Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-02005
StatusFinaled
Name BILL HACKER
Site Address 5800 W FAIRVIEW AVE
Project NameAAA QUICK CASH LOANS
Customer Number 
ePlanReviewNo
Description
(AAA QUICK CASH LOANS) Remodel to the interior of an existing 2,040 sq. ft. building changing use from a retail convenience store to a new office use with some storage per approved plans. Work to include some miscellaneous interior demolition work, some new interior walls, new interior doors and one window, interior finish, new service counter, some minor suspended ceiling work, minor mechanical work, minor plumbing work, and some electrical work. No exterior changes including painting without zoning approvals. Nonseparated Uses per IBC Section 302.3.1. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/20/2008  
Third Notice BLD12/6/200512/6/200512/29/2005 DONE
Second Notice has not been responded to.
Second Notice BLD10/27/200510/27/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 10/4/200510/27/2005 DONE
Permanent occupancy UNPAID FEE  10/4/2005 DONE
Perm. Occ. Cert. # 10763 issued 10-4-05 to AAA Quick Cash Loans.
BLD-Final9/27/20059/29/20059/29/2005APASS
DetailsTom Arcoraci
judy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm when elec signs perm
BLD-Final9/26/20059/27/20059/27/2005PCANC
DetailsTom Arcoraci
early pm please//please call 20 min prior//judy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Inspection cancelled from web by: Marsha Smylie
FIRE-Final Inspection9/26/20059/27/20059/27/2005APASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Final9/20/20059/21/20059/22/2005PNR
DetailsTom Arcoraci
JIM Bartlett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection9/21/20059/21/20059/21/2005PFAIL
DetailsTroy Cobbley
Provide indicator for the main exit lock as discussed and in review notes.
FIRE-Final Inspection9/20/20059/21/20059/21/2005AFAIL
DetailsForrest France
Provide street address numbers, install fire extinguisher as discussed, provide approved hardware at the restroom and back exit doors, verify correct hardware at two doors which are not installed at this time.
BLD-Framing/Rough-in9/19/20059/19/20059/19/2005PPASS
DetailsTom Arcoraci
grid inspection//jim bartlett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Final9/19/20059/19/20059/19/2005PCANC
DetailsTom Arcoraci
grid inspection//jim bartlett; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in9/1/20059/2/20059/2/2005PPART
DetailsTom Arcoraci
###-#### - jim Note: Late as possible pending other rough ins ok
Plan assigned to (JCB)7/26/2005 9/1/2005 PASS
9/1/2005 13:20:30 JCB - activity updated through activity BLDA022 from case BLD05-02005.
Routing - PLANNING8/31/2005 9/1/2005 PASS
Per Sarah Schafer a Zoning Certificate is required because the Fuel Island Canopy was demolished/removed with new parking spaces provided.
Routing - PLAN CHECK8/30/2005 9/1/2005 PASS
Plans to route back to Sarah in Planning.

Approved per attached CZC05-00178.
Routing - PLAN CHECK9/1/2005 9/1/2005 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  9/1/2005 PASS
Inspection Record Card- Bld  9/1/2005 DONE
Print Occupancy Form  9/1/2005 DONE
Permit Ready to Issue  9/1/2005  
Telephone call  9/1/2005 DONE
tlk to jim bartlett - ###-#### that permit and fees are ready to be picked up
Issue PAID IN FULL permit  9/1/2005 DONE
Routing - FIRE8/22/2005 8/30/2005 PASS
No changes required; review comments attached in Tidemark.
1st review completed  8/30/2005 PASS
Plan Reviewer's activity  8/23/2005 DONE
Per Brian Murphy, after explanation from contractor of scope of work where fuel island canopy was demolished, no drainage plan/permit required.
Routing - PLAN CHECK7/27/2005 8/22/2005 PEND
Plan review e-mailed and faxed to architect. Issues concerning the Planning Dept. are to be addressed prior to issuance. Plans to now route to the Fire Dept.
Routing - PUBLIC WORKS7/26/2005 7/27/2005 PASS
Routing - PLANNING7/27/2005 7/27/2005 PASS
Approved. Note: any exterior changes, including paint, requires Design Review approval.
Plans ACCEPTED BY PLAN TECH  7/25/2005  
Application received  7/22/2005  
Recd Pcfee & Taken To Pln CK  7/22/2005  
Permanent Occupancy 6/29/20056/29/2005 DONE
Details
Fee Review-notes7/22/20057/22/2005