Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02311
StatusFinaled
Name HOUSING URBAN DEVELOPMENT
Site Address 800 E PARK BLVD
Project NameMK PLAZA IV-2ND FLR
Customer Number 
ePlanReviewNo
Description
(HOUSING URBAN DEVELOPMENT)(MK PLAZA IV-STE 220) To remodel an existing 4665 sq ft office tenant located on the second floor for a new tenant. Work to include, construction of interior partitions to create small conference rooms, office areas and storage closet, modifiation to the corridor wall and installation of new rated door assembly, relocation of lighting, new dual level switching requirements in new office areas and conference rooms, relocation of Hvac Diffusers, this building is fully fire sprinklered all alterations to the sprinkler system WILL require a separate permit and shall be installed per NFPA #13 as regulated by the fire department. (rmh)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/20/20061/20/20064/6/2006 DONE
Second Notice has not been responded to.
Second Notice BLD12/22/200512/22/20051/20/2006 DONE
First Notice has not been responded to.
First Notice 12/9/200512/22/2005 DONE
Permanent occupancy UNPAID FEE  12/9/2005 DONE
Perm. Occ. Cert. # 10835 issued 12-9-05 to Housing & Urban Development.
BLD-Final12/5/200512/5/200512/5/2005PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/5/2005 at 8:24:40 AM. Contact: ###-####. ok for perm occ
Permanent Occupancy 12/5/200512/5/2005 DONE
Details
FIRE-Final Inspection11/30/200511/30/200511/30/2005PPASS
DetailsForrest France
Fire life safety passed inspection.
FIRE-Final Inspection11/28/200511/29/200511/29/2005AFAIL
DetailsForrest France
The related fire alarm must be accepted prior to final for life safety.
BLD-Framing/Rough-in10/11/200510/11/200510/11/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/11/2005 at 7:46:14 AM. Contact: ###-####.
Inspection Record Card- Bld  9/22/2005 DONE
Print Occupancy Form  9/22/2005 DONE
Permit Ready to Issue  9/22/2005 DONE
Telephone call  9/22/2005  
called Kirk Morris ###-#### and left voicemessage that permit is ready and fees
Issue & PRINT permit  9/22/2005 DONE
Routing - PLAN CHECK9/20/2005 9/21/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/21/2005 DONE
Plan assigned to (R_H)8/23/2005 9/21/2005 PASS
9/21/2005 08:24:29 RMH - activity updated through activity BLDA022 from case BLD05-02311.
Routing - FIRE9/2/2005 9/20/2005 PASS
Comments faxed to the architect.
1st review completed  9/20/2005 PASS
Case Summary (BLD)  9/2/2005 DONE
Routing - PLAN CHECK8/24/2005 9/2/2005 PASS
Routing - PUBLIC WORKS8/23/2005 8/24/2005 PASS
Plans ACCEPTED BY PLAN TECH  8/22/2005  
Application received  8/19/2005  
Recd Pcfee & Taken To Pln CK  8/19/2005  
Fee Review-notes8/19/20058/19/2005