BLD-Aging Inspection | 1/7/2008 | 1/7/2008 | 1/11/2008 | | PASS |
Jim Storey
|
|
|
doc expired no aproval to occupy
|
DOC - Permit Expired | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | PASS |
Jim Storey
|
|
|
no call for insp to complet project expired by limatations.
|
BLD-Aging Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | | DONE |
Jim Storey
|
|
|
doc expired no occupance aprovals
|
DOC - Permit Expired | 10/30/2007 | 10/30/2007 | 10/30/2007 | A | DONE |
Jim Storey
|
|
|
no call for insp. expired wiht out aproval to be occupied.
|
BLD-Aging Inspection | 8/10/2007 | 8/10/2007 | 8/10/2007 | | PASS |
Jim Storey
|
|
|
wip ncfi
|
BLD-Aging Inspection | 4/9/2007 | 4/9/2007 | 4/9/2007 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 2/5/2007 | 2/5/2007 | 2/5/2007 | P | PART |
Jim Storey
|
|
|
Troy - please call 1 hr before going out; Phone #: ###-#### Internet Inspection Request from: Darla Downs restaroom framing ok pending mech ri.
|
BLD-Aging Inspection | 1/4/2007 | 1/4/2007 | 1/4/2007 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 11/1/2006 | 11/1/2006 | 11/1/2006 | | DONE |
Forrest France
|
|
|
Project related fire sprinkler permit is not yet finaled.
|
BLD-Aging Inspection | 8/29/2006 | 8/29/2006 | 8/29/2006 | | PASS |
Jim Storey
|
|
|
wip
|
Telephone call | | | 6/29/2006 | | DONE |
|
|
|
Received a phone call from Troy Womack, Prestige Homes, regarding installing a gate across the FD roadway. I had him fax a sketch and he wanted to install it in the radius portion of a turn on the FD roadway and therefore a 20' clear open-width gate would not be wide enough. Explained the FD width requirements and told him he would have to bring in two copies of Sheet A2 showing the revision with the proposed gate for our review and approval as a "plan Mod" and if approved he would get one stamped copy back to put with the plan set in the field.
|
BLD-Aging Inspection | 6/27/2006 | 6/27/2006 | 6/27/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Jim Storey
|
|
|
troy--please call 1 hr prior ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie recieved and archived engineering for back passage door in brace pannel required by fire with out reguard to strucal design.
|
BLD-Other | 4/5/2006 | 4/5/2006 | 4/5/2006 | P | PART |
Jim Storey
|
|
|
shear strapping inspection//Please call 1 hr. prior to meet//Troy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesapending info on back passage door located in sheer.
|
BLD-Framing/Rough-in | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | PART |
Jim Sly
|
|
|
Troy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong 80 percent complete with removing and relocating cross brace strapping. appears that all bolts installed for knee bracing, collar ties and floor anchors OK. All will be exposed for further inspection.
|
BLD-Other | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PART |
Jim Storey
|
|
|
MATT nOTE: REBAR; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles trenchs and rebar being placed in slab.
|
BLD-Framing/Rough-in | 3/2/2006 | 3/2/2006 | 3/3/2006 | P | PASS |
Jim Storey
|
|
|
Matt -- rebar insp for flat work; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PART |
Tom Arcoraci
|
|
|
early as possible//re-bar inspection///troy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa center section ok to pour
|
BLD-Framing/Rough-in | 2/24/2006 | 2/24/2006 | 2/24/2006 | P | NR |
Jim Storey
|
|
|
Troy; Phone #: ###-#### -- call 1st before insp Internet Inspection Request from: Elizabeth Esong need to revise to meet engineering.
|
BLD-Aging Inspection | 1/30/2006 | 1/30/2006 | 1/30/2006 | | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 11/30/2005 | 11/30/2005 | 11/30/2005 | P | PASS |
Jim Storey
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 11/29/2005 | 11/30/2005 | 11/30/2005 | A | NR |
Jim Storey
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
(F) Reprint permit | | | 10/18/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/14/2005 | | DONE |
|
|
|
talked to prestige homes at ###-#### that permit is ready & need achd
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2005 | | 10/13/2005 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 7/21/2005 | | 10/13/2005 | | PASS |
|
|
|
10/13/2005 08:37:09 JCM - activity updated through activity BLDA022 from case BLD05-01971.
|
Routing - FIRE | 9/21/2005 | | 10/12/2005 | | PASS |
|
|
|
resubmittal acceptable subject to conditions noted in revised review; faxed to architect and left voicemail to call me to discuss the conditional comments.
|
Routing - PUBLIC WORKS | 9/29/2005 | | 9/29/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/20/2005 | | 9/21/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/20/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plans, including the resubmitted structural responses. JCM
|
Routing - PUBLIC WORKS | 9/19/2005 | | 9/20/2005 | | |
|
|
|
Jim Wyllie
|
Plan resubmittals received | | | 9/20/2005 | | DONE |
|
|
|
Received 1 Letter for Sam R. & 3 Copys of sheets A-2,A-4,A-5 Taken to John M.
|
Routing - PLAN CHECK | 9/13/2005 | | 9/19/2005 | | |
|
|
|
|
Routing - PUBLIC WORKS | 9/8/2005 | | 9/13/2005 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/11/2005 | | 9/8/2005 | | |
|
|
|
|
Plan resubmittals received | | | 9/6/2005 | | |
|
|
|
Received (3) copies of sheet A-1, A-3, A-4 and (3) sets of structural calcs. Routed to John M.
|
1st review completed | | | 8/11/2005 | | FAIL |
|
|
|
failed structural, ESC, plan check and fire.
|
Routing - FIRE | 8/2/2005 | | 8/11/2005 | | FAIL |
|
|
|
review comments faxed to architect.
|
Plan resubmittals requested | | | 8/8/2005 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 7/21/2005 | | 8/4/2005 | | FAIL |
|
|
|
Called PDQ for pick up
|
Plan resubmittals requested | | | 8/2/2005 | | DONE |
|
|
|
Mailed the architect a copy of plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 8/1/2005 | | 8/2/2005 | | FAIL |
|
|
|
John M.
|
Routing - PLANNING | 7/26/2005 | | 8/1/2005 | | PASS |
|
|
|
Approved per DRH05-00156 and as noted on sheet A-2.
|
Routing - PLUMBING | | | 7/26/2005 | | PASS |
|
|
|
plumbing plan shows a 2" water serice, civil plan shows a 1" service, use a 2". sewer to existing septic tank/ pump chamber OK'd through public works. 12.56" of venting required. floor drains required in the restrooms.
|
Routing - Erosion and Sediment | 7/25/2005 | | 7/26/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/21/2005 | | 7/25/2005 | | FAIL |
|
|
|
Contact Brian Murphy at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 7/21/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/21/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 7/21/2005 | | 7/21/2005 | | PASS |
|
|
|
Approved. Two platted lots combined into one parcel.
|
Application received | | | 7/19/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/19/2005 | | |
|
|
|
|
Fee Review-notes | 7/19/2005 | 7/19/2005 | | | |
|
|
|
|