DOC - Permit Finaled | | | 3/7/2006 | | DONE |
|
|
|
|
BLD-Final | 2/22/2006 | 2/22/2006 | 2/22/2006 | P | PASS |
Jim Storey
|
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Code Occupancy Approval | 2/9/2006 | 2/9/2006 | 2/9/2006 | P | PASS |
Dena Gambrel
|
|
|
|
Code Occupancy Approval | 12/20/2005 | 12/20/2005 | 12/20/2005 | P | FAIL |
Dena Gambrel
|
|
|
11-30-05 Site inspection shows that there is not enough parking stalls, no handicap parking and no bicycle parking.
|
PubWorks Occupancy Approval | 11/23/2005 | 11/23/2005 | 11/23/2005 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 11/23/05. R.Rokovitz
|
BLD-Aging Inspection | 11/18/2005 | 11/18/2005 | 11/18/2005 | | PART |
Jim Storey
|
|
|
wip
|
Case Summary (BLD) | | | 8/24/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/19/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/16/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2005 | | DONE |
|
|
|
called told Gale w/Van Auker permit is ready and fees
|
Routing - FIRE | 8/5/2005 | | 8/15/2005 | | PASS |
|
|
|
Review comments faxed to architect.
|
Plan resubmittals received | | | 8/5/2005 | | DONE |
|
|
|
Received Transmittal Letter,1 Letter to Sam R. & 3 Copys of sheets C1.0,C1.1,C1.2C, C1.3 inserted into plans and routed to Fire.
|
Routing - FIRE | 7/21/2005 | | 7/29/2005 | | FAIL |
|
|
|
Plans do not reflect scope of work described in application. Plans returned to front desk to be revised to reflect work actually to be done. Plans need to delete inapplicable work notes and include all details necessary to verify FD access roadways are provided/maintained in accordance with IFC 503 and related BMC amendments. Called architect and left message to resubmit plans which omit inapplicable work notes, show re-paving, and show entire site and designated FD access roadways.
|
Routing - PLANNING | 7/18/2005 | | 7/20/2005 | | PASS |
|
|
|
DRH04-00203 Sara S.
7-19-05 @ 3:50 I called the applicant looking for a landscape plan to approve along with the site work. Applicant stated that three complete sets were brought to the City and two sets were brought to the City without the landscape plan. (The two sets without the landscape were the plans that were routed.) I have sent an e-mail to Brian Murphy trying to locate the landscape plans. (Kelly directed me in his direction.) Hopefully by 7-20-05 I will have found a set so that I can approve the documents. SMS
7-19-05 - Brian does not have the landscape plans. I have called Gayle Jensen and asked that he bring over three copies of the plans tomorrow morning to be included in the two sets that are routing and one for Design Review. SMS
|
Routing - PLUMBING | 7/18/2005 | | 7/18/2005 | | PASS |
|
|
|
no plumbing
|
Routing - Erosion and Sediment | 7/15/2005 | | 7/18/2005 | | PASS |
|
|
|
ESC approved with attached conditions.
|
Routing - PUBLIC WORKS | 7/14/2005 | | 7/15/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/14/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/14/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 7/14/2005 | | 7/14/2005 | | PASS |
|
|
|
Approved as Parcel A on ROS 5684. Signed by Boise City Engineer on 2/6/2002.
|
Application received | | | 7/8/2005 | | |
|
|
|
|
Plan assigned to (DLD) Darla | 7/8/2005 | 7/8/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | PASS |
|
|
|
Darla OR Kelly
|
Routing - FRONT DESK | 8/16/2005 | | | | |
|
|
|
|