Third Notice BLD | 3/5/2008 | 3/5/2008 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/17/2008 | 2/6/2008 | | DONE |
|
|
|
|
First Notice | | 1/17/2008 | 2/6/2008 | | DONE |
|
|
|
|
First Notice | | 1/9/2008 | 2/6/2008 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 2/6/2008 | 2/6/2008 | 1/31/2008 | | DONE |
|
|
|
Project completed and occupied, no occupancy card signed off by PW inspector R. Rokovitz.
|
Permanent Occupancy | | | 1/17/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/17/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/9/2008 | | DONE |
|
|
|
|
BLD-Aging Inspection | 9/4/2006 | 9/4/2006 | 9/5/2006 | | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 6/30/2006 | 7/3/2006 | 7/3/2006 | P | CANC |
Mike Jordan
|
|
|
Building final. Call and I'll meet you there.; Phone #: ###-#### Internet Inspection Request from: Danielle Groat
|
Code Occupancy Approval | 7/3/2006 | 7/3/2006 | 7/3/2006 | P | PASS |
Scott M.Brown
|
|
|
LANDSCAPE IN, OK TO RELEASE BOND AND SIGN FINAL
|
BLD-Final | 6/30/2006 | 6/30/2006 | 6/30/2006 | P | PASS |
Mike Jordan
|
|
|
Drawings & sign off card will be on desk by popcorn machine///dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chile. ok for perm occ. can not verify code enforcement or public works finals.
|
BLD-Aging Inspection | 5/22/2006 | 5/22/2006 | 5/22/2006 | | PASS |
Mike Jordan
|
|
|
Callled Big D builders, Additional entrance/exit has been constructed. Landscapping should be completed by tomorrow. Contractor to get finaled off by the end of the week.
|
FIRE-Final Inspection | 3/20/2006 | 3/20/2006 | 3/21/2006 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled. Resubmitted plans shows single street acces for fire dept.
|
BLD-Final | 3/16/2006 | 3/17/2006 | 3/17/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/16/2006 at 2:30:19 PM. Contact: ###-####. Ok for temp. occ. Needs to reinstall restroom grab bars to the right dimensions off the wall. Install insulation to bottom of floor decking at interior demizing walls.
|
FIRE-Final Inspection | 3/16/2006 | 3/17/2006 | 3/17/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the fire alarm permit is finaled. Elevator is not to be used. All other life safety items are ok.
|
FIRE-Final Inspection | 3/15/2006 | 3/16/2006 | 3/16/2006 | P | CANC |
Troy Cobbley
|
|
|
no time for inspection
|
Plan Modification Accepted | | | 3/15/2006 | | DONE |
|
|
|
Recieved 2nd copy of sheet A1.0 plan mod. Called architect, John Price, for pick up.
|
Code Occupancy Approval Temp | 3/14/2006 | 3/14/2006 | 3/14/2006 | P | FAIL |
Scott M.Brown
|
|
|
No landscape yet. Needs to bond for a total of $12,775 required under DRH05-00193.
|
Plan resubmittals received | | | 3/14/2006 | | DONE |
|
|
|
Received 1 transmittal & 1 copysof sheet A1.0 ( plan issued 10-21-05 ) taken to Sam R.
|
Meeting | | | 3/13/2006 | | DONE |
|
|
|
Walk-in meting with D. Durrant, GC, regarding approval of a proposed modification to FD roadways. He's unsure of what was approved. Need issued plan showing approved route and proposed modification. He will bring in tomorrow for re-evaluation by Fire.
|
Plan resubmittals received | | | 3/13/2006 | | DONE |
|
|
|
Received 1 transmittal, & 1 copy of sheet A1.0 taken to Sam R.
( plans issued 10-21-05 )
|
BLD-Other | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/2/2006 at 3:30:38 PM. Contact: ###-####. Insprcted ceiling grid upstairs. Floating system installed. Needs to submit a ceiling plan. Also inspected anchoring of racking in warehouse. Appears to be installed as per plan.
|
BLD-Energy code compliance | 1/30/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/30/2006 at 1:05:40 PM.
|
BLD-Framing/Rough-in | 1/23/2006 | 1/24/2006 | 1/24/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/23/2006 at 11:59:53 AM. Contact: ###-####. Noted to contractor to check on rated constructio for riser room.
|
BLD-Foundation | 11/9/2005 | 11/10/2005 | 11/10/2005 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/9/2005 at 2:33:01 PM. Contact: ###-####.
|
BLD-Footing | 11/7/2005 | 11/8/2005 | 11/8/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/7/2005 at 3:43:58 PM. Contact: ###-####. Step footing at loading dock is not continous and not per detail. Special inspector to verify repair.
