BLD-Final | 6/13/2006 | 6/14/2006 | 6/14/2006 | A | PASS |
Tony Young
|
|
|
steve, verify ladder in window well; Phone #: ###-####
|
DOC - Permit Finaled | 6/14/2006 | 6/14/2006 | 6/14/2006 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 6/12/2006 | 6/13/2006 | 6/14/2006 | A | NR |
Tony Young
|
|
|
steve
|
BLD-Final | 6/9/2006 | 6/12/2006 | 6/13/2006 | A | DEFR |
Dave Hannah
|
|
|
STEVE; Phone #: ###-####
|
BLD-Grading Inspection | 6/13/2006 | 6/13/2006 | 6/13/2006 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 6/9/2006 | 6/9/2006 | 6/9/2006 | P | NR |
Tony Young
|
|
|
steve,, verify handrails on exterior,, also window well ladder
|
BLD-Final | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PART |
Tony Young
|
|
|
Raulph ###-#### gave paperwork,, handrails are w i p
|
PubWorks Subgrade Approval | 6/9/2006 | 6/9/2006 | 6/9/2006 | | DONE |
|
|
|
Final grading and driange approved
|
BLD-Final | 6/8/2006 | 6/8/2006 | 6/8/2006 | P | NR |
Tony Young
|
|
|
Steve,, verify mech and hillside
|
BLD-Final | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | NR |
Tony Young
|
|
|
steve - call for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Foundation | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/20/2006 at 4:35:48 PM. Contact: ###-####.
|
BLD-Footing | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/18/2006 at 5:19:40 PM. Contact: ###-####. flower bed ftgs,, side retaining wall ftgs
|
BLD-Energy code compliance | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PASS |
Tony Young
|
|
|
Ralph; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PART |
Tony Young
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong retaining wall
|
BLD-Framing/Rough-in | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PASS |
Tony Young
|
|
|
chuck; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PART |
Tony Young
|
|
|
Randy -- framing reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong conf w/ Ryan the framer
|
BLD-Framing/Rough-in | 2/22/2006 | 2/23/2006 | 2/23/2006 | P | NR |
Tony Young
|
|
|
Troy; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong need trades,,, also need to meet framer on site
|
BLD-Footing | 2/20/2006 | 2/21/2006 | 2/21/2006 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/20/2006 at 5:17:23 PM. Contact: ###-####. rear ftg,,same as before
|
BLD-Footing | 2/2/2006 | 2/3/2006 | 2/3/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/2/2006 at 12:26:10 PM. Contact: ###-####.
|
PubWorks Subgrade Approval | 2/3/2006 | 2/3/2006 | 2/3/2006 | | DONE |
|
|
|
Footing subgrade approved
|
BLD-Foundation | 1/11/2006 | 1/12/2006 | 1/11/2006 | A | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 1/11/2006 at 2:34:56 PM. Contact: ###-####.
|
BLD-Foundation | 11/10/2005 | 11/10/2005 | 11/10/2005 | P | PART |
Tony Young
|
|
|
ryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip
|
BLD-Footing | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Tony Young
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip
|
PubWorks Subgrade Approval | 10/21/2005 | 10/21/2005 | 10/21/2005 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 10/12/2005 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/20/2005 | 9/20/2005 | 9/23/2005 | | PASS |
|
|
|
9/23/2005 11:19:35 SRZ - activity updated through activity BLDA022 from case BLD05-02343.
|
Routing - PLAN CHECK | 8/24/2005 | | 9/23/2005 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2005 | | DONE |
|
|
|
ONE SET RED-LINED.
|
Inspection Record Card- Bld | | | 9/23/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/23/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 9/21/2005 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/21/2005 | | PASS |
|
|
|
Pending call back from Engineer. Need Engineering for Crawl space Mechanical Ventilation Alternate Design. (SRZ)
|
Plan assigned to (SAM) | 8/24/2005 | 8/24/2005 | 9/20/2005 | | DONE |
|
|
|
|
Routing - FIRE | 8/31/2005 | | 9/1/2005 | | PASS |
|
|
|
No fire sprinklers required.(Afton Sub, Villa Norte St.)
|
Routing - Erosion and Sediment | 8/30/2005 | | 8/31/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 8/25/2005 | | 8/30/2005 | | PASS |
|
|
|
Per CFH05-36 and CUP
|
Routing - PUBLIC WORKS GRADING | 8/24/2005 | | 8/25/2005 | | PASS |
|
|
|
Approved as Category 1 by CFH05-00036
|
Routing - PUBLIC WORKS | 8/25/2005 | | 8/25/2005 | | PASS |
|
|
|
|
Application received | | | 8/24/2005 | | |
|
|
|
|