Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD05-02099
StatusFinaled
Name IMEL CONSTRUCTION
Site Address 2103 N CURTIS RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Early start approved per Steve Monroe///8/25/05 BAS - To construct a 2267sq.ft. (three Bedroom, two bathroom) One story single family dwelling with a 96sq.ft. Covered front porch, a 304sq.ft. Covered rear patio, and a 1333sq.ft. Attached garage/mechanical/storage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the City of Boise. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/10/20061/11/20061/11/2006APASS
DetailsTom Arcoraci
terri imel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled1/11/20061/11/20061/11/2006PPASS
DetailsTom Arcoraci
BLD-Final1/5/20061/6/20061/6/2006ANR
DetailsTom Arcoraci
please call for access///terri; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Energy code compliance11/4/200511/4/200511/4/2005PPASS
DetailsTom Arcoraci
terry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/2/200511/2/200511/2/2005PPASS
DetailsTom Arcoraci
terry --re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/31/200511/1/200511/1/2005PNR
DetailsTom Arcoraci
###-#### - terry
BLD-Energy code compliance10/31/200510/31/200510/31/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/31/2005 at 7:37:45 AM. Contact: ###-####. terry entered wrong inspection 10/31
Issue PAID IN FULL permit  9/13/2005 DONE
Plan assigned to (SRZ)9/9/20059/9/20059/9/2005 PASS
9/9/2005 10:45:23 SRZ - activity updated through activity BLDA022 from case BLD05-02099.
Plan assigned to (SAM)8/2/20058/2/20059/9/2005 DONE
Routing - PLAN CHECK8/22/2005 9/9/2005 PASS
Case Summary (BLD)  9/9/2005  
PLANS/APPL TAKEN TO FRONT DESK  9/9/2005 DONE
ONE SET RED-LINED.
Permit Ready to Issue  9/9/2005 DONE
Inspection Record Card- Bld  9/9/2005  
Telephone call  9/9/2005 DONE
left mess that permit is ready & res person expired
BLD-Footing8/31/20059/1/20059/1/2005PPART
DetailsTom Arcoraci
dave strom ###-#### early start
Early Start Permit  8/25/2005 DONE
Early Start Permit  8/25/2005 DONE
Telephone call  8/25/2005 DONE
Left voice message for Ron & terri that early start permit is ready///8/25/05 BAS
Routing - PUBLIC WORKS8/22/2005 8/22/2005 PASS
Routing - PLANNING8/19/2005 8/19/2005 PASS
met with applicant to modify and note site plan. Site approved as noted. eeg.
Application received  8/2/2005  
Routing - PLANNING8/2/2005   FAIL
driveway width within setback - multiple drive, wall within side yard setback? common drive requirements per survey. eeg