Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02148
StatusFinaled
Name STEED CONSTRUCTION
Site Address 601 W GOWEN RD
Project NameWESTERN POWER SPORTS
Customer Number 
ePlanReviewNo
Description
(Western Power Sports - Warehouse Addition) To construct a 48,600 sq. ft. one story Type IIB warehouse addition to the west side of the existing building. Other work includes all site improvements, paving and landscaping per approved plans DRH00-00241. This buildng is within the airport influence area. The building is fully fire sprinklered with an unlimited area designation. 60 foot open yards around the entire structure must be maintained. Storage racks over 8 feet will require separate plans and permits prior to installation. Separate plans and permits required for the above ground water tank used for fire flow.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/5/20083/5/20083/6/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Fee Review-notes8/9/20058/9/20053/6/2008 DONE
DetailsCathy Brown
Second Notice BLD2/6/20082/6/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 1/15/20082/6/2008 DONE
Code Occupancy Approval  1/15/2008 DONE
Meets requirements under BLD05-02148
Permanent Occupancy  1/15/2008 DONE
PubWorks Occupancy Approval12/20/200712/20/200712/20/2007 DONE
Print Occupancy Form  12/10/2007 DONE
BLD-Final12/6/200712/7/200712/7/2007APASS
DetailsJim Storey
odie Phone #: ###-####final ok no card on site
FIRE-Final Inspection11/27/200711/27/200712/5/2007PPASS
DetailsForrest France
Fire life safety inspection passed, one missing extinguisher installed while on site, also noted exit paths to remain clear at all times, exit doors cannot be blocked or obstructed- pallets and boxes at the SW exit door to be removed immediately, inspection record card not available on site for signature.
FIRE-Final Inspection11/19/200711/20/200711/20/2007ANR
DetailsForrest France
Need project related fire sprinkler permit FIR06-00438 finaled prior to life safety final, need approved plans and review notes on site for verification of compliance at next site visit.
BLD-Aging Inspection10/30/200710/30/200710/30/2007 NR
DetailsJim Storey
no call for insp pending others
BLD-Aging Inspection8/13/20078/13/20078/13/2007 PASS
DetailsJim Storey
wip
BLD-Aging Inspection5/9/20075/9/20075/14/2007 DEFR
DetailsJim Storey
pending others
BLD-Aging Inspection2/26/20072/26/20072/27/2007PCANC
DetailsJoe R Venneman
301
BLD-Aging Inspection2/26/20072/26/20072/26/2007 DEFR
DetailsJim Storey
cod and fire
BLD-Aging Inspection12/25/200612/25/200612/26/2006 NR
DetailsJim Storey
fire plan review
BLD-Aging Inspection10/23/200610/23/200610/23/2006 DEFR
DetailsJim Storey
pending fire/ncfi
BLD-Aging Inspection8/21/20068/21/20068/21/2006 PART
DetailsJim Storey
wip
BLD-Framing/Rough-in6/16/20066/19/20066/19/2006APART
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for floor storage of product only.
FIRE-Final Inspection6/15/20066/16/20066/16/2006AFAIL
DetailsForrest France
Not all required provisions for life safety final have been met at this stage of building completion, need adequate FD access around new addition, three exit signs above old exits from the existing south wall to be covered if exits are no longer to be used, exit door hardware, exit signs, emergency lights an PFE's in the new addition are acceptable for those portions installed, the racking in the new addition is not to be utilized until permitted and approved.
Plan resubmittals received  6/14/2006  
Received 2 letters to Sam R. & 1 11x17 sheet 1 of 1 taken to Sam R. Permit issued 11-9-05 ///dld
BLD-Framing/Rough-in5/16/20065/17/20065/17/2006APASS
DetailsJim Storey
odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Aging Inspection5/1/20065/1/20065/1/2006 PASS
DetailsJim Storey
pending si reports.
