Permit Information
Permit NumberBLD05-02070
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1002 W MAIN ST
Project NameGEM NOBLE BLDG-Asiago's
Customer Number 
ePlanReviewNo
Description
(ASIAGO'S RESTAURANT - GEM NOBLE BLDG - FIRST STORY) This building will be fire sprinklered for building area increase and for story increase. To expand an existing restaurant tenant space into an adjacent area. After the expansion, this tenant space will have a floor area of 3,650 square feet (1,900 square feet for dining, 1,294 square feet for the kitchen, 456 square feet for the mezzanine). This space is located on the 1st story of an existing 2 story with basement historic building (11,400 square foot basement, 11,400 square foot 1st story, 11,500 square foot 2nd story). A permit to renovate the entire building (BLD04-01154) was issued on August 18, 2004. Work is to include 3 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, a grease hood, a dishwashing hood, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  11/25/2009 DONE
DetailsTisha Gallop
called and spoke to Penny/McAlvain Const. she said to fax over request and original certs and she will get them back to me. Faxed to her at ###-####
Third Notice 10/11/200910/22/2009 DONE
Telephone call  10/22/2009 DONE
DetailsTisha Gallop
called Christensen Corp. and they said need to speak with GC on the project, McAlvain Const. because the took over as GC from Jim Campbell at the beginning and finished the project. I called and McAlvain Const and left voice mssg for Tory McAlvain to call me back.
Third Notice 9/28/200910/1/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice 7/20/20099/17/2009 DONE
BLD-Final7/15/20097/20/20097/20/2009APASS
DetailsDave Hannah
Per your request can we final?
FIRE-Final Inspection7/15/20097/20/20097/20/2009APASS
DetailsForrest France
Correction items are complete, fire life safety okayed for final.
Permanent Occupancy UNPAID FEE  7/20/2009 DONE
BLD-Aging Inspection6/8/20096/8/20096/9/2009 PASS
DetailsDave Hannah
BLD-Aging Inspection4/8/20094/8/20094/9/2009 PASS
DetailsDave Hannah
work in progress
BLD-Aging Inspection12/31/200812/31/20081/8/2009 PASS
DetailsDave Hannah
Plan Reviewer's activity  9/12/2008 DONE
DetailsSam Zahorka
Attached Temporary Occupancy extension letter. See documents.
FIRE-Final Inspection8/11/20088/12/20088/18/2008APART
DetailsForrest France
Pending completion of building alarm and fire sprinkler work prior to permit final.
BLD-Final8/11/20088/12/20088/14/2008APART
DetailsDave Hannah
Barb----Forrest/Dave this was given temp on 4-16-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 4-16-07. Please let me know...thanks Phone #: ###-####
Office Staff conference/action  8/14/2008 DONE
DetailsBarbara Stitt
Per Phone call from Dave Hannah-this permit needs to remain in the temp status as part of the Gem Noble Building///8/14/08 BAS
BLD-Aging Inspection3/10/20083/10/20083/10/2008 PASS
DetailsDave Hannah
ok to ext temp occ
Case Summary (BLD)  9/10/2007 DONE
Temporary occupancy  4/18/2007 DONE
Temp. Occ. Cert. # 5566 issued 4-18-07 to Asiago's.
BLD-Final4/16/20074/17/20074/17/2007PPART
DetailsDave Hannah
dan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to occ phase one or west side
BLD-Final4/12/20074/13/20074/16/2007PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/12/2007 at 9:22:40 PM. Contact: ###-####.
Dave H Canc this one on friday.
BLD-Final4/13/20074/16/20074/16/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/13/2007 at 1:25:55 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 16 2007 7:39AM.
FIRE-Final Inspection4/12/20074/13/20074/13/2007APART
DetailsForrest France
Per review notes the shell project FA and FS permits are not required for completion prior to occupancy for this TI, life safety is acceptable for "phase one" of this remodel as the adjacent expansion is not yet complete.
Print Occupancy Form  4/6/2007 DONE
FIRE-Conference3/23/20073/23/20073/23/2007PDONE
DetailsForrest France
On site conference to discuss fire code review notes and items needed for a CO.
(F) Reprint permit  3/13/2007  
(F) Reprint permit  3/13/2007  
BLD-Conference2/26/20072/27/20072/27/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/26/2007 at 10:16:37 AM. Contact: ###-####. wealked project
BLD-Conference1/16/20071/17/20071/18/2007PDONE
DetailsDave Hannah
ALEX; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in11/13/200611/13/200611/13/2006PPART
DetailsDave Hannah
dan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smithok to one side
BLD-Energy code compliance10/4/200610/5/200610/6/2006PPART
DetailsDave Hannah
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt north half of ceiling ok to cover
(F) Reprint permit  7/21/2006 DONE
(F) Reprint permit  7/21/2006  
Routing - PLUMBING7/19/2006 7/20/2006 PASS
per plans and 2003 upc
Routing - PLAN CHECK7/20/2006 7/20/2006 PASS
Routing completed. Resubmitted sheet approved.
Telephone call  7/20/2006 DONE
talked to amy hellmund at ###-#### that permit is ready
Routing - PUBLIC WORKS7/18/2006 7/19/2006 PASS
Grease abatement has changed. Signed off by Walt B.
Plan resubmittals received  7/17/2006  
Received transmittal sheet, 2 copies of equipment specifications from Musgrove engineering, 2 copies of pg. P-110; taken to Carl Westfall
BLD-Aging Inspection1/11/20061/11/20061/13/2006 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  10/12/2005  
Telephone call  10/10/2005 DONE
left mess for amy at ###-#### permit is ready
Override - Parcel Holds  9/9/2005  
Inspection Record Card- Bld  9/9/2005 DONE
Print Occupancy Form  9/9/2005 DONE
Override - Parcel Holds  9/9/2005  
Permit Ready to Issue  9/9/2005 DONE
Telephone call  9/9/2005 DONE
Spoke with Amy and told her that permit is ready & fees///9/9/05 3:05pm BAS
Telephone call  9/9/2005 DONE
Left voice message for Gary told him that permit is ready & fees///9/9/05 3:05pm BAS
Plan assigned to (CJW)8/3/2005 9/8/2005 PASS
9/8/2005 16:02:10 CJW - activity updated through activity BLDA022 from case BLD05-02070.
Routing - PLAN CHECK9/7/2005 9/8/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  9/8/2005 DONE
1st review completed  9/7/2005 FAIL
failed plan check
Routing - FIRE8/24/2005 9/7/2005 PASS
review comments faxed to architect.
Plan resubmittals received  8/26/2005  
Received (2) copies of sheet A-101, A-103 and (1) copy of the 2003 lighing compliance. Routed to Carl W.
Routing - PLAN CHECK8/5/2005 8/24/2005 FAIL
The 2003 IBC plan review was started on August 22, 2005 and was finished on August 24, 2005. Revised drawings were required. See the plan review report.
Routing - PLUMBING8/4/2005 8/5/2005 PASS
pipe floor sink at dish washer to grease waste system.
Routing - PUBLIC WORKS8/3/2005 8/4/2005 PASS
Plans ACCEPTED BY PLAN TECH  8/2/2005  
Override - Parcel Holds  7/28/2005  
Application received  7/28/2005  
Override - Parcel Holds  7/28/2005  
Recd Pcfee & Taken To Pln CK  7/28/2005  
Fee Review-notes7/28/20057/28/2005