Third Notice BLD | 8/18/2006 | 8/18/2006 | 9/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/7/2006 | 7/7/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 6/19/2006 | 6/19/2006 | 7/7/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/19/2006 at 9:34:19 AM. Contact: ###-####. C/C issued.
|
DOC - Permit Finaled | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 6/15/2006 | 6/16/2006 | 6/19/2006 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIRE-Final Inspection | 6/18/2006 | 6/19/2006 | 6/19/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Code Occupancy Approval | 6/16/2006 | 6/16/2006 | 6/16/2006 | P | PASS |
Dena Gambrel
|
|
|
06-16-06 Passed Inspection.
|
FIRE-Final Inspection | 6/14/2006 | 6/15/2006 | 6/15/2006 | A | FAIL |
Troy Cobbley
|
|
|
Contractor did not have approved plans on site. No inspection performed.
|
CHANGE STATUS TO (ISS) | | | 6/14/2006 | | DONE |
|
|
|
per Jim Storey
|
DOC-Permit Expired | 3/15/2006 | 3/15/2006 | 3/15/2006 | | DONE |
Tom Arcoraci
|
|
|
Permit expired by limitations.
|
BLD-Aging Inspection | 1/13/2006 | 1/13/2006 | 1/13/2006 | | NR |
Tom Arcoraci
|
|
|
4-12-06
|
Issue PAID IN FULL permit | | | 10/14/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/7/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2005 | | DONE |
|
|
|
talked to tony wilson at ###-#### that permit is ready
|
Routing - PLAN CHECK | 9/1/2005 | | 9/2/2005 | | PASS |
|
|
|
project scope has changed no buildings only slab on grade, grading and landscaping. MLO
|
Case Summary (BLD) | | | 9/2/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/26/2005 | | 9/2/2005 | | PASS |
|
|
|
9/2/2005 14:21:27 MLO - activity updated through activity BLDA022 from case BLD05-02011.
|
Routing - FIRE | 8/23/2005 | | 9/1/2005 | | PASS |
|
|
|
Fire approval is subject to field verification at the Grading Final inspection that the equipment is enclosed in externally accessible cabinets. If the new equipment enclosure(s) provides access for personnel to enter the enclosure it will be considered a building and require a building permit to verify fire code compliance.
|
Meeting | | | 8/23/2005 | | DONE |
|
|
|
met with Tony Wilson, said shelter will be eliminated and equipement installed outdoors on slab. Tony to see planning for change in project. Permit will change to grading with new slab with associated electrical. Letter must be provided requesting change. MLO
|
Plan resubmittals received | | | 8/23/2005 | | |
|
|
|
Received (1) copy of Anchor spec sheets. Routed to Mike O.
|
Routing - PLANNING | 8/23/2005 | | 8/23/2005 | | PASS |
|
|
|
I spoke with Mike Otto and recieved a request from Tony Wilson on this project. They (Cingular) are removing the equipment enlcosure and are going to leave the equipment pad mounted and exposed. As long as the equipment is painted to match the rest of the area, there are no concerns from the Planning or Design Review standpoint.
|
1st review completed | | | 8/16/2005 | | FAIL |
|
|
|
failed plan check and fire.
|
Routing - PLAN CHECK | 8/16/2005 | | 8/16/2005 | | PEND |
|
|
|
|
Routing - FIRE | 8/5/2005 | | 8/16/2005 | | FAIL |
|
|
|
faxed review comments to architect. Called and discussed lack of production information with with architect. I could not list all potentil hazards in my review but he needs to resubmit details of any fryers or cooking equipment producing grease laden vapors, oil storage (new and used) if applicable. He is not aware of the nature of the operations but will check into it.
|
Routing - PLAN CHECK | 8/3/2005 | | 8/5/2005 | | FAIL |
|
|
|
Mike O.
|
Plan resubmittals requested | | | 8/5/2005 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 7/28/2005 | | 8/3/2005 | | PASS |
|
|
|
Approved per CAA05-00079.
|
Case Summary (BLD) | | | 8/2/2005 | | |
|
|
|
|
Routing - PLUMBING | 7/27/2005 | | 7/28/2005 | | PASS |
|
|
|
no plumbing
|
Routing - Erosion and Sediment | 7/26/2005 | | 7/27/2005 | | PASS |
|
|
|
ESC plan waiver request approved with attached conditions.
|
Routing - PLANNING Land Div | 7/26/2005 | | 7/26/2005 | | PASS |
|
|
|
Approved.
|
Routing - PUBLIC WORKS | 7/26/2005 | | 7/26/2005 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/26/2005 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/26/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/26/2005 | | |
|
|
|
|
Application received | | | 7/22/2005 | | |
|
|
|
|
Fee Review-notes | 7/26/2005 | 7/26/2005 | | | |
|
|
|
|