Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/26/2006 | 5/25/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/26/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10998 issued 4-26-06 to Stratton on the 2nd floor of BODO, Bldg. #4.
|
BLD-Final | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Dave Hannah
|
|
|
Please call Paul for the walk through. ok for perm occ
|
BLD-Final | 4/24/2006 | 4/24/2006 | 4/25/2006 | P | NR |
Dave Hannah
|
|
|
Please check with Forrest prior to arrival. This is 1 of 5 to be signed-off later today. Please call Paul if there is a problem. Thanks.
|
Permanent Occupancy | | 4/25/2006 | 4/25/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Forrest France
|
|
|
Life safety finaled.
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5296 extended for 90 days per Jenifer thru 4-27-06.
|
BLD-Final | 10/31/2005 | 11/1/2005 | 11/1/2005 | P | PART |
Dave Hannah
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ need shel and core finaled and other trades to go final
|
FIRE-Final Inspection | 10/31/2005 | 11/1/2005 | 11/1/2005 | A | PASS |
Forrest France
|
|
|
The non-functional emergency lights have been repaired, fire life safety passed inspection. A temporary approval exists on the related fire alarm permit FIR05-00564 pending resubmittal for a changed EOL.
|
BLD-Final | 10/31/2005 | 10/31/2005 | 11/1/2005 | P | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 10/28/2005 | 10/31/2005 | 11/1/2005 | A | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs fire signoffs
|
Temporary occupancy | | | 11/1/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5296 issued 11-1-05 to Stratton.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/31/2005 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/31/2005 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/31/2005 | | |
|
|
|
needed bld fn
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/28/2005 | | |
|
|
|
need bld fn insp
|
BLD-Framing/Rough-in | 9/8/2005 | 9/9/2005 | 9/9/2005 | A | PASS |
Dave Hannah
|
|
|
Rough framing inspection for Stratton. Call Gary at ###-####. Internet Inspection Request from: Alex Monge ok to cover
|
Case Summary (BLD) | | | 9/2/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/2/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/2/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/1/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/1/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2005 | | DONE |
|
|
|
talked to brandy at ###-#### that permit is ready
|
Plan assigned to (CJW) | 7/28/2005 | | 8/31/2005 | | PASS |
|
|
|
8/31/2005 16:20:26 CJW - activity updated through activity BLDA022 from case BLD05-02024.
|
Routing - FIRE | 8/22/2005 | | 8/31/2005 | | PASS |
|
|
|
Approved with FA conditions needing immeditae attention; review discussed with, and faxed to, architect, W. Steele.
|
1st review completed | | | 8/31/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/31/2005 | | 8/31/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/29/2005 | | 8/22/2005 | | PASS |
|
|
|
IBC plan review started August 18, 2005 and finished August 22, 2005. Drawings approved with corrections. See the plan review report.
|
Routing - PUBLIC WORKS | 7/28/2005 | | 7/29/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2005 | | |
|
|
|
|
Application received | | | 7/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/25/2005 | | |
|
|
|
|
Third Notice BLD | 6/14/2006 | 6/14/2006 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 7/25/2005 | 7/25/2005 | | | |
|
|
|
|