Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02227
StatusFinaled
Name PEPPERWOOD DEVELOPMENT CORP
Site Address 2562 S GATEWOOD LN
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a three bedroom, two and half bathroom 1737 sq. ft. two story town home on a zero lot line (1062 sq. ft. first floor/675 sq. ft. second floor) with a attached 483 sq. ft. two car garage. Per approved plans, engineering and requirement list. PDR6-79 per Carl Miller with Planning and Zoning. (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/10/2009 DONE
Case Summary (BLD)  9/3/2009 DONE
DetailsTisha Gallop
BLD-Final7/21/20087/21/20087/21/2008PPASS
DetailsMike Jordan
Stan Phone #: ###-####
DOC - Permit Finaled7/21/20087/21/20087/21/2008PPASS
DetailsMike Jordan
Handrail height repaired. Cert of occ. issued.
BLD-Final7/18/20087/18/20087/18/2008PFAIL
DetailsMike Jordan
stan Phone #: ###-####. Handrail mounted to low. c/n posted.
Reopen Permit (ISS)  4/30/2008 DONE
reopen permit per Mike Jordan
DOC - Permit Expired1/17/20081/17/20081/17/2008PPASS
DetailsMike Jordan
DO NOT REOPEN. CONFERANCE WITH MIKE JORDAN IS REQUIRED.
BLD-Aging Inspection1/17/20081/17/20081/17/2008PCANC
DetailsMike Jordan
(F) Reprint permit  10/5/2006  
Code Occupancy Approval  9/7/2006 PASS
OK
BLD-Framing/Rough-in6/29/20066/29/20066/29/2006PPASS
DetailsMike Jordan
Scott 608.0925; Phone #: ###-#### Internet Inspection Request from: Scott Simpson
BLD-Energy code compliance6/29/20066/29/20066/29/2006PPASS
DetailsMike Jordan
Scott 608.0925; Phone #: ###-#### Internet Inspection Request from: Scott Simpson
BLD-Framing/Rough-in6/22/20066/22/20066/22/2006PFAIL
DetailsMike Jordan
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Provide fix for double ML that has been cut. Sheet inteerior side of gable. ok to insul.
BLD-Framing/Rough-in6/19/20066/19/20066/19/2006PNR
DetailsMike Jordan
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Wall cover2/16/20062/17/20062/17/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/16/2006 at 3:39:08 PM. Contact: ###-####. Nailing not per assembly on seperation wall.
BLD-Foundation12/7/200512/7/200512/7/2005PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/7/2005 at 7:20:25 AM. Contact: ###-####.
BLD-Footing12/2/200512/5/200512/5/2005APART
DetailsDave Hannah
ryan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  11/1/2005 DONE
Plan assigned to (SAM)8/12/200510/13/200510/28/2005 PASS
10/28/2005 08:38:09 SAM - activity updated through activity BLDA022 from case BLD05-02227.
PLANS/APPL TAKEN TO FRONT DESK  10/28/2005  
Inspection Record Card- Bld  10/28/2005 DONE
Permit Ready to Issue  10/28/2005  
Telephone call  10/28/2005 DONE
left mess that permit is ready
Routing - PLANNING10/27/2005 10/27/2005 PASS
Routed to Carl Miller
Case Summary (BLD)  10/26/2005  
Routing - PLAN CHECK8/18/2005 10/26/2005 PASS
Routing - PUBLIC WORKS8/16/2005 8/18/2005 PASS
Routing - PLANNING8/12/2005 8/16/2005 FAIL
routed to CM per CU. Eaves can not encroach common property line.Per Dave Abo no permits to be issued. Subdivision needs to be replatted
Application received  8/12/2005