Case Summary (BLD) | | | 3/24/2015 | | DONE |
|
|
|
|
Second Notice BLD | 9/13/2007 | 9/13/2007 | 9/13/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/23/2007 | 9/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/23/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/10/2007 | 8/10/2007 | 8/13/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 8/13/2007 | 8/13/2007 | 8/13/2007 | P | PASS |
Dave Hannah
|
|
|
ok for perm occ
|
BLD-Final | 8/2/2007 | 8/2/2007 | 8/7/2007 | P | NR |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/2/2007 | 8/2/2007 | 8/2/2007 | P | FAIL |
Forrest France
|
|
|
Final pending project related fire alarm permit FIR07-00627 inspection request, approval and final.
|
Meeting | | | 7/30/2007 | | DONE |
|
|
|
Per onsite meeting 7/27/07, Deputy Chief Dave Hanneman, Fire Marshal, approved standpipes in stairwells only, as acceptable to serve the horizontal exit separating section 1and Section 2.
|
BLD-Final | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | NR |
Dave Hannah
|
|
|
daryl Phone #: ###-####need fire doors at horz exit fixed and stand pipe issue resolved and ok from fire on alarms and spinklers
|
Code Occupancy Approval | | | 7/19/2007 | | DONE |
|
|
|
|
BLD-Final | 5/2/2007 | 5/2/2007 | 5/4/2007 | P | PART |
Dave Hannah
|
|
|
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith went over items on c/n
|
BLD-Final | 5/4/2007 | 5/4/2007 | 5/4/2007 | A | PART |
Dave Hannah
|
|
|
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Final | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PART |
Dave Hannah
|
|
|
daryl; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ
|
FIRE-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | FAIL |
Forrest France
|
|
|
Still missing approved door hardware at the main entry/exit first floor, building address numbers are installed too low, the project related fire alarm permit is not ready for final, plastic covers are still in place at the unit single station SD's on all floors.
|
FIRE-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | | PART |
|
|
|
Approved for TOC.
|
Temporary occupancy | | | 5/1/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5577 issued 5-1-07 to the Cityside Lofts.
|
BLD-Final | 4/27/2007 | 4/30/2007 | 4/30/2007 | A | FAIL |
Dave Hannah
|
|
|
Darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trades signed off
|
FIRE-Final Inspection | 4/27/2007 | 4/30/2007 | 4/30/2007 | A | FAIL |
Forrest France
|
|
|
Noted several issues including door hardware, signage, addressing, exit signs, some fire alarm and sprinkler issues as noted on a 12 item correction notice left on site and discussed with the general and sub contractors.
|
BLD-Framing/Rough-in | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | PART |
Dave Hannah
|
|
|
darrell ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith first floor corrador ok to cover
|
BLD-Energy code compliance | 12/29/2006 | 12/29/2006 | 1/2/2007 | P | PASS |
Dave Hannah
|
|
|
Daryl; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett first and second floor
|
BLD-Energy code compliance | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | PART |
Dave Hannah
|
|
|
Daryl; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok to cover second floor appartments
|
BLD-Framing/Rough-in | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | PART |
Dave Hannah
|
|
|
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to insulate 1st and 2nd floors
|
BLD-Framing/Rough-in | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PART |
Dave Hannah
|
|
|
darrell ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover third flr room walls only
|
BLD-Energy code compliance | 11/22/2006 | 11/24/2006 | 11/24/2006 | A | PART |
Dave Hannah
|
|
|
DARRELL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover third floor room walls
|
BLD-Framing/Rough-in | 11/17/2006 | 11/20/2006 | 11/20/2006 | A | PART |
Dave Hannah
|
|
|
Darrel; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to insulate the third floor
|
BLD-Other | 11/14/2006 | 11/15/2006 | 11/15/2006 | A | PART |
Dave Hannah
|
|
|
darrell Note: drywall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles first layer of sheetrock 4th and 5th floor
|
BLD-Energy code compliance | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PART |
Dave Hannah
|
|
|
daryl ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover 4th floor wall rooms only
|
BLD-Framing/Rough-in | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Dave Hannah
|
|
|
Daryl; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop ok to insulate the 4th and 5th floor units
|
BLD-Conference | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | DONE |
Dave Hannah
|
|
|
request per Dixie for her and Troy to do a conference
|
BLD-Conference | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PART |
Lee Rice
|
|
|
request per Dixie for her and Troy to do a conference..two inspectors short...had to bypass meeting.
|
Plan resubmittals received | | | 6/7/2006 | | DONE |
|
|
|
Received 1transmittal,1 project letter, & 1 copy of sheet A10.0 taken to Mike P.
|
Issue PAID IN FULL permit | | | 3/23/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 3/21/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/20/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/16/2006 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/16/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/16/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 8/16/2005 | | 3/16/2006 | | PASS |
|
|
|
3/16/2006 15:59:58 M_P - activity updated through activity BLDA022 from case BLD05-02204.
|
Routing - PLAN CHECK | 3/7/2006 | | 3/16/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/8/2006 | | |
|
|
|
Received 1 copy of Plan review response letter, 1 copy of revised Supplemental Structure calcs for metal decks, 3 copies of the following- A1.1, A8.0, A9.0, A10.0, A10.2, M1.0, M1.1, M1.2, M1.3, E1.0, E2.0, E3.0, E4.0, E5.0, E6.0, E7.0, E8.0 and taken to Mike P.
|
Routing - PLAN CHECK | 2/10/2006 | | 3/7/2006 | | FAIL |
|
|
|
Second review failed, talked to architect and requested additional plans to be submitted to clarify items discussed in our meeting. Further review required prior to issuing permit.
|
Routing - PLUMBING | 3/7/2006 | | 3/7/2006 | | PASS |
|
|
|
no changes
|
Routing Off Site - STRUCTURAL | 2/21/2006 | | 3/3/2006 | | PASS |
|
|
|
No further reveiw requried by outside engineering firm.
