Permit Information
Permit NumberBLD05-01961
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC-NITROGEN TUBE TRAILERS
Customer NumberC8398
ePlanReviewNo
Description
Micron Structural Concrete Slab - To construct a new 23' x 31' x 12" deep (713 sq. ft.) reinforced concrete support pad for two Nitrogen Trifluoride tube trailers. This concrete pad will be enclosed by a new 6'-0" chain-link fence and gate. This new concrete slab will be located south of Building #1X, at the east end of an existing roof covered concrete slab. This permit also includes the installation of associated connection piping and electrical for two new exterior lights to be located at the west end of the new pad. All construction per the approved plans.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD2/3/20062/3/20063/1/2006 DONE
First Notice has not been responded to.
First Notice1/17/20061/17/20062/3/2006 DONE
DetailsJim Storey
BLD-Final1/13/20061/17/20061/17/2006PPASS
DetailsJim Storey
ernie; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled1/17/20061/17/20061/17/2006PPASS
DetailsJim Storey
FIRE-Final Inspection1/11/20061/12/20061/12/2006PPASS
DetailsForrest France
Construction meets specifications, however the Nitrogen Triflouride tube trailers have not been installed on the pad at this time.
BLD-Aging Inspection12/29/200512/29/200512/29/2005 PASS
DetailsJim Storey
wip
BLD-Final10/19/200510/20/200510/20/2005ANR
DetailsJim Storey
ernie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue & PRINT to be Invoiced  10/18/2005 DONE
Permit Ready to Issue  9/28/2005 DONE
Inspection Record Card- Bld  9/28/2005 DONE
Telephone call  9/28/2005 DONE
E-mailed Paul that permit is ready & fees///9/28/05 9:55am BAS
Plan assigned to (JCM)7/20/2005 9/27/2005 PASS
9/27/2005 16:16:46 JCM - activity updated through activity BLDA022 from case BLD05-01961.
Routing - FIRE9/27/2005 9/27/2005 PASS
resubmittal acceptable
Routing - PLAN CHECK9/27/2005 9/27/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/27/2005 DONE
Plan resubmittals received  9/8/2005 DONE
Telephone call  8/19/2005 DONE
Telcon with Bobbie Rice and Paul Marcolina. Bobbie claims material is NFPA health haz 2 per their evaluation of MSDS data. I requested a written response explaining their evaluation with MSDS included. She will do.
Routing - FIRE8/5/2005 8/18/2005 FAIL
Response from Micron indicates NF3 is not a health hazard 3 material, which contradicts our HMEX data. Called Paul, left voice mail to call me to discuss. Also called a Haz Mat consultant to get a 3rd party opinion; left message. Holding at my desk for additional information to conclude review.
Routing - PLAN CHECK8/1/2005 8/5/2005  
Received resubmittals and routed to Fire.
Plan resubmittals received  8/5/2005  
Received (3) copies of sheet P2.0. Routed to John M.
Routing - FIRE7/21/2005 8/1/2005 FAIL
review comments faxed to architect
1st review completed  8/1/2005 FAIL
failed fire.
Plan Reviewer's activity  7/21/2005 PASS
Plans reviewed and approved as submitted.
Routing - PLAN CHECK7/21/2005 7/21/2005 PASS
Plans ACCEPTED BY PLAN CHECK  7/20/2005  
Application received  7/19/2005  
Override - Parcel Holds  7/19/2005  
Third Notice BLD3/1/20063/1/2006   
Second Notice has not been responded to.
Fee Review-notes7/19/20057/19/2005