Permit Information
Permit NumberBLD05-02270
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 1601
Project NameUS BANK-16TH FLR
Customer Number 
ePlanReviewNo
Description
(WESTERN PACIFIC TIMBER - STE 1601 - RESTROOM UPGRADE - LOBBY REMODEL - US BANK BLDG) This building is fire sprinklered because it is a high-rise. To create a 2,624 square foot office tenant space on the 16th story of a high rise building (19 total stories). To upgrade the 16th story core restrooms to be accessible to the disabled. To remodel the 16th story elevator lobby. The floor area of the entire 16th story is about 14,600 square feet. The "core" has a floor area of about 2,670 square feet. Work is to include interior nonbearing walls, suspended ceilings, interior doors, interior windows, and finishes. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 16th story are regulated under the provisions of the 2000 IBC. If not already existing, fire-safing shall be installed at the perimeter of the 16th story between the floor and the spandrel glass. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**///Final cert of value $288,000 per unico 2/15/2007 cmc
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Third Notice BLD6/14/20066/14/20063/13/2007 DONE
Second Notice has not been responded to.
Fee Review-notes8/16/20058/16/20053/13/2007 DONE
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/25/20065/25/2006 DONE
Permanent occupancy  4/25/2006 DONE
Perm. Occ. Cert. # 10996 issued 4-25-06 to Western Pacific Timber.
BLD-Final4/17/20064/17/20064/17/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/17/2006 at 9:44:04 AM. Contact: ###-####. ok for perm occ
Permanent Occupancy 4/17/20064/17/2006 DONE
Details
BLD-Final12/30/200512/30/200512/30/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/30/2005 at 8:17:38 AM. Contact: ###-####.ok for temp occ will need to recheck befor final
FIRE-Final Inspection12/29/200512/30/200512/30/2005APASS
DetailsForrest France
Fire life safety passed inspection, the provided fire extinguisher was installed while on site as discussed.
BLD-Framing/Rough-in12/7/200512/8/200512/8/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/7/2005 at 1:07:51 PM. Contact: ###-####.ceiling grid ok to cover
BLD-Framing/Rough-in11/14/200511/15/200511/16/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2005 at 3:23:35 PM. Contact: ###-####. ok to cover elev lobby and hard lids in office area
BLD-Framing/Rough-in11/2/200511/3/200511/4/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/2/2005 at 2:34:16 PM. Contact: ###-####. restrooms ok to cover
BLD-Framing/Rough-in10/24/200510/24/200510/24/2005PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/24/2005 at 9:23:15 AM. Contact: ###-####. int walls ok
Issue PAID IN FULL permit  9/27/2005  
Permit Ready to Issue  9/23/2005 DONE
Inspection Record Card- Bld  9/23/2005 DONE
Print Occupancy Form  9/23/2005 DONE
Telephone call  9/23/2005 DONE
Left voice message for Cory Nelson that permit is ready & fees///9/23/05 9:05am BAS
Routing - PLAN CHECK9/20/2005 9/22/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  9/22/2005 DONE
Plan assigned to (CJW)8/19/2005 9/22/2005 PASS
9/22/2005 11:26:36 CJW - activity updated through activity BLDA022 from case BLD05-02270.
Routing - FIRE9/2/2005 9/20/2005 PASS
Faxed comments to the architect.
1st review completed  9/20/2005 FAIL
Failed plan check
Plan resubmittals received  9/14/2005  
Received (2) copies of sheet A0.0, A2.0, A3.0, A5.0, A6.0, A7.0 and A7.1. Routed to Carl W.
Routing - PLAN CHECK8/19/2005 9/2/2005 FAIL
The IBC plan review was started on September 1, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
Pending Assignment by MYS8/16/2005 8/19/2005 DONE
8/19/2005 12:39:09 MYS - activity updated through activity BLDA172 from case BLD05-02270.
Routing - PUBLIC WORKS8/19/2005 8/19/2005 PASS
Plans ACCEPTED BY PLAN TECH  8/17/2005  
Application received  8/16/2005  
Recd Pcfee & Taken To Pln CK  8/16/2005 DONE