Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02144
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1000 W MAIN ST
Project NameGEM NOBLE BLDG-Zen Bento
Customer Number 
ePlanReviewNo
Description
(ZEN BENTO RESTAURANT - GEM NOBLE BLDG - 1ST STORY) This building will be fire sprinklered for building area increase and for story increase. To remodel an existing tenant space for a new restaurant tenant. This tenant space will have a total floor area of about 1,653 square feet (516 square feet for dining, 801 square feet for the kitchen, 199 square feet for the restrooms and janitor's closet, 57 square feet for the office, and 79 square feet for the entrances). This space is located on the 1st story of an existing 2 story with basement historic building (11,400 square foot basement, 11,400 square foot 1st story, 11,500 square foot 2nd story). A permit to renovate the entire building (BLD04-01154) was issued on August 18, 2004. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, a grease hood, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  11/25/2009 DONE
DetailsTisha Gallop
called and spoke to Penny/McAlvain Const. she said to fax over request and original certs and she will get them back to me. Faxed to her at ###-####
Third Notice 10/11/200910/22/2009 DONE
Telephone call  10/22/2009 DONE
DetailsTisha Gallop
called Christensen Corp. and they said need to speak with GC on the project, McAlvain Const. because the took over as GC from Jim Campbell at the beginning and finished the project. I called and McAlvain Const and left voice mssg for Tory McAlvain to call me back.
Third Notice 9/28/200910/1/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice 7/20/20099/17/2009 DONE
BLD-Final7/15/20097/20/20097/20/2009APASS
DetailsDave Hannah
Per your request can we final?
FIRE-Final Inspection7/15/20097/20/20097/20/2009APASS
DetailsForrest France
Fire life safety finaled, noted correction items are finished.
Permanent Occupancy UNPAID FEE  7/20/2009 DONE
BLD-Aging Inspection4/10/20094/10/20094/10/2009 PASS
DetailsDave Hannah
ok to ext
Plan Reviewer's activity  9/12/2008 DONE
DetailsSam Zahorka
Attached Temporary Occupancy extension letter. See documents.
BLD-Final8/11/20088/12/20088/14/2008APART
DetailsDave Hannah
Barb----Forrest/Dave this was given temp on 6-21-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 6-21-07. Please let me know...thanks Phone #: ###-####
Office Staff conference/action  8/14/2008 DONE
DetailsBarbara Stitt
Per Phone call from Dave Hannah-this permit needs to remain in the temp status as part of the Gem Noble Building///8/14/08 BAS
FIRE-Final Inspection8/11/20088/12/20088/13/2008AFAIL
DetailsForrest France
Building renovation is not complete, still need project related shell fire sprinkler and alarm permit finals prior to permanent occupancy certificate.
BLD-Aging Inspection3/10/20083/10/20083/10/2008 PASS
DetailsDave Hannah
ok to ext temp occ
BLD-Final6/20/20076/21/20076/21/2007APART
DetailsDave Hannah
dan Phone #: ###-#### ok for temp occ
Temporary occupancy  6/21/2007 DONE
Temp. Occ. Cert. # 5610 issued 6-21-07 to Zen Bento.
BLD-Final6/19/20076/20/20076/20/2007AFAIL
DetailsDave Hannah
needs mec final
BLD-Final6/19/20076/19/20076/19/2007PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/19/2007 at 9:22:04 AM. Contact: ###-####. needs mec final
BLD-Final6/15/20076/18/20076/18/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/15/2007 at 3:59:52 PM. Contact: ###-####.
FIRE-Final Inspection6/15/20076/18/20076/18/2007PPART
DetailsForrest France
c/n items are complete, fire sprinkler and fire alarm work are not ready for final at this time due to incompleted shell work in progress, per review notes tenant is okay for temp. occupancy until building rennovation is finished.
BLD-Final6/14/20076/15/20076/15/2007PNR
DetailsDave Hannah
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire finals
FIRE-Final Inspection6/14/20076/15/20076/15/2007AFAIL
DetailsForrest France
Need to final project related hood suppression permit, fire sprinkler work is not complete, fire alarm needs reprogramming, post max. occupant load sign, attatch provided PFE's to the wall as discussed, need signage above the exit door with keyed locking hardware.
Print Occupancy Form  4/6/2007 DONE
BLD-Other3/29/20073/29/20073/29/2007PPART
DetailsDave Hannah
dan Note: coverup; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover upper ceiling
(F) Reprint permit  3/13/2007  
BLD-Framing/Rough-in1/24/20071/25/20071/25/2007APASS
DetailsDave Hannah
dan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
(F) Reprint permit  7/21/2006 DONE
Routing - PLUMBING7/19/2006 7/20/2006 PASS
indirect waste piping 5' to 15' must be trapped, over 15' must be trapped and vented. vent may not tie to other sanitary vents.
Routing - PLAN CHECK7/20/2006 7/20/2006 PASS
Routing completed. Resubmitted sheet approved.
Telephone call  7/20/2006 DONE
talked to amy hellmund at ###-#### that permit is ready
Routing - PUBLIC WORKS7/18/2006 7/19/2006 PASS
Grease abatement has changed. Signed off by Walt B.
Plan resubmittals received  7/17/2006  
Received transmittal sheet, 2 copies of equipment specifications from Musgrove Eng., 2 copies of pg. P-110; taken to Carl Westfall
BLD-Aging Inspection1/11/20061/11/20061/13/2006 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  10/12/2005 DONE
Override - Parcel Holds  9/14/2005  
Permit Ready to Issue  9/14/2005 DONE
Override - Parcel Holds  9/14/2005  
Inspection Record Card- Bld  9/14/2005 DONE
Print Occupancy Form  9/14/2005 DONE
Telephone call  9/14/2005 DONE
left mess for gary christensen at ###-#### that permit is ready
Plan assigned to (CJW)8/9/2005 9/13/2005 PASS
9/13/2005 12:59:52 CJW - activity updated through activity BLDA022 from case BLD05-02144.
Routing - PLAN CHECK9/9/2005 9/13/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  9/13/2005 DONE
Routing - FIRE8/25/2005 9/9/2005 PASS
review comments faxed to architect.
1st review completed  9/9/2005 FAIL
failed plan check
Plan resubmittals received  8/26/2005 DONE
Received 1 Letter & 2 Copys of sheets A-102 ,A-103 Taken to Carl W.
Routing - PLAN CHECK8/15/2005 8/25/2005 FAIL
The IBC plan review was strated on August 24, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PLUMBING8/9/2005 8/15/2005 PASS
use upc approved island sink vent at front counter S-1. additional cross connection protection may be required.
Routing - PUBLIC WORKS8/9/2005 8/9/2005 PASS
Plans ACCEPTED BY PLAN TECH  8/8/2005  
Application received  8/4/2005  
Override - Parcel Holds  8/4/2005  
Override - Parcel Holds  8/4/2005  
Recd Pcfee & Taken To Pln CK  8/4/2005  
Fee Review-notes8/4/20058/4/2005