(F) Reprint permit | | | 10/5/2006 | | |
|
|
|
|
BLD-Final | 9/25/2006 | 9/25/2006 | 9/25/2006 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Simpson
|
DOC - Permit Finaled | 9/25/2006 | 9/25/2006 | 9/25/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/12/2006 | 9/13/2006 | 9/13/2006 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Simpson
|
Code Occupancy Approval | | | 9/7/2006 | | PASS |
|
|
|
ok
|
BLD-Framing/Rough-in | 4/20/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson. Allframing and fireblocking issues have been resolved. ok to cover.
|
BLD-Energy code compliance | 4/20/2006 | 4/20/2006 | 4/20/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson
|
BLD-Framing/Rough-in | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | NR |
Mike Jordan
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. work still needs to be completed at mech. chase.
|
BLD-Framing/Rough-in | 4/17/2006 | 4/18/2006 | 4/18/2006 | A | FAIL |
Jim Sly
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong C/N posted Victory Wb of 5 mi L Canonero.......L on.......
|
BLD-Framing/Rough-in | 4/14/2006 | 4/14/2006 | 4/14/2006 | P | PART |
Mike Jordan
|
|
|
Ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All items on c/n have been resolved, except for engineering on floor joist with plumbing penetration. ok to insul.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | FAIL |
Mike Jordan
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All repairs not complete.
|
BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | CANC |
Mike Jordan
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Mike Jordan
|
|
|
###-#### - brian. 1.- Provide engineering for repaired open web joists and for floor joist with plumbing penetrations. 2.- Add additional studs under 2 ply AG truss. 3.- Install header over bathroom enterance upstairs. Provide 5/8 type X rock on either side of ML beams as per approved architects letter. 5.- Provide approved insulation betwwen 1 hr. firewalls for required fireblock. 6.- Complete 5/8 type X rock at 1hr wall at rear of house. Provide approved plans and truss engineering. Do not cover.
|
BLD-Footing | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | PASS |
Tom Arcoraci
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue PAID IN FULL permit | | | 10/4/2005 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/3/2005 | 9/26/2005 | 10/3/2005 | | PASS |
|
|
|
10/3/2005 10:24:55 SAM - activity updated through activity BLDA022 from case BLD05-02118.
|
Routing - PLAN CHECK | 9/9/2005 | | 10/3/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2005 | | DONE |
|
|
|
Spoke with Tanya and told her that permit is ready & fees///10/03/05 12:55pm BAS
|
Case Summary (BLD) | | | 9/27/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/9/2005 | | 9/9/2005 | | PASS |
|
|
|
Lot 15, Block 4, Pepperwood Estates No. 2 (based on Memo from Scott Simpson, dated September 7, 2005)
|
Routing - PLAN CHECK | 8/23/2005 | | 9/8/2005 | | FAIL |
|
|
|
Routed to Planning for approval.
|
Routing - PUBLIC WORKS | 8/23/2005 | | 8/23/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/8/2005 | | 8/8/2005 | | FAIL |
|
|
|
Needs flood plain requirements. Contact Jim Wyllie ###-####
|
Routing - PLANNING | 8/3/2005 | | 8/8/2005 | | PASS |
|
|
|
Routed to Carl Miller per Ada Co. 79-6-PDR
|
Application received | | | 8/3/2005 | | |
|
|
|
|