Third Notice BLD | 3/5/2008 | 3/5/2008 | 3/6/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 8/9/2005 | 8/9/2005 | 3/6/2008 | | DONE |
Cathy Brown
|
|
|
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/15/2008 | 2/6/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 1/15/2008 | | DONE |
|
|
|
Meets requirements under BLD05-02148
|
Permanent Occupancy | | | 1/15/2008 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 12/20/2007 | 12/20/2007 | 12/20/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/10/2007 | | DONE |
|
|
|
|
BLD-Final | 12/6/2007 | 12/7/2007 | 12/7/2007 | A | PASS |
Jim Storey
|
|
|
odie Phone #: ###-####final ok no card on site
|
FIRE-Final Inspection | 11/27/2007 | 11/27/2007 | 12/5/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, one missing extinguisher installed while on site, also noted exit paths to remain clear at all times, exit doors cannot be blocked or obstructed- pallets and boxes at the SW exit door to be removed immediately, inspection record card not available on site for signature.
|
FIRE-Final Inspection | 11/19/2007 | 11/20/2007 | 11/20/2007 | A | NR |
Forrest France
|
|
|
Need project related fire sprinkler permit FIR06-00438 finaled prior to life safety final, need approved plans and review notes on site for verification of compliance at next site visit.
|
BLD-Aging Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | | NR |
Jim Storey
|
|
|
no call for insp pending others
|
BLD-Aging Inspection | 8/13/2007 | 8/13/2007 | 8/13/2007 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 5/9/2007 | 5/9/2007 | 5/14/2007 | | DEFR |
Jim Storey
|
|
|
pending others
|
BLD-Aging Inspection | 2/26/2007 | 2/26/2007 | 2/27/2007 | P | CANC |
Joe R Venneman
|
|
|
301
|
BLD-Aging Inspection | 2/26/2007 | 2/26/2007 | 2/26/2007 | | DEFR |
Jim Storey
|
|
|
cod and fire
|
BLD-Aging Inspection | 12/25/2006 | 12/25/2006 | 12/26/2006 | | NR |
Jim Storey
|
|
|
fire plan review
|
BLD-Aging Inspection | 10/23/2006 | 10/23/2006 | 10/23/2006 | | DEFR |
Jim Storey
|
|
|
pending fire/ncfi
|
BLD-Aging Inspection | 8/21/2006 | 8/21/2006 | 8/21/2006 | | PART |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 6/16/2006 | 6/19/2006 | 6/19/2006 | A | PART |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for floor storage of product only.
|
FIRE-Final Inspection | 6/15/2006 | 6/16/2006 | 6/16/2006 | A | FAIL |
Forrest France
|
|
|
Not all required provisions for life safety final have been met at this stage of building completion, need adequate FD access around new addition, three exit signs above old exits from the existing south wall to be covered if exits are no longer to be used, exit door hardware, exit signs, emergency lights an PFE's in the new addition are acceptable for those portions installed, the racking in the new addition is not to be utilized until permitted and approved.
|
Plan resubmittals received | | | 6/14/2006 | | |
|
|
|
Received 2 letters to Sam R. & 1 11x17 sheet 1 of 1 taken to Sam R. Permit issued 11-9-05 ///dld
|
BLD-Framing/Rough-in | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | PASS |
Jim Storey
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Aging Inspection | 5/1/2006 | 5/1/2006 | 5/1/2006 | | PASS |
Jim Storey
|
|
|
pending si reports.