Meeting  4/25/2006  
Meeting  4/25/2006 DONE
I had an unscheduled "walk-in" meeting with Odie Steiger, Steed Const, requesting how close they should locate the well to the building. I knew nothing of a well and this led to a conference telcon with Wes Steel, Habitec and Scott Raymes, Steed who explained the tank will cost $300K and they can save $100K by using a well so that's what they are trying to do. I explained we had not approved a well, only a fire tank and pump and I couldn't agree to such an alternative or give them design requirements over the phone. I requested they resubmit a plan modification showing the specific well design they propose, including well water supply analysis, their preferred location, the well (fire) pump spec's and pump house construction details, which we could review for code compliance and then discuss any concerns with them. Due to my lack of experience with using a single private well for direct fire protection water supplies, I recommended they have the design done and stamped by an PE or FPE who is experienced in well design for fire protection purposes, who can substantiate that the design meets NFPA requirements including for instance, NFPA 20, 7.2.1, or other equivalent nationally recognized standard(s) for wells intended for fire protection purposes. To the specific question they were asking, "how far the well has to be from the building", I suggested they propose using the location of the tank and pump as shown on the approved building plans. They indicated this would be too expensive to get power to it. We concluded with an agreement that they would prepare and submit a specific proposal as a plan modification and then we will review/discuss it further. I indicated that the FD may have a 3rd party review, as allowed by IFC; if they feel it is needed after reviewing the proposal.
BLD-Concrete2/24/20062/27/20062/27/2006APART
DetailsTom Arcoraci
re-bar and concrete wall inspection//mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa si on site
BLD-Aging Inspection2/8/20062/8/20062/8/2006 PART
DetailsJim Storey
work being insp. by si.
PLANS/APPL TAKEN TO FRONT DESK  11/9/2005 DONE
Print Occupancy Form  11/9/2005 DONE
Permit Ready to Issue  11/9/2005 DONE
Telephone call  11/9/2005 DONE
called ###-#### and told Wes that permit is ready and fees and need ACHD
Issue PAID IN FULL permit  11/9/2005  
Plan assigned to (MLO)8/9/2005 11/9/2005 PASS
11/9/2005 08:04:46 MLO - activity updated through activity BLDA022 from case BLD05-02148.
Routing - FIRE10/24/2005 11/7/2005 PASS
resubmittal acceptable with conditions; revised review faxed to architect.
Routing - PLAN CHECK10/26/2005 10/26/2005 PASS
Routing Off Site - STRUCTURAL10/17/2005 10/26/2005 PASS
Routing - PUBLIC WORKS10/18/2005 10/24/2005 PASS
Plan Reviewer's activity  10/18/2005 DONE
Showed water tank to Martin Santoyo no problem no further review required.
Routing - PLAN CHECK10/14/2005 10/18/2005 PEND
pending structural approval.
Plan resubmittals received  10/14/2005 DONE
Received 2 Storm Water Management Plan ,2 Structural Calcs,1 Response to Structural Plan Review Comments,1Project Start up for special inspections,1 Plan check comments,1 Fire department comments,1 United water,1 Document transmittal,7 Copys of sheets C3,C4,C7, 4Copys of sheet S4,A2.1,A2.2,A3.1,A4.1,E1.3,E1.2,E1.1 Taken to Mike Otto
Routing - AIRPORT8/30/2005 9/30/2005 PASS
previous approval from 6/14/2001.
1st review completed  9/10/2005 FAIL
failed plan check, structural, and fire.
Routing - PLAN CHECK9/10/2005 9/10/2005 PEND
Routing - FIRE8/26/2005 9/9/2005 FAIL
Inadequate water for size of building with proposed addition. Letter from architect requesting exemption from this requirement was forwarded to the fire marshal for consideration. Full review comments faxed to architect on 9/10.
Routing Off Site - STRUCTURAL8/9/2005 8/26/2005 FAIL
Routed to Stapley Engineering -corrections sent to architect
Plan resubmittals requested  8/26/2005 DONE
IBC corrections
Routing - PLAN CHECK8/18/2005 8/26/2005 FAIL
corrections sent to architect
Routing - PLANNING8/15/2005 8/18/2005 PASS
Approved.
Routing - PLUMBING8/12/2005 8/15/2005 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS8/10/2005 8/12/2005 FAIL
DRAINAGE PLAN DEFICIENCIES: JIM WYLLIE ###-####
Routing - Erosion and Sediment8/12/2005 8/12/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING Land Div8/9/2005 8/10/2005 PASS
Approved, site is over 5 acres in size.
Recd Pcfee & Taken To Pln CK  8/9/2005  
Plans ACCEPTED BY PLAN TECH  8/9/2005  
Plan routing begun/NEW & ADDTN  8/9/2005  
Application received  8/4/2005