley exterior and interior sheer ok
BLD-Conference5/31/20066/1/20066/1/2006APASS
DetailsJim Storey
mr smith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles on site field review with mike brown eng. of record to address sheer and drag isues.
BLD-Conference5/24/20065/25/20065/25/2006AFAIL
DetailsJim Storey
smith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need field review of all conections and design all changes.
BLD-Conference5/24/20065/24/20065/24/2006PDEFR
DetailsJim Storey
smith; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles out of time rolled to 25/06 am
BLD-Aging Inspection5/8/20065/8/20065/8/2006 PART
DetailsJim Storey
wip si on site
BLD-Aging Inspection3/6/20063/6/20063/6/2006 PASS
DetailsJim Storey
wip
CHANGE STATUS TO (ISS)  1/25/2006 DONE
Telephone call  1/20/2006  
No answer the phone 1/19/2006 - lft vm on 1/20 1:04 pm that permit and fees are ready to be picked up for brett labrie ###-####
OVERRIDE  1/19/2006  
Print Occupancy Form  1/19/2006 DONE
Override - Parcel Holds  1/19/2006  
Permit Ready to Issue  1/19/2006 DONE
Routing - PLAN CHECK1/9/2006 1/18/2006 PASS
structural changes
PLANS/APPL TAKEN TO FRONT DESK  1/18/2006 DONE
Plan Modification Accepted  1/8/2006 DONE
** Plan Modification ** Plan modification accepted for BLD05-01823 for the redesign of structural details (no pages given)
routed to Mike O.
Plans ACCEPTED BY PLAN TECH  1/8/2006  
Routing - PLAN CHECK1/5/2006 1/6/2006 PEND
plan changes from inspector given to plan review.. Architect contacted regarding plan modification. MLO
CHANGE STATUS TO (REV)  1/6/2006 DONE
BLD-Footing12/29/200512/30/200512/30/2005ACANC
DetailsMike Jordan
donnie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Noted that project is receiving special inspection.
Plan resubmittals received  12/12/2005 DONE
Received 1 transmittal,1structural design calcs, & 2 copys of sheets A2.0,A3.1,A4.0,A4.2,S0.1,S1.1,S2.1,S3.1S3.2,S4.1,S5.1,S6.1,S6.2 Plans issued 10-28-05 re-submittals put in Jim Storeys mail box..DLD
(F) Reprint permit  10/31/2005  
Issue PAID IN FULL permit  10/28/2005 DONE
OVERRIDE  10/26/2005  
Inspection Record Card- Bld  10/26/2005 DONE
Print Occupancy Form  10/26/2005 DONE
Telephone call  10/26/2005 DONE
talked to brent labrie at ###-#### that permit is ready & need achd
Permit Ready to Issue  10/26/2005  
Plan resubmittals received  10/25/2005 DONE
revised certificate of value provided by architect. MLO
PLANS/APPL TAKEN TO FRONT DESK  10/25/2005 DONE
Plan assigned to (MLO)7/6/2005 10/25/2005 PASS
10/25/2005 10:18:46 MLO - activity updated through activity BLDA022 from case BLD05-01823.
Routing - FIRE10/18/2005 10/24/2005 PASS
Resubmittal acceptable per architects responses and revisions reflecting sprinklers and fire alarm code requirements.
Routing - PUBLIC WORKS10/6/2005 10/10/2005 PASS
Plan resubmittals received  10/6/2005  
Received (3) copies of sheet C1.0, C1.1, C1.2, C2.0, C3.0 and C4.0. Also received (1) letter to Jim Wylie. Routed to Mike O.
Routing - PUBLIC WORKS GRADING10/4/2005 10/5/2005 FAIL
Drainage Plan required. Contact Jim Wyllie ###-####
Routing - PLUMBING9/29/2005 10/4/2005 PASS
flammable liquids interceptor vents may not tie to other sewer vents.
Plan resubmittals received  9/30/2005 DONE
Received 1 Document Transmittal, 1 Letter, & 3 Copys of sheet L1.0 Taken to Mike O.
Routing - PUBLIC WORKS9/23/2005 9/28/2005 FAIL
Revisions needed: Contact Jim Wyllie at ###-####
Plan resubmittals received  9/26/2005 DONE
Received 1 Transmittal ,1 Letter to Lee Rice & 3 Copys of sheets C1.1,C3.0 Taken to Mike O.
Routing - PLAN CHECK9/20/2005 9/23/2005 PASS
Plan resubmittals received  9/20/2005  
Received (3) copies of sheet A1.0, C1.0, C1.1, C2.0, C3.0, C4.0, L1.0, E1.0 and E3.0. Routed to Mike O.
