Permit Information
Permit NumberBLD05-02293
StatusExpired
Name CAMCO CONSTRUCTION INC
Site Address 350 N MILWAUKEE ST
Project NameBTS - UTILITY RELOCATION
Customer Number 
ePlanReviewNo
Description
(BOISE TOWNE SQUARE)(UTILITY LINE RELOCATION/PARKING MODIFICATION) To reroute the site utility lines (including water, storm drain, sewer), relocate 2 fire hydrants, sidewalks, landscape curbing and miscellaneous site elements at the main entry to the mall per approved plans and DRH04-00219. This work is being done to prepare the site for a future building expansion (BLD06-00007). Note: All protected access and entry for pedestrian and emergency responders to be maintained at all times per approved plans (refer plan sheet C500). Contractors staging area and accessways to be surrounded by fencing. (msouthard)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/6/20082/6/20082/6/2008PCANC
DetailsMike Jordan
DOC - Permit Expired2/6/20082/6/20082/6/2008PPASS
DetailsMike Jordan
BLD-Aging Inspection10/25/200610/25/200610/30/2006 NR
DetailsMike Jordan
BLD-Aging Inspection8/10/20068/10/20068/10/2006 PASS
DetailsMike Jordan
wip
BLD-Other4/19/20064/19/20064/19/2006PDEFR
DetailsMike Jordan
brian Note: roof drain; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Permit Ready to Issue  1/30/2006 DONE
Issue & PRINT to be Invoiced  1/30/2006 DONE
Routing - FIRE1/27/2006 1/27/2006 PASS
Routing - PLAN CHECK1/27/2006 1/27/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/27/2006 DONE
Telephone call  1/27/2006 DONE
PLEASE CALL DUNCAN KING WHEN READY ###-####
Plan assigned to (MYS)8/19/2005 1/27/2006 PASS
1/27/2006 16:13:57 MYS - activity updated through activity BLDA022 from case BLD05-02293.
Plan resubmittals received  1/26/2006 DONE
Received 1 letter of transmittal ,& 2 copys of sheets C500,C501 taken to Marlene S.
Meeting  1/24/2006 DONE
Meeting held with contractor, Steve Yearsley (civil engr), Dave Hanneman and Sam Rogers (fire), John Menard and Marlene Southard to discuss options. As a result of this meeting revised plans will be submitted.
Routing - PLUMBING1/9/2006 1/19/2006 PASS
Plumbing passed...see BLD06-00007.
Plan resubmittals received  1/18/2006 DONE
Received 1 letter of transmittal, 2 sets of pictures, & 5 copys of sheets C500,C501 taken to Marlene S.
Meeting  9/15/2005  
I met with Fire Marshal Hanneman and he wants a meeting to develop a more specific site access plan including roadway demolition and reconstruction time line to minimize impairment periods. I scheduled a meeting for 9/23 with Steve Yearsly and the Fire Marshal to discuss the interim FD access plan. Steve will bring revised plans per our discussion.
Routing - FIRE8/30/2005 9/12/2005 FAIL
Holding plans at my desk for meeting with FD. Need Fire Marshal approval of interim FD access routes and plan revisions for specific hydrant locations. I called fire marshal and Steve Yearsley, project contact, to initiate scheduling of a joint meeting to discuss acceptable FD access during the interim period which will extend over fall and winter.
Routing - PLAN CHECK9/12/2005 9/12/2005 HOLD
Marlene. Waiting for additional information to be presented.
1st review completed  9/12/2005 FAIL
failed plumbing and fire.
Routing - PLUMBING8/30/2005 8/30/2005 FAIL
need plumbing plan and details for interceptor per note on C200
Routing - PLANNING8/19/2005 8/30/2005 PASS
Approved per DRH04-00219.
Routing - Erosion and Sediment8/19/2005 8/19/2005 PASS
ESC plan approved with attached conditions.
Application received  8/19/2005