|
Meeting | | | 4/25/2006 | | |
|
|
|
|
Meeting | | | 4/25/2006 | | DONE |
|
|
|
I had an unscheduled "walk-in" meeting with Odie Steiger, Steed Const, requesting how close they should locate the well to the building. I knew nothing of a well and this led to a conference telcon with Wes Steel, Habitec and Scott Raymes, Steed who explained the tank will cost $300K and they can save $100K by using a well so that's what they are trying to do. I explained we had not approved a well, only a fire tank and pump and I couldn't agree to such an alternative or give them design requirements over the phone. I requested they resubmit a plan modification showing the specific well design they propose, including well water supply analysis, their preferred location, the well (fire) pump spec's and pump house construction details, which we could review for code compliance and then discuss any concerns with them. Due to my lack of experience with using a single private well for direct fire protection water supplies, I recommended they have the design done and stamped by an PE or FPE who is experienced in well design for fire protection purposes, who can substantiate that the design meets NFPA requirements including for instance, NFPA 20, 7.2.1, or other equivalent nationally recognized standard(s) for wells intended for fire protection purposes. To the specific question they were asking, "how far the well has to be from the building", I suggested they propose using the location of the tank and pump as shown on the approved building plans. They indicated this would be too expensive to get power to it. We concluded with an agreement that they would prepare and submit a specific proposal as a plan modification and then we will review/discuss it further. I indicated that the FD may have a 3rd party review, as allowed by IFC; if they feel it is needed after reviewing the proposal.
|
BLD-Concrete | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PART |
Tom Arcoraci
|
|
|
re-bar and concrete wall inspection//mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa si on site
|
BLD-Aging Inspection | 2/8/2006 | 2/8/2006 | 2/8/2006 | | PART |
Jim Storey
|
|
|
work being insp. by si.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2005 | | DONE |
|
|
|
called ###-#### and told Wes that permit is ready and fees and need ACHD
|
Issue PAID IN FULL permit | | | 11/9/2005 | | |
|
|
|
|
Plan assigned to (MLO) | 8/9/2005 | | 11/9/2005 | | PASS |
|
|
|
11/9/2005 08:04:46 MLO - activity updated through activity BLDA022 from case BLD05-02148.
|
Routing - FIRE | 10/24/2005 | | 11/7/2005 | | PASS |
|
|
|
resubmittal acceptable with conditions; revised review faxed to architect.
|
Routing - PLAN CHECK | 10/26/2005 | | 10/26/2005 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/17/2005 | | 10/26/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/18/2005 | | 10/24/2005 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 10/18/2005 | | DONE |
|
|
|
Showed water tank to Martin Santoyo no problem no further review required.
|
Routing - PLAN CHECK | 10/14/2005 | | 10/18/2005 | | PEND |
|
|
|
pending structural approval.
|
Plan resubmittals received | | | 10/14/2005 | | DONE |
|
|
|
Received 2 Storm Water Management Plan ,2 Structural Calcs,1 Response to Structural Plan Review Comments,1Project Start up for special inspections,1 Plan check comments,1 Fire department comments,1 United water,1 Document transmittal,7 Copys of sheets C3,C4,C7, 4Copys of sheet S4,A2.1,A2.2,A3.1,A4.1,E1.3,E1.2,E1.1 Taken to Mike Otto
|
Routing - AIRPORT | 8/30/2005 | | 9/30/2005 | | PASS |
|
|
|
previous approval from 6/14/2001.
|
1st review completed | | | 9/10/2005 | | FAIL |
|
|
|
failed plan check, structural, and fire.
|
Routing - PLAN CHECK | 9/10/2005 | | 9/10/2005 | | PEND |
|
|
|
|
Routing - FIRE | 8/26/2005 | | 9/9/2005 | | FAIL |
|
|
|
Inadequate water for size of building with proposed addition. Letter from architect requesting exemption from this requirement was forwarded to the fire marshal for consideration. Full review comments faxed to architect on 9/10.
|
Routing Off Site - STRUCTURAL | 8/9/2005 | | 8/26/2005 | | FAIL |
|
|
|
Routed to Stapley Engineering -corrections sent to architect
|
Plan resubmittals requested | | | 8/26/2005 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 8/18/2005 | | 8/26/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 8/15/2005 | | 8/18/2005 | | PASS |
|
|
|
Approved.
|
Routing - PLUMBING | 8/12/2005 | | 8/15/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 8/10/2005 | | 8/12/2005 | | FAIL |
|
|
|
DRAINAGE PLAN DEFICIENCIES: JIM WYLLIE ###-####
|
Routing - Erosion and Sediment | 8/12/2005 | | 8/12/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 8/9/2005 | | 8/10/2005 | | PASS |
|
|
|
Approved, site is over 5 acres in size.
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2005 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/9/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/9/2005 | | |
|
|
|
|
Application received | | | 8/4/2005 | | |
|
|
|
|