Third Notice BLD | 6/14/2006 | 6/14/2006 | 8/25/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/14/2006 | 4/14/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/29/2006 | 4/14/2006 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 3/29/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10953 issued 3-29-06 to the Orchard Express Chevron C Store.
|
Code Occupancy Approval | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PASS |
Dena Gambrel
|
|
|
03-24-06 Site inspection showed that the fence has been installed. Bond O.K. to be released.
|
Permanent Occupancy | | 3/27/2006 | 3/27/2006 | | DONE |
|
|
|
|
BLD-Final | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: David Mortensen ok for perm when code enf signs perm
|
FIRE-Final Inspection | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Structural inspector will verify that the indicator and address is installed.
|
Code Occupancy Approval Temp | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Dena Gambrel
|
|
|
The 8 additional plants are planted and Cathy has received bond money for the fence.
|
Temporary occupancy | | | 2/28/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5377 issued 2-28-06 to the Chevron C Store.
|
FIRE-Final Inspection | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | FAIL |
Troy Cobbley
|
|
|
Lower the fire extinguisher in the storage room. Provide a fire extinguisher for the gas islands. Provide indicator for the main exit. Provide address for the Bethal street side of the building. Provide the correct remote annunciators for the duct smoke detectors.
|
BLD-Final | 2/24/2006 | 2/27/2006 | 2/27/2006 | P | NR |
Tom Arcoraci
|
|
|
Come late in the afternoon if you can thanks David; Phone #: ###-#### Internet Inspection Request from: David Mortensen
|
Code Occupancy Approval | | | 2/27/2006 | | FAIL |
Dena Gambrel
|
|
|
02-27-06 Failed Occupancy. Need 8 more plants to the north side of building. They will have these in by late this afternooon. The fence to the west betweeen Chevron and neighbor has been cut down. They will need to bond for the fence (Bond amount is $862.00).
|
BLD-Energy code compliance | 1/17/2006 | 1/17/2006 | 1/17/2006 | A | PASS |
Tom Arcoraci
|
|
|
key is with Casheir; Phone #: ###-#### Internet Inspection Request from: David Mortensen
|
BLD-Framing/Rough-in | 1/11/2006 | 1/12/2006 | 1/12/2006 | A | PASS |
Tom Arcoraci
|
|
|
Engineering is with cheveron casher. ; Phone #: ###-#### Internet Inspection Request from: David Mortenseno cover lid
|
BLD-Framing/Rough-in | 1/9/2006 | 1/10/2006 | 1/10/2006 | P | FAIL |
Tom Arcoraci
|
|
|
building is open the aproved plans are with the chevron casher. and the signing card. thanks David ; Phone #: ###-#### Internet Inspection Request from: David Mortensen
|
BLD-Aging Inspection | 12/30/2005 | 12/30/2005 | 12/30/2005 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 10/28/2005 | 10/28/2005 | 10/28/2005 | P | PASS |
Tom Arcoraci
|
|
|
mannis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/26/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Tom Arcoraci
|
|
|
###-####///plans in car wash area
|
(F) Reprint permit | | | 10/26/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/25/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/29/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2005 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (MLO) | 8/11/2005 | | 9/29/2005 | | PASS |
|
|
|
9/29/2005 08:54:02 MLO - activity updated through activity BLDA022 from case BLD05-02175.
|
Routing - PLANNING | 9/23/2005 | | 9/28/2005 | | PASS |
|
|
|
approved.
|
Plan resubmittals received | | | 9/26/2005 | | DONE |
|
|
|
Received 2 copies of plan sheets A-4 and L-1 and forwarded to Mike O.
|
Routing - PLAN CHECK | 9/23/2005 | | 9/23/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/22/2005 | | DONE |
|
|
|
Received 2 Panel Systems & 2 Copys of sheet A-3,A-4 Taken to Mike O.
|
1st review completed | | | 9/16/2005 | | FAIL |
|
|
|
failled planning and plan check.
|
Routing - PLAN CHECK | 9/16/2005 | | 9/16/2005 | | PEND |
|
|
|
|
Routing - FIRE | 8/31/2005 | | 9/16/2005 | | PASS |
|
|
|
review comments attached; not faxed as architect provided no fax number.
|
Routing - PLAN CHECK | 8/25/2005 | | 8/31/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 8/31/2005 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 8/23/2005 | | 8/25/2005 | | FAIL |
|
|
|
It appears that most of the Design Review, DRH05-00136, conditions have been addressed on the building permit plans; however, revised plans have not been resubmitted to Design Review staff. Also, condition 1i is not met. Either the masonry wainscot needs to be provided along the north wall, or at least wrap the north wall for 7-10 ft., then dense landscaping from the point back to the west, or dense landscaping all along the north wall.
|
Routing - PLUMBING | 8/17/2005 | | 8/23/2005 | | PASS |
|
|
|
per plans and 2003 upc, limited review due to time constraints.
|
Routing - Erosion and Sediment | 8/16/2005 | | 8/17/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/11/2005 | | 8/16/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/11/2005 | | 8/11/2005 | | PASS |
|
|
|
Approved as Parcel 1 on ROS 3391.
|
Plans ACCEPTED BY PLAN TECH | | | 8/11/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/11/2005 | | |
|
|
|
|
Application received | | | 8/8/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/8/2005 | | |
|
|
|
|
Fee Review-notes | 8/8/2005 | 8/8/2005 | | | |
|
|
|
|