Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-01926
StatusFinaled
Name STEED CONSTRUCTION
Site Address 2962 S VICTORY VIEW WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
(NEW LIFE OFFICE) This building is fire sprinklered for area increase. To create a 4,354 square foot wholesale and warehouse tenant space with an existing 32,340 square foot, 1 story building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, interior doors with sidelites, and interior finishes. A separate permit for high rack storage is required. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/21/2013 DONE
Second Notice BLD12/22/200512/22/200512/27/2005 DONE
First Notice has not been responded to.
First Notice 12/1/200512/22/2005 DONE
BLD-Final11/30/200512/1/200512/1/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/30/2005 at 4:44:27 PM. Contact: ###-####.Life/safety passed. Spoke to Alan Hauser, Mech is ok for final.
FIRE-Final Inspection11/30/200512/1/200512/1/2005APASS
DetailsForrest France
Fire life safety requirements have been met, inspection passed.
FIRE-Alarm Testing11/30/200512/1/200512/1/2005ADONE
DetailsForrest France
Duplicate inspection already called in.
Permanent Occupancy 12/1/200512/1/2005 DONE
Details
Permanent occupancy  12/1/2005 DONE
Perm. Occ. Cert. # 10819 issued 12-1-05 to the New Life Office.
BLD-Final11/10/200511/14/200511/14/2005PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/10/2005 at 8:22:34 AM. Contact: ###-####.
FIRE-Final Inspection11/10/200511/10/200511/10/2005PCANC
DetailsTroy Cobbley
No time for inspection
Case Summary (BLD)  11/3/2005  
FIRE-Final Inspection9/21/20059/23/20059/23/2005PPART
DetailsTroy Cobbley
A temporary occupancy was given with sam rogers permission until the fire alarm pemit is inspected and finaled. All other life safety items passed.
BLD-Final9/23/20059/23/20059/23/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/23/2005 at 8:32:11 AM. Contact: ###-####.pending fire
BLD-Final9/16/20059/19/20059/19/2005PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 4:18:13 PM. Contact: ###-####.
FIRE-Final Inspection9/16/20059/19/20059/19/2005PFAIL
DetailsTroy Cobbley
Provide fire extinguishers per review comment #7. Provide indicator at the main exit. Provide fire alarm permit for the connection of the duct detector to the fire alarm panel. Per contractor the address has been changed to 2962.
FIRE-Final Inspection9/15/20059/16/20059/16/2005PCANC
DetailsForrest France
BLD-Other9/13/20059/13/20059/13/2005PPASS
DetailsJim Storey
ceilling ok
Case Summary (BLD)  9/13/2005  
BLD-Framing/Rough-in8/24/20058/24/20058/25/2005PPASS
DetailsJim Storey
steve ###-#### pending others.
Override - Parcel Holds  8/24/2005  
Telephone call  8/16/2005 DONE
called Ben Peterson and David Kodanko, told them permit is ready and fees
Issue PAID IN FULL permit  8/16/2005  
Plan assigned to (CJW)7/16/2005 8/15/2005 PASS
8/15/2005 08:39:53 CJW - activity updated through activity BLDA022 from case BLD05-01926.
Routing - PUBLIC WORKS8/12/2005 8/15/2005 DONE
Drawings sent back for additional sewer fees.
Routing - PLAN CHECK8/15/2005 8/15/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/15/2005 DONE
Inspection Record Card- Bld  8/15/2005 DONE
Print Occupancy Form  8/15/2005  
Permit Ready to Issue  8/15/2005  
Routing - PLAN CHECK8/10/2005 8/12/2005 PASS
The drawings were approved after the resubmittal review.
1st review completed  8/10/2005 FAIL
failed plan check
Routing - FIRE8/2/2005 8/10/2005 PASS
Review faxed to architect.
Plan resubmittals received  8/8/2005  
Received (2) copies of sheet A-0, A-1, A-3, P-1 and P-2. Routed to Carl W.
Routing - PLAN CHECK7/18/2005 8/2/2005 FAIL
The IBC plan review was started on July 28, 2005 and was finished on August 2, 2005. Revised drawings were required. See the plan review report.
Plan resubmittals received  7/29/2005  
Received (1) copy of original construction plans for Victory Plaza Bldg A. Routed to Carl W.
Telephone call  7/28/2005 DONE
Called Ben Petersen, Applicant with Larson Architects. Ask for a complete set of "as built" drawings. This building was constructed in Ada County and then annexed into Boise City.
Routing - PUBLIC WORKS7/16/2005 7/18/2005 PASS
Application received  7/15/2005  
Recd Pcfee & Taken To Pln CK  7/15/2005 DONE
Plans ACCEPTED BY PLAN TECH  7/15/2005  
Fee Review-notes7/15/20057/15/2005