Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-01950
StatusFinaled
Name BRIAN SWEET
Site Address 5200 N ARROW CREST WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4432sq.ft. Two story with unfinished basement, Single family dwelling (2336sq.ft. First floor / 1798sq.ft. 2nd floor / 298sq.ft. unfinished basement) with a 139sq.ft. Covered front porch, a 107sq.ft. Covered 2nd floor deck, a 107sq.ft. Covered rear patio, and a 1087sq.ft. Attached garage per approved plans, all red-lining, Engineering, and plan review report. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. CUP-44-94 per Colleen Carroll with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/8/20078/9/20078/9/2007APASS
DetailsTony Young
brian Phone #: ###-####
DOC - Permit Finaled8/9/20078/9/20078/9/2007PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection8/9/20078/9/20078/9/2007 DONE
Final grading and drainage approved
BLD-Final8/2/20078/3/20078/3/2007ANR
DetailsTony Young
brian Phone #: ###-####
need trades and hill side
BLD-Framing/Rough-in5/8/20065/8/20065/8/2006PPASS
DetailsTony Young
brian Note: cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance5/8/20065/8/20065/8/2006PPASS
DetailsTony Young
brian Note: cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in4/27/20064/28/20064/28/2006APART
DetailsTony Young
Call first ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
strap plates, point load studs,, fire blocks,, ok to insulate
BLD-Framing/Rough-in4/18/20064/19/20064/19/2006AFAIL
DetailsTony Young
Brian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
need trades 1st
BLD-Framing/Rough-in3/29/20063/29/20063/29/2006PPART
DetailsTony Young
Josh ph ###-####
exterior shear ok,, straps on exterior ok
BLD-Framing/Rough-in3/28/20063/29/20063/29/2006ACANC
DetailsTony Young
joshua; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
meeting,, no time,, rescheduled for pm
BLD-Framing/Rough-in2/8/20062/9/20062/10/2006APART
DetailsTony Young
Joshua -- for sheeting/shearing; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
exterior ok to cover w/ house wrap,, nailing is ok,, straps are being reviewed for proper method on how engineer has designed
BLD-Framing/Rough-in2/2/20062/3/20062/3/2006ANR
DetailsTony Young
Brian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
conf only,, lots of details on engineering
BLD-Foundation9/12/20059/13/20059/13/2005APART
DetailsMike Jordan
cal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/12/20059/12/20059/12/2005PNR
DetailsTony Young
cale; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation9/6/20059/7/20059/7/2005APART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
basement walls
BLD-Footing9/1/20059/1/20059/1/2005PPART
DetailsTony Young
Cal; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip
PubWorks Subgrade Approval7/20/20057/20/20058/30/2005 PASS
Footing subgrade approved for crawlspace and patial basement.


A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####.
Plan assigned to (SRZ)8/15/20058/15/20058/19/2005 PASS
8/19/2005 08:27:26 SRZ - activity updated through activity BLDA022 from case BLD05-01950.
PLANS/APPL TAKEN TO FRONT DESK  8/19/2005 DONE
One set Red-lined.
Inspection Record Card- Bld  8/19/2005 DONE
Print Occupancy Form  8/19/2005 DONE
Permit Ready to Issue  8/19/2005 DONE
Telephone call  8/19/2005 DONE
called Brian Sweet ###-#### and left voicemessage that permit is ready and fees
Issue PAID IN FULL permit  8/19/2005 DONE
Routing - PLAN CHECK8/17/2005 8/19/2005 PASS
Plan Reviewer's activity  8/18/2005 PASS
Plan review Pending for Mechanical Ventilation Alternate Design. (SRZ)
Case Summary (BLD)  8/18/2005  
Routing - FIRE8/15/2005 8/16/2005 PASS
No fire sprinklers required - Arrowhead Ridge #1.
Plan assigned to (SAM)7/18/20057/18/20058/15/2005 DONE
Routing - Erosion and Sediment8/15/2005 8/15/2005 PASS
ROUTED TO EROSION ON 8/15/05. (SRZ). ESC plan approved with attached conditions.
Routing - PUBLIC WORKS GRADING7/19/2005 7/20/2005 PASS
APPROVED AS CATEGORY 3
Routing - PUBLIC WORKS7/19/2005 7/19/2005 PASS
Routing - PLANNING  7/19/2005 PASS
Application received  7/18/2005