Telephone call | | | 11/25/2009 | | DONE |
Tisha Gallop
|
|
|
called and spoke to Penny/McAlvain Const. she said to fax over request and original certs and she will get them back to me. Faxed to her at ###-####
|
Third Notice | | 10/11/2009 | 10/22/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2009 | | DONE |
Tisha Gallop
|
|
|
called Christensen Corp. and they said need to speak with GC on the project, McAlvain Const. because the took over as GC from Jim Campbell at the beginning and finished the project. I called and McAlvain Const and left voice mssg for Tory McAlvain to call me back.
|
Third Notice | | 9/28/2009 | 10/1/2009 | | DONE |
|
|
|
|
Second Notice | | 9/17/2009 | 9/18/2009 | | DONE |
|
|
|
|
First Notice | | 7/20/2009 | 9/17/2009 | | DONE |
|
|
|
|
BLD-Final | 7/15/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Dave Hannah
|
|
|
Per your request can we final?
|
FIRE-Final Inspection | 7/15/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled, noted correction items are finished.
|
Permanent Occupancy UNPAID FEE | | | 7/20/2009 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | | PASS |
Dave Hannah
|
|
|
ok to ext
|
Plan Reviewer's activity | | | 9/12/2008 | | DONE |
Sam Zahorka
|
|
|
Attached Temporary Occupancy extension letter. See documents.
|
BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 | A | PART |
Dave Hannah
|
|
|
Barb----Forrest/Dave this was given temp on 6-21-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 6-21-07. Please let me know...thanks Phone #: ###-####
|
Office Staff conference/action | | | 8/14/2008 | | DONE |
Barbara Stitt
|
|
|
Per Phone call from Dave Hannah-this permit needs to remain in the temp status as part of the Gem Noble Building///8/14/08 BAS
|
FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/13/2008 | A | FAIL |
Forrest France
|
|
|
Building renovation is not complete, still need project related shell fire sprinkler and alarm permit finals prior to permanent occupancy certificate.
|
BLD-Aging Inspection | 3/10/2008 | 3/10/2008 | 3/10/2008 | | PASS |
Dave Hannah
|
|
|
ok to ext temp occ
|
BLD-Final | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PART |
Dave Hannah
|
|
|
dan Phone #: ###-#### ok for temp occ
|
Temporary occupancy | | | 6/21/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5610 issued 6-21-07 to Zen Bento.
|
BLD-Final | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | FAIL |
Dave Hannah
|
|
|
needs mec final
|
BLD-Final | 6/19/2007 | 6/19/2007 | 6/19/2007 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/19/2007 at 9:22:04 AM. Contact: ###-####. needs mec final
|
BLD-Final | 6/15/2007 | 6/18/2007 | 6/18/2007 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2007 at 3:59:52 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/15/2007 | 6/18/2007 | 6/18/2007 | P | PART |
Forrest France
|
|
|
c/n items are complete, fire sprinkler and fire alarm work are not ready for final at this time due to incompleted shell work in progress, per review notes tenant is okay for temp. occupancy until building rennovation is finished.
|
BLD-Final | 6/14/2007 | 6/15/2007 | 6/15/2007 | P | NR |
Dave Hannah
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire finals
|
FIRE-Final Inspection | 6/14/2007 | 6/15/2007 | 6/15/2007 | A | FAIL |
Forrest France
|
|
|
Need to final project related hood suppression permit, fire sprinkler work is not complete, fire alarm needs reprogramming, post max. occupant load sign, attatch provided PFE's to the wall as discussed, need signage above the exit door with keyed locking hardware.
|
Print Occupancy Form | | | 4/6/2007 | | DONE |
|
|
|
|
BLD-Other | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PART |
Dave Hannah
|
|
|
dan Note: coverup; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover upper ceiling
|
(F) Reprint permit | | | 3/13/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PASS |
Dave Hannah
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
(F) Reprint permit | | | 7/21/2006 | | DONE |
|
|
|
|
Routing - PLUMBING | 7/19/2006 | | 7/20/2006 | | PASS |
|
|
|
indirect waste piping 5' to 15' must be trapped, over 15' must be trapped and vented. vent may not tie to other sanitary vents.
|
Routing - PLAN CHECK | 7/20/2006 | | 7/20/2006 | | PASS |
|
|
|
Routing completed. Resubmitted sheet approved.
|
Telephone call | | | 7/20/2006 | | DONE |
|
|
|
talked to amy hellmund at ###-#### that permit is ready
|
Routing - PUBLIC WORKS | 7/18/2006 | | 7/19/2006 | | PASS |
|
|
|
Grease abatement has changed. Signed off by Walt B.
|
Plan resubmittals received | | | 7/17/2006 | | |
|
|
|
Received transmittal sheet, 2 copies of equipment specifications from Musgrove Eng., 2 copies of pg. P-110; taken to Carl Westfall
|
BLD-Aging Inspection | 1/11/2006 | 1/11/2006 | 1/13/2006 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 10/12/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/14/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 9/14/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/14/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/14/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/14/2005 | | DONE |
|
|
|
left mess for gary christensen at ###-#### that permit is ready
|
Plan assigned to (CJW) | 8/9/2005 | | 9/13/2005 | | PASS |
|
|
|
9/13/2005 12:59:52 CJW - activity updated through activity BLDA022 from case BLD05-02144.
|
Routing - PLAN CHECK | 9/9/2005 | | 9/13/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2005 | | DONE |
|
|
|
|
Routing - FIRE | 8/25/2005 | | 9/9/2005 | | PASS |
|
|
|
review comments faxed to architect.
|
1st review completed | | | 9/9/2005 | | FAIL |
|
|
|
failed plan check
|
Plan resubmittals received | | | 8/26/2005 | | DONE |
|
|
|
Received 1 Letter & 2 Copys of sheets A-102 ,A-103 Taken to Carl W.
|
Routing - PLAN CHECK | 8/15/2005 | | 8/25/2005 | | FAIL |
|
|
|
The IBC plan review was strated on August 24, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 8/9/2005 | | 8/15/2005 | | PASS |
|
|
|
use upc approved island sink vent at front counter S-1. additional cross connection protection may be required.
|
Routing - PUBLIC WORKS | 8/9/2005 | | 8/9/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/8/2005 | | |
|
|
|
|
Application received | | | 8/4/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 8/4/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 8/4/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/4/2005 | | |
|
|
|
|
Fee Review-notes | 8/4/2005 | 8/4/2005 | | | |
|
|
|
|