Third Notice BLD | 8/18/2006 | 8/18/2006 | 8/25/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/2/2006 | 8/2/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/18/2006 | 8/2/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/18/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11127 issued 7-18-06 to Fire Station #4.
|
BLD-Final | 7/6/2006 | 7/7/2006 | 7/7/2006 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/6/2006 at 4:25:45 PM. ok for c of o
|
FIRE-Final Inspection | 7/6/2006 | 7/7/2006 | 7/7/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Framing/Rough-in | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | PASS |
Tom Arcoraci
|
|
|
rudie - ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley done by 316
|
Code Occupancy Approval | 6/29/2006 | 6/29/2006 | 6/29/2006 | P | PASS |
Carol Montgomery
|
|
|
|
BLD-Framing/Rough-in | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | FAIL |
Jim Sly
|
|
|
rudy - ceiling and structural; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Need seismic splay wires, strut, Perim wires, spacer bars
|
Permanent Occupancy | | 6/29/2006 | 6/29/2006 | | DONE |
|
|
|
|
BLD-Energy code compliance | 5/10/2006 | 5/12/2006 | 5/12/2006 | P | PASS |
Jim Sly
|
|
|
rudy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 5/3/2006 | 5/4/2006 | 5/4/2006 | P | PASS |
Jim Sly
|
|
|
rudy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Aging Inspection | 3/10/2006 | 3/10/2006 | 3/10/2006 | | DONE |
Jim Sly
|
|
|
WIP
|
Issue PAID IN FULL permit | | | 11/29/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2005 | | DONE |
|
|
|
called ###-#### and left voicemessage for Stillman that permit is ready but need GC and breakdown of values before issue
|
Plan assigned to (CJW) | 7/19/2005 | | 11/7/2005 | | PASS |
|
|
|
11/7/2005 12:47:09 CJW - activity updated through activity BLDA022 from case BLD05-01937.
|
Routing - PLANNING | 10/25/2005 | | 11/7/2005 | | PASS |
|
|
|
Temporary modular must be removed by December 20, 2005.
|
Routing - PLAN CHECK | 11/7/2005 | | 11/7/2005 | | SONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2005 | | DONE |
|
|
|
|
Routing - FIRE | 10/11/2005 | | 10/25/2005 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 8/17/2005 | | 10/11/2005 | | PASS |
|
|
|
(9-30-05) The emergency excape and rescue openings have not been provided for the sleeping rooms. Architect E-mailed that this needed to be resolved. (10/11/05) Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 10/11/2005 | | |
|
|
|
Received (2) copies of sheet A0.1, A1.2, A1.3 and P1.1. Routed to Carl W.
|
Plan resubmittals received | | | 9/23/2005 | | |
|
|
|
Received (2) copies of sheet A1.2, A1.3, A3.1, A5.1 and A6.1. Also received (2) sets of structural calcs. Routed to Carl W.
|
Routing - FIRE | 8/9/2005 | | 8/17/2005 | | FAIL |
|
|
|
review comments faxed to architect.
|
1st review completed | | | 8/17/2005 | | FAIL |
|
|
|
failed planning, plan check and fire.
|
Routing - PLAN CHECK | 7/20/2005 | | 8/9/2005 | | FAIL |
|
|
|
The IBC plan review was started on August 5, 2005 and was finished on August 9. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 7/19/2005 | | 7/20/2005 | | FAIL |
|
|
|
Evelyn or Colleen
Need to apply for a CU mod first!
|
Routing - PUBLIC WORKS | 7/19/2005 | | 7/19/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/18/2005 | | |
|
|
|
When bidding is finalized and a contractor is selected he (she) will be required to obtain an ESC permit prior to starting the work per Steve Webb. (msouthard)
|
Application received | | | 7/15/2005 | | |
|
|
|
|
Fee Review-notes | 7/15/2005 | 7/15/2005 | | | |
|
|
|
|