Routing - PLUMBING9/16/2005 9/20/2005 FAIL
STILL ...... does not show interceptor location, piping, venting or sizing or waste connection from car wash to interceptor on plumbing or site plan. Must be on one or the other.
Routing Off Site - STRUCTURAL9/12/2005 9/19/2005 PASS
Routed resubmittals to Stapley
Plan resubmittals received  9/12/2005  
Received (3) copies of sheet S0.1, S1.1, S2.1, S3.1, S3.2, S4.1, S5.1 and S6.1. Routed to Mike O. Calculations missing architect contacted 9/12/2005 MLO
Routing - PLANNING9/7/2005 9/12/2005 PASS
Plans were routed to Cody for review on 9/12/05. He processed the modification for the project. SMS

Plans meet the requirments of DRH05-00047. Routed to Carl Miller for CUP05-00017. CER Note: Plans routed 9/12 to C. Miller then back to plan review on 9/16. Plan reviewer delivered to plumbing, next on the list. MLO
Routing - PUBLIC WORKS8/31/2005 9/7/2005 FAIL
Failed by Jim Wylie - Drainage plan requirements. contact at ###-####
Plan resubmittals received  8/30/2005  
Received (3) copies of sheet C1.0, C2.0, C3.0 and C4.0. Also received additional geotech data and O&M manual. Routed to Mike O.
Routing Off Site - STRUCTURAL8/18/2005 8/30/2005 FAIL
corrections faxed to architect
Plan resubmittals received  8/18/2005 FAIL
Received (3) copies of sheet A0.1, A0.2, A1.0, L1.0, A2.0, A2.2, A3.0, A3.1, A4.0, A4.1, A4.2, S0.1, S1.1, S2.1, S3.1, S3.2, S4.1, S5.1, S6.1, M1.0, M4.0, P1.0, P2.0, E0.2, E2.2, E2.3, E3.0 and (2) copies of structural calcs. Routed to Mike O.
Plans submittals are incomplete. The revised site plans with the grading and drainage and access off Gowen road have not been included. All divisions except structural will require the completed revised site plans be provided to complete any plan reviews. MLO
1st review completed  7/29/2005 FAIL
Failed Public Works, Planning, Structural, Plumbing, Fire and Plan Check.
Routing - PLAN CHECK7/29/2005 7/29/2005 PEND
Routing - FIRE7/20/2005 7/29/2005 FAIL
Comments faxed to architect.
Routing - PLAN CHECK7/15/2005 7/20/2005 FAIL
corrections faxed and mailed to architect
Routing Off Site - STRUCTURAL7/6/2005 7/20/2005 FAIL
faxed and mailed corrections to architect. MLO
Plan resubmittals requested  7/20/2005 DONE
IBC corrections
Routing - PLUMBING7/14/2005 7/15/2005 FAIL
complete public works pretreatment and design requirements prior to plumbin review approval. interior plumbing looks ok outside of any additional venting requirements for pump stations and interceptors.
Routing - AIRPORT7/7/2005 7/14/2005 PASS
Extra set of plans were sent to Airport.///DLD Approved by John Anderson 7/14/2005
Routing - Erosion and Sediment7/14/2005 7/14/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING7/12/2005 7/13/2005 FAIL
DRH05-00047 Tempra /Sara

CUP05-00017 Carl M.
Applicant is processing a modification for both the DR and the CUP. Neither application has completed the review. The modifications are to add an access point off of Gowen Road, which is not supported by the comprehensive plan and to add an 18' retaining wall at this location. Applicant submitted building plans without either one of these approvals in place.
Routing - PUBLIC WORKS7/11/2005 7/12/2005 FAIL
Hillside & Drainage needed contact Brian Murphy ###-####; Sanitary sewer system in this area is a gray water low pressure system. Contact Jim Pardy ###-####; Open air wash bay will have to have roof and sand & grease trap. Contact Mike Hunter ###-####
Routing - PLANNING Land Div7/6/2005 7/11/2005 PASS
Lot 11 Block 2, Gowen Business Park No. 1
Plans ACCEPTED BY PLAN TECH  7/6/2005 FAIL
Failed -Plans were altered after they were approved by P&Z. The plans now show a 18 foot high retaining wall for the new enterance. Carl Miller said they would need a Conditional use modification (and that a modifacation may not be approved) these plans may need to go back through Design Review . Per Jenifer G. Plans are to be routed through the system. ///DLD
Plan routing begun/NEW & ADDTN  7/6/2005  
Application received  7/5/2005  
Recd Pcfee & Taken To Pln CK  7/5/2005 DONE
Fee Review-notes7/5/20057/5/2005   
Routing - PLAN CHECK9/20/2005   PEND
Routing - PLAN CHECK10/10/2005    
Mike Otto went on vacation on the week of 10/10, no one continued routing to fire for final review. Plans sent to fire 10/18 MLO.