Called Action Couriers for pick up
|
Routing - PLANNING | 2/7/2006 | | 2/9/2006 | | PASS |
|
|
|
Approved.
|
Routing - PLAN CHECK | 11/4/2005 | | 2/7/2006 | | |
|
|
|
Routing to Planning.
|
Plan resubmittals received | | | 2/2/2006 | | |
|
|
|
Received 3 copies of each A2.5, A2.7, A10.0, M1.0, M1.1,M1.2,M1.3 and 1 copy of a cover comment letter. Taken to Mike Phillips
|
Plan resubmittals received | | | 1/30/2006 | | |
|
|
|
Received 8 page response letter to review comments, project start up for special inspections package, 2 revised cert of values, response to Architecture review from Treasure valley Engineers letter and 5 pages of calcs, ans 3 pages of each A0.3,A1.0,A1.1,A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A3.0, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A3.7, A3.8, A3.9, A3.10, A3.11, A3.12, A3.13, A3.14, A3.15, A3.16, A3.17, A3.18, A3.19, A3.20, A3.21, A6.1, A6.2, A6.3, A6.4, A6.5, A8.0, A8.1, A9.0, A10.0, A10.1, A10.2, A10.3, M1.0, M1.1, E1.0, E2.0, E3.0, E4.0, E5.0, E6.0, E7.0, E8.0; Taken to Mike Phillips
|
Plan resubmittals received | | | 1/12/2006 | | DONE |
|
|
|
Received 1 transmittal ,& 1 copy of sheets S1.0,S2.1,S2.2,S2.3,S2.4,S2.5,S2.6,S3.0,S4.0,S4.1,S4.2,S5.0 taken to Mike P.
|
Plan resubmittals received | | | 1/10/2006 | | DONE |
|
|
|
Received transmittal, 1 review comments,1 response, & 2 copys of sheets S1.0,S2.1,S2.2,S2.3,S2.4,S2.5,S2.6,S3.0,S4.0,S4.1,S4.2,S5.0 taken to Mike P.
|
Plan resubmittals received | | | 12/16/2005 | | DONE |
|
|
|
Received 1 response , & 3 copys of sheets A2.6,A10.0,M1.0,M1.1,M1.2,M1.3 taken to Mike P.
|
Routing Off Site - STRUCTURAL | 11/23/2005 | | 12/14/2005 | | FAIL |
|
|
|
Second review failed e-mailed comments to architect.
Structural Calculations
|
Plan resubmittals received | | | 11/17/2005 | | DONE |
|
|
|
Received Transmittal ,1 response,& 3 copys of sheets S1.0,S2.1,S2.2,S2.3,S2.4,S2.5,S2.6,S3.0,S1.0,S4.1,S4.2,S2.0 Taken to Mike P
|
1st review completed | | | 11/4/2005 | | FAIL |
|
|
|
FAILED BY PLANNING, PLAN CHECK, STRUCTURAL AND MECHANICAL.
|
Routing - FIRE | 10/20/2005 | | 11/2/2005 | | PASS |
|
|
|
10/28/05 - Plans routed to FV.
|
Routing - PLAN CHECK | 9/2/2005 | | 10/20/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - MECHANICAL | 10/6/2005 | | 10/20/2005 | | FAIL |
|
|
|
ROUTED OFF SITE to ICC Plan Review Services for mechanical plan review. (msouthard)
10/20/05 - Received plan review from ICC and sent copy to John Price.
|
Plan resubmittals received | | | 9/28/2005 | | |
|
|
|
Received (3) copies of sheet M1.0E, M2.0E and M3.0E. Routed to Mike P.
|
Plan Reviewer's activity | | | 9/7/2005 | | |
|
|
|
Plans being modified to reflect energy code requirements for electric resistant heaters or will be redesigned to reflect heat pumps or geo-thermo or other form of heating.
|
Routing - PLANNING | 8/29/2005 | | 9/2/2005 | | FAIL |
|
|
|
Phasing application has not been submitted/approved. Original planning applications included office portion of development. Left phone message with John Price, architect, informing him of this action.
|
Routing Off Site - STRUCTURAL | 8/16/2005 | | 9/2/2005 | | FAIL |
|
|
|
E-mailed a copy of the structural report from outside engineering firm to architect.
|
Routing - PLUMBING | 8/19/2005 | | 8/29/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 8/17/2005 | | 8/19/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/19/2005 | | 8/19/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions--Under ESC05-00569.
|
Routing - PLANNING Land Div | 8/16/2005 | | 8/17/2005 | | PASS |
|
|
|
approved as tract a on ros 5113.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2005 | | PEND |
|
|
|
Internal routing begun. Outsource review for mechanical cannot be sent out until additional information is received from John Price. If questions contact Mike Phillips or Marlene.
|
Plan routing begun/NEW & ADDTN | | | 8/16/2005 | | |
|
|
|
|
Override - Parcel Holds | | | 8/15/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/15/2005 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/15/2005 | | |
|
|
|
|
Application received | | | 8/10/2005 | | |
|
|
|
|
Fee Review-notes | 8/15/2005 | 8/15/2005 | | | |
|
|
|
|
Routing - MECHANICAL | 1/5/2006 | | | | |
|
|
|
ROUTED OFF SITE to ICC Plan Review Services to review resubmittals of the mechanical plans. (msouthard)
|