Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-02097
StatusExpired
Name CHARLIE BROWN
Site Address 2033 E MORTIMER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project in the foothills area is for the addition of an 800s.f. 3-level addition to an existing 3-level single family dwelling. As per the hillside requirements the foundation for the project is fully engineered and;A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. Separate electrical, plumbing, mechanical and ESc permits are required. R-1B ok per Colleen Carroll. All per the approved plans as marked, REScheck, Structural engineering, ESC plan approved by Steve Webb and the plan review notes. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference11/2/200611/2/200611/2/2006PPASS
DetailsDave Hannah
charlie - call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing5/18/20065/19/20065/26/2006APASS
DetailsDave Hannah
charlie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
PubWorks Subgrade Approval5/26/20065/26/20065/26/2006 DONE
Footing subgrade approved by the geotechnicl engineer
BLD-Energy code compliance3/7/20063/7/20063/7/2006PPASS
DetailsMike Jordan
early pm please//charlie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance3/3/20063/6/20063/6/2006PNR
DetailsDave Hannah
Charlie; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Framing/Rough-in3/1/20063/3/20063/3/2006PPASS
DetailsDave Hannah
CHARLIE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate
BLD-Foundation9/2/20059/7/20059/7/2005APASS
DetailsDave Hannah
charlie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing8/31/20059/2/20059/2/2005APASS
DetailsDave Hannah
charlie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
PubWorks Subgrade Approval8/25/20058/25/20058/25/2005 PASS
Footing subgrade approved by geotech
Issue PAID IN FULL permit  8/10/2005 DONE
Inspection Record Card- Bld  8/10/2005 DONE
Inspection Record Card- Bld  8/9/2005 DONE
Permit Ready to Issue  8/9/2005 DONE
Telephone call  8/9/2005 DONE
called Charlie's cell phone told him permit is ready, did not want to know fees
Routing - Erosion and Sediment8/8/2005 8/8/2005 PASS
ESC plan approved with attached conditions.
Case Summary (BLD)  8/8/2005  
PLANS/APPL TAKEN TO FRONT DESK  8/8/2005 DONE
Application received  8/2/2005  
Routing - PLAN CHECK8/8/2005