Third Notice BLD | 3/15/2006 | 3/15/2006 | 3/30/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 3/1/2006 | 3/1/2006 | 3/15/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/3/2006 | 3/1/2006 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 2/3/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10894 issued 2-3-06 to Anchor Blue at Boise Towne Square.
|
BLD-Final | 1/10/2006 | 1/10/2006 | 1/10/2006 | P | PASS |
Mike Jordan
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ok for perm occ. New doors installed with automatic flush bolts and indicator.
|
Permanent Occupancy | | 1/10/2006 | 1/10/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/4/2006 | | DONE |
|
|
|
Spoke with Fred from Nu Mechanical (MEC sub) and Nick from Drake Mechanical (PLM sub)regarding final value difference from GC, fred looked up the project and thier was a change order to make final value of $57,220. Nick didn't have a ny change orders and was going to fax me a copy of the contract///1/4/06 BAS
|
Temporary occupancy | | | 11/8/2005 | | |
|
|
|
Temp. Occ. Cert. # 5303 issued 11-8-05 to Anchor Blue at Boise Towne Square Mall.
|
BLD-Final | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | PEND |
Mike Jordan
|
|
|
Temp occ given. Needs final from mech. Also needs to install code compliant locks on doors. Contractor has ordered new doors. Existing doors have been approved gor use by G. Slane as long as doors are able to be locked in an open position while store is open for bussiness. Temporary latches have been installed in the floor allowing the door to be locked in the open position.
|
BLD-Final | 11/1/2005 | 11/3/2005 | 11/3/2005 | P | FAIL |
Mike Jordan
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Incorrect locking mechanism on paired egress doors.
|
FIRE-Final Inspection | 11/1/2005 | 11/3/2005 | 11/3/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | FAIL |
Troy Cobbley
|
|
|
robert; Phone #: ###-#### The only life safety items ready to look at was the smoke control and the duct smoke detectors of which both passed. Exit signs to and in the rear corridor did not work. Needs an additional fire extinguisher.
|
BLD-Framing/Rough-in | 10/11/2005 | 10/11/2005 | 10/11/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/11/2005 at 7:06:21 AM. Contact: ###-####.coridor ok for cover as well as west fur out wall.1 hr
|
BLD-Framing/Rough-in | 10/6/2005 | 10/7/2005 | 10/7/2005 | A | PART |
Jim Sly
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Partial framing ...storefront, restrooms, corridor, partition walls OK. Discussed issues with framer about continuity of 1hr fire partition walls between tenants. Have not framed wall between existing 2hr stair tower and new 1hr corridor.....This will cause a problem with transition from 2hr to 1hr rating.....Need continuous membrane in these areas for rating.... Need to call for inspections as needed and not cover areas effected until we inspect them. Need to verify existing Fire partition walls are fire stopped floor to roof deck.
|
BLD-Framing/Rough-in | 10/5/2005 | 10/6/2005 | 10/6/2005 | P | DEFR |
Jim Storey
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time rolled to am.
|
Routing - PLAN CHECK | 9/26/2005 | | 10/3/2005 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 8/16/2005 | | 10/3/2005 | | PASS |
|
|
|
10/3/2005 09:18:19 RMH - activity updated through activity BLDA022 from case BLD05-02196.
|
Case Summary (BLD) | | | 10/3/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/3/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2005 | | DONE |
|
|
|
Spoke with Robert (GC) and told him that permit is ready & fees///10/03/05 2:54pm BAS
|
Telephone call | | | 10/3/2005 | | DONE |
|
|
|
Left voice message for Randy Belling and told him that permit is ready & fees///10/03/05 3:00pm BAS
|
Issue PAID IN FULL permit | | | 10/3/2005 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2005 | | FAIL |
|
|
|
Called and talked to Randy Delling the architect at 1-800 ###-####, The resubmittals were incomplete and did not address the storage room that was created that opens into the vertical exit enclosure.
|
1st review completed | | | 9/26/2005 | | FAIL |
|
|
|
Failed plan check
|
Routing - FIRE | 9/8/2005 | | 9/26/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/22/2005 | | |
|
|
|
Received (4) copies of sheet A000, ASP1, D100, A100, A101, A102, A103, A200, A300, A400, A500, A501, A502, A600, A601, F100, C100, M100, M200, M300, P100, E100, E101, E200, E201, E300 and S1. Also received (2) sets of structural calcs. Routed to Ron H.
|
Routing - PLAN CHECK | 8/17/2005 | | 9/7/2005 | | FAIL |
|
|
|
Faxed and mailed corrections to architect on 9/8/05, routed to fire same day
|
Routing - PUBLIC WORKS | 8/16/2005 | | 8/17/2005 | | |
|
|
|
|
Additional plans submitted | | | 8/16/2005 | | |
|
|
|
Received (3) copies of sheet S1 and S2. Also received (3) copies of structural calcs. Routed to Ron H.
|
Plans ACCEPTED BY PLAN TECH | | | 8/11/2005 | | |
|
|
|
|
Application received | | | 8/9/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2005 | | |
|
|
|
|
Fee Review-notes | 8/9/2005 | 8/9/2005 | | | |
|
|
|
|