Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-02160
StatusFinaled
Name MANDARIN PALACE
Site Address 5020 W FRANKLIN RD
Project NameMANDARIN PALACE
Customer Number 
ePlanReviewNo
Description
*(Mandarin Palace)* To replace kitchen equipment, modify existing grease duct system by replacing exhaust fans on the exterior of the building & interlocking make up air with exhaust, plumb additional sinks, replace floor finish in the kitchen area all per approved engineering plans and mechanical department review. This does not establish a new certificate of occupancy. There is an existing certificate of occupancy issued under #1874. The fire supression system for the existing hood system was installed in 2004 and approved by Boise City PDS fire inspector. This system will need to be field verifed that it has had an annual service. (rmh)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD10/12/200510/12/200512/6/2005 DONE
First Notice has not been responded to.
First Notice9/30/20059/30/200510/12/2005 DONE
DetailsTom Arcoraci
BLD-Final9/29/20059/30/20059/30/2005PPASS
DetailsTom Arcoraci
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection9/29/20059/30/20059/30/2005PPASS
DetailsTroy Cobbley
Fire life safety finaled
DOC - Permit Finaled9/30/20059/30/20059/30/2005PPASS
DetailsTom Arcoraci
BLD-Final9/23/20059/26/20059/26/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/23/2005 at 3:42:59 PM. Contact: ###-####.
FIRE-Final Inspection9/24/20059/26/20059/26/2005AFAIL
DetailsTroy Cobbley
Provide re-certification for the hood suppression system. Air balance reports is ok. Exhaust and makeup air are interconnected.
Issue PAID IN FULL permit  8/17/2005 DONE
Plan assigned to (R_H)8/10/20058/10/20058/16/2005 PASS
8/16/2005 15:25:21 RMH - activity updated through activity BLDA022 from case BLD05-02160.
Routing - PLUMBING8/10/2005 8/16/2005 PASS
Plumbing plan in on 08/15/05. Approved per plan and 2003 UPC on 08/16/05. Mechanical plans also submitted as required by correction and stop work.
Case Summary (BLD)  8/16/2005 DONE
Routing - MECHANICAL8/16/2005 8/16/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/16/2005 DONE
Inspection Record Card- Bld  8/16/2005 DONE
Permit Ready to Issue  8/16/2005  
Additional plans submitted  8/12/2005  
Submitted (3) copies of sheet P-1 (Plumbing Floor Plan - Kitchen Area). Routed to Lee R.
Plans ACCEPTED BY PLAN TECH  8/10/2005  
Override - Parcel Holds  8/5/2005  
Application received  8/5/2005  
Override - Parcel Holds  8/5/2005  
Recd Pcfee & Taken To Pln CK  8/5/2005  
Fee Review-notes8/5/20058/5/2005