Letter of compliance | | | 6/9/2006 | | DONE |
|
|
|
Letter of Compliance issued 6-9-06.
|
BLD-Final | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PEND |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 1:30:26 PM. Contact: ###-####. Will be ok for LC once bond has been posted and public works has finaled.
|
FIRE-Final Inspection | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | NR |
Jim Sly
|
|
|
Phone #: ###-####
|
BLD-Other | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/27/2006 at 10:56:13 AM. Contact: ###-####.
|
BLD-Energy code compliance | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2006 at 10:05:09 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/14/2006 | 4/17/2006 | 4/17/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/14/2006 at 1:49:23 PM. Contact: ###-####. Next to Walgreens Just off fairview
|
BLD-Other | 3/20/2006 | 3/20/2006 | 3/20/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/20/2006 at 8:00:36 AM. Contact: ###-####. Shear attachment at ext walls OK
|
BLD-Foundation | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 10:27:13 AM. Contact: ###-####.
|
BLD-Foundation | 11/11/2005 | 11/15/2005 | 11/15/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/11/2005 at 10:19:45 AM. Contact: ###-####. Just E. of Winco.......2500 PSI Foot OK
|
(F) Reprint permit | | | 10/12/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/11/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/22/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/22/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/22/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/22/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/5/2005 | 8/5/2005 | 9/21/2005 | | PASS |
|
|
|
9/21/2005 14:47:23 JCM - activity updated through activity BLDA022 from case BLD05-02092.
|
Routing - PLANNING | 9/21/2005 | | 9/21/2005 | | PASS |
|
|
|
Approved per DRH05-105.
|
Routing - PLAN CHECK | 9/21/2005 | | 9/21/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2005 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/16/2005 | | 9/16/2005 | | PASS |
|
|
|
Reviewed and approved final faxed response from the project engineer. JCM
|
Routing Off Site - STRUCTURAL | 9/8/2005 | | 9/13/2005 | | FAIL |
|
|
|
Routed resubmittals to AHJ Engineering - Received comment list from the consulting structural engineer requesting additional calculations. JCM
|
Plan resubmittals requested | | | 9/13/2005 | | DONE |
|
|
|
Faxed the architect a copy of the comment from the consulting structural engineer requesting additional submittals. JCM
|
Routing - PLAN CHECK | 9/9/2005 | | 9/12/2005 | | FAIL |
|
|
|
Failed Planning and Structural
|
Plan Reviewer's activity | | | 9/12/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets. JCM
|
Routing - PLANNING | 9/1/2005 | | 9/9/2005 | | FAIL |
|
|
|
Revised landscape has not been submitted to Design Review Staff for review and approval. Also see notes in the August 15, 2005 Planning entry.
|
Plan resubmittals received | | | 9/8/2005 | | DONE |
|
|
|
Received Transmittal Letter, 3 Structural Calcs, & 3 Copys of sheets S0.1,S1.1,S1.2,S2.1,S2.2,S2.3,S2.4 Taken to John M.
|
Routing - PUBLIC WORKS | 8/31/2005 | | 9/1/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/31/2005 | | DONE |
|
|
|
Received 1 Transmittal Letter,2 Drainage Calcs & 2 Copys of sheets C0.01,C1.01,C1.02,C2.01,C3.01 Taken to John M.
|
Routing - PLAN CHECK | 8/24/2005 | | 8/31/2005 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 8/30/2005 | | DONE |
|
|
|
Received 1 Letter of Transmittal , 1 Plan Review Response & 2 Copys of sheets A3.0,E-0,ENO.0 Taken to John M.
|
Routing - FIRE | 8/16/2005 | | 8/24/2005 | | PASS |
|
|
|
review faxed to architect.
|
1st review completed | | | 8/24/2005 | | FAIL |
|
|
|
failed public works, planning, plan check, and structural.
|
Routing Off Site - STRUCTURAL | 8/5/2005 | | 8/22/2005 | | FAIL |
|
|
|
Routed to AHJ Engineering - Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 8/22/2005 | | DONE |
|
|
|
Faxed the architect a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 8/15/2005 | | 8/16/2005 | | FAIL |
|
|
|
Landscape plan does not comply with DRH05-105. Notes have not been indicated for trash enclosure stipulations; condition #14 not met.
|
Routing - PLAN CHECK | 8/16/2005 | | 8/16/2005 | | FAIL |
|
|
|
|
Routing - PLUMBING | 8/11/2005 | | 8/15/2005 | | PASS |
|
|
|
thermol expantion protection required.
|
Routing - Erosion and Sediment | 8/10/2005 | | 8/11/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/8/2005 | | 8/10/2005 | | FAIL |
|
|
|
Drainage plan needs revisions. Contact Jim Wyllie ###-####
|
Plan resubmittals requested | | | 8/10/2005 | | DONE |
|
|
|
Mailed the architect a plan review comment list requesting revisions. JCM
|
Routing - PLANNING Land Div | 8/5/2005 | | 8/8/2005 | | PASS |
|
|
|
Approved as Parcel 1 on ROS 4533.
|
Plans ACCEPTED BY PLAN TECH | | | 8/5/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/5/2005 | | |
|
|
|
|
Application received | | | 8/1/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2005 | | |
|
|
|
|
Fee Review-notes | 8/1/2005 | 8/1/2005 | | | |
|
|
|
|