|
BLD-Foundation | 11/1/2005 | 11/2/2005 | 11/2/2005 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/1/2005 at 9:55:28 AM. Contact: ###-####. perimeter stemwalls, interior column pad footings.
|
BLD-Foundation | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Jim Sly
|
|
|
rick slama; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Footing and pads for main portion of bldg OK... No special insp req. 2500
|
(F) Reprint permit | | | 10/24/2005 | | |
|
|
|
|
Routing - FIRE | 10/7/2005 | | 10/21/2005 | | PASS |
|
|
|
resubmittal accceptable based on conditions outlined in review comments - review faxed to architect.
|
Routing - PLAN CHECK | 10/21/2005 | | 10/21/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/21/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2005 | | DONE |
|
|
|
called ###-#### and told Danielle w/Big D Builders that permit is ready, fees, and need ACHD
|
Issue PAID IN FULL permit | | | 10/21/2005 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/25/2005 | | 10/21/2005 | | PASS |
|
|
|
10/21/2005 14:20:04 JCM - activity updated through activity BLDA022 from case BLD05-02319.
|
Plan Reviewer's activity | | | 10/7/2005 | | DONE |
|
|
|
Inserted resubmitted plan sheets for fire and routed to Sam. JCM
|
Routing - PLAN CHECK | 9/29/2005 | | 10/7/2005 | | |
|
|
|
|
Plan resubmittals received | | | 10/7/2005 | | |
|
|
|
Received (3) copies of sheet C1.0, A1.0 and A2.0. Routed to John M.
|
Routing Off Site - STRUCTURAL | 9/28/2005 | | 10/5/2005 | | PASS |
|
|
|
Routed resubmittals to AHJ - Received a faxed letter from the consulting structural engineer approving the resubmittals. JCM
|
Plan Reviewer's activity | | | 9/30/2005 | | PASS |
|
|
|
Reviewed and approved resubmitted plan sheets. JCM
|
1st review completed | | | 9/29/2005 | | FAIL |
|
|
|
Failed Structural, Plan Check and Fire Plan Check.
|
Routing - FIRE | 9/12/2005 | | 9/29/2005 | | FAIL |
|
|
|
Faxed comments to architect.
|
Plan resubmittals received | | | 9/28/2005 | | DONE |
|
|
|
Received Transmittal & 1 Copys of sheet S2.0 Taken to John M.
|
Plan resubmittals received | | | 9/28/2005 | | |
|
|
|
Received (2) sets of structural calcs and (2) sets of supporting structural calcs. Also received (2) copies of sheet A4.0, A6.0 and S2.0. Routed to John M.
|
Plan resubmittals received | | | 9/28/2005 | | |
|
|
|
Received (2) copies of sheet A0.2, A4.0, A6.0, A9.0 and E2L. Routed to John M.
|
Routing - PLAN CHECK | 9/9/2005 | | 9/12/2005 | | FAIL |
|
|
|
|
Routing - Erosion and Sediment | 9/12/2005 | | 9/12/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals requested | | | 9/9/2005 | | DONE |
|
|
|
Faxed the architect a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 9/9/2005 | | DONE |
|
|
|
Mailed the architect a copy of the comment list list requesting revisions. JCM
|
Plan resubmittals received | | | 9/9/2005 | | |
|
|
|
Received (2) copies of the ESC Plan and Narrative. Routed to John M.
|
Routing - PLANNING | 9/6/2005 | | 9/9/2005 | | PASS |
|
|
|
Approved per DRH05-00193.
|
Routing Off Site - STRUCTURAL | 8/25/2005 | | 9/8/2005 | | FAIL |
|
|
|
Routed to AHJ Engineering - Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 8/31/2005 | | 9/6/2005 | | PASS |
|
|
|
approved per plan and 2003 upc
|
Routing - PUBLIC WORKS | 8/25/2005 | | 8/31/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/31/2005 | | 8/31/2005 | | FAIL |
|
|
|
ESC does not meet requirments according to BMC 8-17; checklist completed and faxed to J. Price (PD). Re-submittal required.
|
Plan resubmittals received | | | 8/29/2005 | | DONE |
|
|
|
Received 1 Transmittal Letter & 4 Copys of sheets E1,E3 Taken to John M.
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/25/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 8/25/2005 | | 8/25/2005 | | PASS |
|
|
|
Lot 14, Block 3, West Boise Industrial Park No. 5
|
Application received | | | 8/22/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/22/2005 | | |
|
|
|
|
Fee Review-notes | 8/22/2005 | 8/22/2005 | | | |
|
|
|
|