Permit Information
Permit NumberBLD05-01998
StatusFinaled
Name KOI JAPANESE RESTAURANT
Site Address 800 W IDAHO ST
Project NameTHE MODE BLDG
Customer Number 
ePlanReviewNo
Description
(KOI JAPANESE RESTAURANT - MODE BLDG - 1ST STORY) This building is fire sprinklered to substitute for 1-hr fire-resistance rated construction. To convert an existing 2,098 square foot tenant space located on the 1st story of the "Mode Building" into a restaurant. Work is to include interior nonbearing walls, two grease hoods, a dishwashing hood, millwork, and finishes. Any expansion of this tenant space in the future will require a separate permit. A license agreement with ACHD is required for the encroachment of ducts and equipment into the alley. A license is required from the City Clerk for the 290 square foot sidewalk seating area. The tenant shall contact the City Clerk's office directly for approval. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/29/20068/29/2006 DONE
done
Letter of compliance  3/29/2006 DONE
Letter of Compliance issued 3-29-06.
BLD-Final3/28/20063/28/20063/28/2006PPASS
DetailsDave Hannah
jerry -re-insp -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
BLD-Final3/21/20063/21/20063/21/2006PPART
DetailsDave Hannah
jerry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ
FIRE-Final Inspection3/20/20063/21/20063/21/2006APASS
DetailsForrest France
Items on correction notice have been completed, fire life safety inspection is satisfactory.
Temporary occupancy  3/21/2006 DONE
Temp. Occ. cert. # 5385 issued 3-21-06 to the Koi Japanese Restaurant.
FIRE-Final Inspection3/17/20063/20/20063/20/2006AFAIL
DetailsForrest France
The project related hood and sprinkler permits must be finaled prior to life safety final, storage shelves that extend underneath the cooking hood canopy must be removed, provide max occupant load sign for the dining area, remove keyed locking hardware at the NE door, provide signage at the door to be used as the main entry/exit.
BLD-Framing/Rough-in2/28/20063/1/20063/1/2006APART
DetailsDave Hannah
Gary; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong headers and flr framing for hood venting need letter from engineer oking changes
BLD-Framing/Rough-in1/19/20061/19/20061/19/2006PPASS
DetailsDave Hannah
Jerry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Conference12/1/200512/2/200512/2/2005ADONE
DetailsDave Hannah
jr; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Issue PAID IN FULL permit  10/5/2005 DONE
Telephone call  10/4/2005 DONE
called ###-#### and left voicemail for connie that permit is ready and new fees
Case Summary (BLD)  9/29/2005  
Plan assigned to (CJW)7/26/2005 9/2/2005 PASS
9/2/2005 08:13:38 CJW - activity updated through activity BLDA022 from case BLD05-01998.
Routing - PLAN CHECK9/1/2005 9/2/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/2/2005 DONE
Permit Ready to Issue  9/2/2005 DONE
Inspection Record Card- Bld  9/2/2005 DONE
Print Occupancy Form  9/2/2005 DONE
Telephone call  9/2/2005 DONE
left mess for connie st george at ###-#### that permit is ready
Routing - PLAN CHECK8/23/2005 9/1/2005 PASS
Drawings approved after resubmittal review.
Routing - PUBLIC WORKS9/1/2005 9/1/2005 DONE
Sent back for a re-assessment of sewer fees due to the down sizing of the restaurant.
Plan resubmittals received  8/30/2005  
Received (2) copies of sheet G1.0, A2.1, A2.2, A6.1, A9.1, K-1, M-1 and M-2. Routed to Carl W.
Routing - FIRE8/12/2005 8/23/2005 PASS
review faxed to architect.
1st review completed  8/23/2005 FAIL
failed plan check.
Routing - PLAN CHECK8/1/2005 8/12/2005 FAIL
The IBC plan review was started on August 9, 2005 and was finished on August 12. Revised drawings were required. See the plan review report.
Routing - PLUMBING7/29/2005 8/1/2005 PASS
verify water heater pan and t&p discharge locations. additional cross connection protection may be required. add a water supply at the mop sink for the chemical system. verify thermol expantion protection.
Routing - PUBLIC WORKS7/26/2005 7/29/2005 PASS
Plans ACCEPTED BY PLAN TECH  7/25/2005  
Application received  7/21/2005  
Recd Pcfee & Taken To Pln CK  7/21/2005  
Fee Review-notes7/21/20057/21/2005