Third Notice BLD | 8/18/2006 | 8/18/2006 | 7/25/2018 | | DONE |
Cathy Chiles
|
|
|
This permit finaled on the web by Kyle Watkins
|
Telephone call | | | 2/7/2007 | | DONE |
|
|
|
lft vm with gary concerning the values vary so much - I need his assistance
|
Telephone call | | | 9/15/2006 | | DONE |
|
|
|
tlk to gary regarding the cert of value amnts are too high and said that he would take of it and call me monday
|
Second Notice BLD | 7/7/2006 | 7/7/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/19/2006 | 7/7/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/19/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11086 issued 6-19-06 to the Rolling Hills Charter School modular classroom bldg., Unit B.
|
Permanent Occupancy | | 6/16/2006 | 6/16/2006 | | DONE |
|
|
|
|
BLD-Final | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Jim Sly
|
|
|
nate; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK for Perm Occ.
|
FIRE-Final Inspection | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | NR |
Jim Sly
|
|
|
nate; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Code Occupancy Approval | 12/7/2005 | 12/7/2005 | 12/7/2005 | P | PASS |
Carol Montgomery
|
|
|
Landscaping finally completed. Meets Compliance
|
FIRE-Final Inspection | 12/5/2005 | 12/6/2005 | 12/6/2005 | P | FAIL |
Troy Cobbley
|
|
|
I spoke to Nate about needing resubmittals for the fire alarm and first time submittals for the overhead sprinkler system. No items inspected.
|
Telephone call | | | 10/20/2005 | | DONE |
|
|
|
Talked w/Nate re: status of temp. occ. & they are progressing but slowly
|
Plan resubmittals received | | | 9/22/2005 | | DONE |
|
|
|
Received 1 Transmittal ,1 United Water Flow Sheet dated 9/7/05 showing available flow of 3,000 gpm; doesn't inlcude static pressure which is required for sprinkler design.
|
FIRE-Final Inspection | 9/6/2005 | 9/6/2005 | 9/7/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety in this building "unit B" is satisfactory.
|
Temporary occupancy | | | 9/7/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5268 issued 9-7-05 to the Rolling Hills Charter School.
|
BLD-Final | 9/2/2005 | 9/6/2005 | 9/6/2005 | P | PART |
Jim Sly
|
|
|
nate; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Temp. Need perm Occ from Fire and struct within 90days
|
Case Summary (BLD) | | | 9/6/2005 | | DONE |
|
|
|
|
BLD-Final | 9/2/2005 | 9/2/2005 | 9/2/2005 | P | NR |
Jim Sly
|
|
|
nate; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 9/1/2005 | 9/2/2005 | 9/2/2005 | P | FAIL |
Forrest France
|
|
|
Provide approved door hardware at restrooms, exit sign at west door is not installed, provide one 2A10 BC fire ext.
|
BLD-Foundation | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | CANC |
Jim Sly
|
|
|
christine; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Previously passed by 301
|
BLD-Foundation | 8/29/2005 | 8/29/2005 | 8/29/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2005 at 9:38:08 AM. Contact: ###-####.blk and tie
|
(F) Reprint permit | | | 8/19/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 8/17/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/17/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 7/27/2005 | | 8/9/2005 | | PASS |
|
|
|
8/9/2005 10:20:20 MLO - activity updated through activity BLDA022 from case BLD05-02035.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2005 | | DONE |
|
|
|
called wes steele ###-#### left voicemail permit is ready and fees
|
Routing - FIRE | 8/3/2005 | | 8/8/2005 | | PASS |
|
|
|
review notes faxed to architect.
|
1st review completed | | | 8/8/2005 | | FAIL |
|
|
|
failed plumbing and public works.
|
Routing - PLAN CHECK | 8/1/2005 | | 8/3/2005 | | PASS |
|
|
|
Mike O.
|
Routing - PLANNING | 7/29/2005 | | 8/1/2005 | | PASS |
|
|
|
CUP Pass (Angela Wood)
Okay per DRH05-00247. Site must include landscaping required by the design review approval. (Cody Riddle)
|
Plan resubmittals received | | | 7/29/2005 | | |
|
|
|
Received (7) copies of sheet A1 and (6) copies of sheet L1. Routed to Marleen S.
|
Routing - PUBLIC WORKS | 7/29/2005 | | 7/29/2005 | | PASS |
|
|
|
Rerouting to PW to review sewer line resubmittals.
|
Routing - PLUMBING | 7/29/2005 | | 7/29/2005 | | PASS |
|
|
|
Rerouting to Plumbing to review resubmittals received on this 7/29/05. per resubmitted plans and 2003 upc
|
Routing - Erosion and Sediment | 7/28/2005 | | 7/29/2005 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PLANNING Land Div | 7/29/2005 | | 7/29/2005 | | PASS |
|
|
|
Lot 5, Block 15 Research Center No. 7
|
Routing - PUBLIC WORKS | 7/27/2005 | | 7/28/2005 | | FAIL |
|
|
|
Failed by Jim Pardy, contact number ###-####.
Each building is required to separately connect to public sewer per Boise City code.
|
Routing - PLUMBING | 7/28/2005 | | 7/28/2005 | | FAIL |
|
|
|
see bld05-02034 for review comments
|
Plan routing begun/NEW & ADDTN | | | 7/27/2005 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2005 | | |
|
|
|
|
Application received | | | 7/26/2005 | | |
|
|
|
|