BLD-Final | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Jim Storey
|
|
|
carol ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 11/28/2006 | 11/29/2006 | 11/29/2006 | A | NH |
Dave Hannah
|
|
|
carol cell ####-#### Note: call for code Terry records sent insp a note; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called both numbers no reply
|
BLD-Grading Inspection | 11/28/2006 | 11/28/2006 | 11/28/2006 | | BOND |
|
|
|
The rough grading and drainage has been completed at the above mentioned address. However, restoration of the disturbance on the adjacent lots has not been completed. For this the engineer has recommended a bond of $500.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Final | 11/17/2006 | 11/20/2006 | 11/21/2006 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### call for access Internet Inspection Request from: Rita DeYoung needs terry records hillside final
|
BLD-Framing/Rough-in | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PASS |
Dave Hannah
|
|
|
Carol, reinspect; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Energy code compliance | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PASS |
Dave Hannah
|
|
|
Carol, reinspect; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | FAIL |
Dave Hannah
|
|
|
carol - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles fire blocking c/n on site ok to insulate
|
FIRE-Sprinkler Rough-in | 5/22/2006 | 5/23/2006 | 5/23/2006 | A | DEFR |
Forrest France
|
|
|
This inspection request was for the fire sprinkler permit incorrectly called in under the BLD permit number. See comments for this inpection under FIR06-00320.
|
BLD-Framing/Rough-in | 5/17/2006 | 5/18/2006 | 5/18/2006 | P | FAIL |
Dave Hannah
|
|
|
carol; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n on site need seal package and other trades to signoff also a boise city plumbing permit
|
BLD-Framing/Rough-in | 5/16/2006 | 5/17/2006 | 5/17/2006 | | CANC |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa 5-17-06 Kara called in to cancel this inspection as the ele inspection failed, they will re-call when ready///dld
|
BLD-Footing | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PASS |
Dave Hannah
|
|
|
and wall insp//michael; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
PubWorks Subgrade Approval | 1/4/2006 | 1/4/2006 | 1/4/2006 | | DONE |
|
|
|
SUBGRADE FOR REMAINDER OF FOOTINGS APPROVED BY THE GEOTECHNICAL ENGINEER
|
BLD-Footing | 12/27/2005 | 12/28/2005 | 12/28/2005 | P | NR |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 12/23/2005 | 12/27/2005 | 12/28/2005 | A | NR |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 12/12/2005 | 12/12/2005 | 12/12/2005 | P | PART |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa basement walls ok to pour
|
BLD-Footing | 11/3/2005 | 11/3/2005 | 11/4/2005 | P | PART |
Dave Hannah
|
|
|
michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to place concrete in lower levels
|
PubWorks Subgrade Approval | 11/3/2005 | 11/3/2005 | 11/3/2005 | | PART |
|
|
|
Footing subgrade for daylight portion of residence approved by the geotechnical engineer.
|
Issue PAID IN FULL permit | | | 9/15/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/11/2005 | 8/22/2005 | 9/12/2005 | | PASS |
|
|
|
9/12/2005 07:11:49 SAM - activity updated through activity BLDA022 from case BLD05-01869.
|
Routing - PLAN CHECK | 7/26/2005 | | 9/12/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/12/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/12/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Case Summary (BLD) | | | 9/8/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/8/2005 | | DONE |
|
|
|
10:00 I called and left a message for Scott. I let him know that the REScheck failed and a new one is needed.
|
Plan Reviewer's activity | | | 9/1/2005 | | DONE |
|
|
|
09:20 I called and left a message for Tim Phillips at his house and on his cell phone. Plans are on hold till I get new calcs, stamp on foundation plan and all my questions answered.
|
Plan resubmittals received | | | 8/31/2005 | | DONE |
|
|
|
Builder brought in new plans.
|
Plan Reviewer's activity | | | 8/22/2005 | | DONE |
|
|
|
8/22/05 08:45 I called and talked to Scott with Scottsdale Homes. I let him know that I need the plans to reflex the engineering. (ie: dimensions, wall bracing) Plans are on hold.
|
Routing - FIRE | 7/18/2005 | | 7/26/2005 | | PASS |
|
|
|
no fire sprinklers required (Boulder Heights sub)
|
Routing - Erosion and Sediment | 7/15/2005 | | 7/18/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 7/12/2005 | | 7/15/2005 | | PASS |
|
|
|
reveiwed Friday 7/15 - system down - updated file 7/18/05
|
Routing - PUBLIC WORKS GRADING | 7/11/2005 | | 7/12/2005 | | PASS |
|
|
|
approved as category 3
|
Routing - PUBLIC WORKS | 7/12/2005 | | 7/12/2005 | | PASS |
|
|
|
|
Application received | | | 7/11/2005 | | |
|
|
|
|