BLD-Aging Inspection | 11/25/2009 | 11/25/2009 | 12/2/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 12/2/2009 | 12/2/2009 | 12/2/2009 | P | PASS |
Dave Hannah
|
|
|
exp 180 day no inspectors
|
BLD-Final | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PART |
Dave Hannah
|
|
|
rob Phone #: ###-#### or ###-#### needs a hand rail on front stairs in front of house
|
BLD - Request for Extension | 11/25/2008 | 11/25/2008 | 12/3/2008 | | PASS |
Dave Hannah
|
|
|
TRAX - ###-####
|
BLD-Final | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | NR |
Dave Hannah
|
|
|
Rob Sr Phone #: ###-#### needs mec and plumbing finals
|
BLD-Grading Inspection | 12/1/2008 | 12/1/2008 | 12/1/2008 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
CHANGE STATUS TO (ISS) | | | 11/25/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
re-open permit per george slane- 90 days
|
BLD-Energy code compliance | 4/20/2007 | 4/23/2007 | 4/23/2007 | A | PASS |
Dave Hannah
|
|
|
Jon; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Energy code compliance | 4/18/2007 | 4/18/2007 | 4/19/2007 | A | PASS |
Dave Hannah
|
|
|
###-#### rob ok to cover
|
BLD-Framing/Rough-in | 4/11/2007 | 4/11/2007 | 4/11/2007 | P | PASS |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to insulate
|
BLD-Framing/Rough-in | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | FAIL |
Dave Hannah
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Victoria Beall no plans on site
|
BLD-Framing/Rough-in | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | FAIL |
Dave Hannah
|
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Stacie Backus needs seal package fireplace sign offs and plans
|
BLD-Other | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PART |
Dave Hannah
|
|
|
john - shear - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover ext
|
BLD-Foundation | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PASS |
Dave Hannah
|
|
|
dane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 11/2/2006 | 11/2/2006 | 11/2/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/2/2006 at 6:40:43 AM. Contact: ###-####. retainning wall ok to pour
|
PubWorks Subgrade Approval | 11/2/2006 | 11/2/2006 | 11/2/2006 | | DONE |
|
|
|
Footing subgrade for retaining wall next to driveway approved.
|
BLD-Foundation | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2006 at 10:57:37 AM. Contact: ###-####. dane called and cancelled
|
BLD-Foundation | 9/6/2006 | 9/6/2006 | 9/6/2006 | P | PASS |
Dave Hannah
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Footing | 8/28/2006 | 8/29/2006 | 8/29/2006 | A | PASS |
Dave Hannah
|
|
|
traux; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 8/29/2006 | 8/29/2006 | 8/29/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | FAIL |
Dave Hannah
|
|
|
Jerry; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs terrys geo sign off
|
Issue PAID IN FULL permit | | | 6/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2006 | | DONE |
|
|
|
Spoke with Rob Sr and reminded him permit is ready & fees and needs picked up as agreement was for March or April///5/15/06 @3:15am BAS
|
Telephone call | | | 1/5/2006 | | DONE |
|
|
|
per rita deyoung ok for rob to pickup plans around march or april
|
Permit Ready to Issue | | | 9/12/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/12/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 7/8/2005 | 7/8/2005 | 9/9/2005 | | PASS |
|
|
|
9/9/2005 09:12:10 SAM - activity updated through activity BLDA022 from case BLD05-01845.
|
Routing - PLAN CHECK | 8/16/2005 | | 9/9/2005 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 9/9/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/7/2005 | | DONE |
|
|
|
10:30 I called and talked to Kolby about some questions I had with the engineering. Plans are on hold till I hear from him.
|
Routing - FIRE | 8/10/2005 | | 8/12/2005 | | PASS |
|
|
|
No sprinklers required (Nativa Terra)
|
Routing - Erosion and Sediment | 8/9/2005 | | 8/10/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 7/22/2005 | | 8/9/2005 | | PASS |
|
|
|
route per cfh05-00014 aw.
|
Routing - PUBLIC WORKS GRADING | 7/15/2005 | | 7/15/2005 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 7/15/2005 | | 7/15/2005 | | PASS |
|
|
|
|
Application received | | | 7/8/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/8/2005 | | 7/8/2005 | | FAIL |
|
|
|
Foundation plan and grading plan are in different datums. Contractor and designer were told that these must match to be reviewed.
|