Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 3/7/2008 | 3/7/2008 | 4/23/2008 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/7/2008 | 3/7/2008 | 3/7/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Dave Hannah
|
|
|
|
Permanent Occupancy | | 12/6/2006 | 12/6/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/19/2005 | | DONE |
|
|
|
|
BLD-Final | 12/5/2005 | 12/6/2005 | 12/6/2005 | A | PASS |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
Code Occupancy Approval | 12/5/2005 | 12/5/2005 | 12/5/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met.
|
Temporary occupancy | | | 11/3/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5300 issued 11-3-05 to Visual Arts Collectives.
|
BLD-Final | 9/29/2005 | 9/30/2005 | 9/30/2005 | A | PART |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ needs to fix restrooms to ada also code enforcement sign off
|
FIRE-Final Inspection | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | PASS |
Forrest France
|
|
|
Non approved door hardware at the restrooms has been removed, duct detectors re-tested okay. Fire life safety passed inspection.
|
FIRE-Final Inspection | 9/19/2005 | 9/20/2005 | 9/20/2005 | A | FAIL |
Forrest France
|
|
|
HVAC duct smoke detectors failed to shut down unit upon activation, manual surface bolts at restroom doors are not ADA approved see note #5 on attatched fire code review.
|
FIRE-Final Inspection | 9/15/2005 | 9/16/2005 | 9/16/2005 | A | CANC |
Forrest France
|
|
|
Cancel inspection per Scott, the HVAC duct smoke detectors are not completed.
|
BLD-Framing/Rough-in | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PART |
Dave Hannah
|
|
|
scott ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie block wall in back its up didnt see it grouted
|
BLD-Foundation | 8/21/2005 | 8/22/2005 | 8/22/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/21/2005 at 11:45:50 PM. Contact: ###-####.
|
BLD-Footing | 8/19/2005 | 8/19/2005 | 8/19/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/19/2005 at 8:21:09 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/18/2005 | 8/18/2005 | 8/18/2005 | P | PART |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles restrooms ok
|
BLD-Footing | 8/17/2005 | 8/18/2005 | 8/18/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/17/2005 at 4:27:06 PM. Contact: ###-####.
|
Routing - FIRE | 8/8/2005 | | 8/15/2005 | | PASS |
|
|
|
review faxed to architect.
|
Plan assigned to (JCB) | 7/28/2005 | | 8/15/2005 | | PASS |
|
|
|
8/15/2005 15:19:12 JCB - activity updated through activity BLDA022 from case BLD05-02029.
|
1st review completed | | | 8/15/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/15/2005 | | 8/15/2005 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2005 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/15/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/15/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/15/2005 | | DONE |
|
|
|
left mess for david hale ###-#### that permit is ready
|
Issue PAID IN FULL permit | | | 8/15/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/5/2005 | | 8/8/2005 | | PASS |
|
|
|
ESC plan waiver request approved with attached conditions.
|
Routing - PLAN CHECK | 7/28/2005 | | 8/5/2005 | | PEND |
|
|
|
Permit can be issued when approved by Erosion/Sediment Control and the Fire Dept. Plans to route to these divisions.
|
Telephone call | | | 8/5/2005 | | DONE |
|
|
|
Talked with Bob Tikker concerning some energy code issues. He should be faxing over some information today sometime.
|
Telephone call | | | 8/4/2005 | | DONE |
|
|
|
Talked with architect, Sherry McKibben, concerning energy code issues after discussing with Eric Makela, energy consultant. She is supposed to get back with me and provide additional information.
|
Telephone call | | | 8/4/2005 | | DONE |
|
|
|
Talked with Eric Makela for guidance on energy code issues within the building.
|
Plan resubmittals received | | | 8/3/2005 | | DONE |
|
|
|
Received additional engineering calculations for adequacy of roof to support new HVAC rooftop units, letter stating submitted structural drawings are final, and stating requirement for Special Inspection for epoxy/adhesive anchor installations.
|
Telephone call | | | 8/2/2005 | | DONE |
|
|
|
Called architect to discuss Energy Code alternate submitted. She will get back to me on approach to be pursued.
|
Routing - PUBLIC WORKS | 7/28/2005 | | 7/28/2005 | | PASS |
|
|
|
|
Routing - PLANNING | 7/28/2005 | | 7/28/2005 | | PASS |
|
|
|
Approved.
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2005 | | |
|
|
|
|
Application received | | | 7/25/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/25/2005 | | |
|
|
|
|
Fee Review-notes | 7/25/2005 | 7/25/2005 | | | |
|
|
|
|