BLD-Final | 5/18/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/18/2006 at 10:40:55 AM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 5/19/2006 | 5/19/2006 | 5/19/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | FAIL |
Mike Jordan
|
|
|
larry; Phone #: ###-#### Note: call code Internet Inspection Request from: Cathy Chiles. Needs 20 min. door from R to U occ. window above tub needs to be safety glazed.
|
BLD-Energy code compliance | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PASS |
Jim Sly
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PASS |
Jim Sly
|
|
|
Larry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Override - People Holds | | | 12/2/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/2/2005 | | |
|
|
|
|
OVERRIDE | | | 11/22/2005 | | |
|
|
|
|
OVERRIDE | | | 11/22/2005 | | |
|
|
|
|
OVERRIDE | | | 11/22/2005 | | |
|
|
|
|
OVERRIDE | | | 11/22/2005 | | |
|
|
|
|
OVERRIDE | | | 11/22/2005 | | |
|
|
|
|
OVERRIDE | | | 11/22/2005 | | |
|
|
|
|
Plan assigned to (SAM) | 7/12/2005 | 8/25/2005 | 11/22/2005 | | PASS |
|
|
|
11/22/2005 15:21:03 SAM - activity updated through activity BLDA022 from case BLD05-01862.
|
Case Summary (BLD) | | | 11/22/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2005 | | DONE |
|
|
|
|
Override - People Holds | | | 11/22/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 11/22/2005 | | DONE |
|
|
|
|
Override - People Holds | | | 11/22/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/22/2005 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/31/2005 | | |
|
|
|
Received (2) copies of sheet 1-10. Routed to Steve M.
|
Routing - PLAN CHECK | 8/9/2005 | | 9/7/2005 | | FAIL |
|
|
|
Waiting for builder to meet with me.
|
Plan Reviewer's activity | | | 9/7/2005 | | DONE |
|
|
|
15:35 I called and left a message for Mark about his resubmittals. I let him know that he needs to call and schedule a time to come in and meet with me. Plans are still on hold / failed.
10/19/05 Nick with the Builder came and met with me. I gave him one set of plans (marked set) and told him to bring them back with new plans. Plans are still on hold.
|
Plan resubmittals received | | | 9/6/2005 | | |
|
|
|
Received (1) copy of sheet 5 and 8. Routed to Steve M.
|
Plan Reviewer's activity | | | 8/25/2005 | | DONE |
|
|
|
15:35 I called and left a message for Mark. I let him know that I have some issues with the plans that need to get resolved before I can finish the plan review. Plans are on hold.
|
Routing - PLANNING | 8/8/2005 | | 8/9/2005 | | PASS |
|
|
|
discussed / resolved site plan with Jeff L. Site plan approved as noted for setbacks and common drive. eeg.
|
Routing - PUBLIC WORKS | 8/9/2005 | | 8/9/2005 | | PASS |
|
|
|
|
Application received | | | 7/8/2005 | | |
|
|
|
|
Routing - PLANNING | 7/12/2005 | | | | FAIL |
|
|
|
need columns for front porch located within front yard setback - 15' ok if applicant wants to shift footprint of building. called applicant.
|