Permit Information
Permit NumberBLD05-01865
StatusFinaled
Name INTERIOR FINISHES
Site Address 8489 W OVERLAND RD
Project NamePONDEROSA PLAZA
Customer Number 
ePlanReviewNo
Description
(PRIMO'S PIZZA)(PONDEROSA PLAZA) To construct and finish a 3,000 sq.ft. pizza restaurant with kitchen per approved plans on file. The west wall of this tenant space is an existing 2-hour fire barrier wall used to create this A-2 occupancy of less than 5,000 for fire area compliance, under shell permit BLD05-01150. This building is not sprinklered. Work includes construction of interior non-bearing walls to create two new accessible restrooms, storage, service, kitchen and dining areas; raised floor dining area, suspended grid ceiling and soffits; millwork and interior finishes; upgrade electrical, mechanical & plumbing to meet tenant needs and minimum code compliance. (drs)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  2/13/2014 DONE
Third Notice BLD6/14/20066/14/20066/15/2006 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/17/20065/25/2006 DONE
Permanent occupancy UNPAID FEE  4/17/2006 DONE
Perm. Occ. Cert. # 10980 issued 4-17-06 to Primo's Pizza.
BLD-Final11/30/200512/1/200512/1/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/30/2005 at 11:36:57 AM. Contact: ###-####. Ceiling has been fixed. Ok for perm occ.
Permanent Occupancy 12/1/200512/1/2005 DONE
Details
BLD-Final11/28/200511/29/200511/29/2005AFAIL
DetailsMike Jordan
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp occ given. Noted suspended ceiling system is riveted for floating system. Rivets to be removed and spreader bars installed.
Temporary occupancy  11/29/2005 DONE
Temp. Occ. Cert. # 5326 issued 11-29-05 to Primo's Pizza.
BLD-Final11/25/200511/28/200511/28/2005PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/25/2005 at 2:02:59 PM. Contact: ###-####. Need to final shell and core first.
FIRE-Final Inspection11/25/200511/28/200511/28/2005APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final11/23/200511/25/200511/25/2005PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/23/2005 at 3:29:12 PM. Contact: ###-####.
FIRE-Final Inspection11/23/200511/25/200511/25/2005AFAIL
DetailsTroy Cobbley
Need to provide the correct remote annunciators for the duct smoke detectors and then test duct smoke detectors. Also need building address installed facing Overland and provide the correct "Maximum Occupancy Load" sign for the assembly area.
FIRE-Final Inspection11/22/200511/23/200511/23/2005ACANC
DetailsTroy Cobbley
No time for inspection
Print Occupancy Form  11/23/2005 DONE
BLD-Framing/Rough-in10/10/200510/11/200510/11/2005APART
DetailsJim Storey
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moorewalls ok
Additional plans submitted  8/30/2005 PASS
Received revised Sheet A1 for restrooms layout. Plan modification reduced the number of water closets to meet minimum code per Ch. 29, 2003 IBC. Copy to records and copy to inspector to take to field as part of site approved plans.
Plan resubmittals received  8/29/2005  
Received (2) copies of sheet A1.0. Routed to Dan S.
Issue PAID IN FULL permit  8/16/2005 DONE
Inspection Record Card- Bld  8/2/2005 DONE
Print Occupancy Form  8/2/2005 DONE
Permit Ready to Issue  8/2/2005 DONE
Telephone call  8/2/2005  
lft ms for pat ###-#### that permit and fees are ready to be picked up
Routing - PLAN CHECK7/29/2005 8/1/2005 PASS
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  8/1/2005 PASS
Plan assigned to (DRS)7/14/2005 8/1/2005 PASS
8/1/2005 07:47:03 DRS - activity updated through activity BLDA022 from case BLD05-01865.
Routing - FIRE7/21/2005 7/29/2005 PASS
review comments faxed to architect
1st review completed  7/29/2005 PASS
Routing - PLUMBING7/20/2005 7/21/2005 PASS
provide floor drain in the kitchen area. hub drains must not be installed with in cabinets(front counter). thermol expantion protection required. add a water supply at the mop sink for the chemical system, if used.
Routing - PLAN CHECK7/15/2005 7/20/2005 PEND
No resubmittals required. Routing to plumbing for review then fire code analyst.
Routing - PUBLIC WORKS7/14/2005 7/15/2005 PASS
Plans ACCEPTED BY PLAN TECH  7/14/2005  
Application received  7/11/2005  
Recd Pcfee & Taken To Pln CK  7/11/2005  
First Notice 2/23/2014   
Fee Review-notes7/11/20057/11/2005