Case Summary (BLD) | | | 11/16/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/28/2011 | | DONE |
|
|
|
|
Third Notice BLD | 12/11/2007 | 12/11/2007 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Third Notice BLD | 12/11/2007 | 12/11/2007 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/30/2007 | 11/13/2007 | | DONE |
|
|
|
|
First Notice | | 10/30/2007 | 11/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/30/2007 | | DONE |
|
|
|
|
BLD-Final | 10/25/2007 | 10/25/2007 | 10/25/2007 | P | PASS |
Tom Arcoraci
|
|
|
Alex; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Code Occupancy Approval | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PASS |
Dena Gambrel
|
|
|
|
BLD-Final | 10/5/2007 | 10/8/2007 | 10/9/2007 | A | FAIL |
Jim Storey
|
|
|
mark Phone #: ###-#### need cod c/n remove door stops laundry rm.
|
Code Occupancy Approval | 10/5/2007 | 10/5/2007 | 10/5/2007 | P | FAIL |
Dena Gambrel
|
|
|
10-5-07 Failed. Correction notice issued.
|
Temporary occupancy | | | 6/21/2007 | | |
|
|
|
per Jenifer Gilliland customer has a 90 day extension-see scanned document
|
BLD-Final | 4/4/2007 | 4/5/2007 | 4/5/2007 | P | PART |
Jim Storey
|
|
|
alex; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok for temp.
|
FIRE-Final Inspection | 4/4/2007 | 4/5/2007 | 4/5/2007 | A | PASS |
Forrest France
|
|
|
Items in need of correction have been completed, final fire life safety inspection passed.
|
Temporary occupancy | | | 4/5/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5565 issued 4-5-07 to the Cabria Suites.
|
BLD-Other | 4/3/2007 | 4/4/2007 | 4/4/2007 | P | FAIL |
Jim Storey
|
|
|
Alex - this inspection is for temp occ only ; Phone #: ###-#### Internet Inspection Request from: Darla Downs maintane floor ceilling assemblies/ fix smoke seal
|
FIRE-Final Inspection | 4/3/2007 | 4/4/2007 | 4/4/2007 | A | FAIL |
Forrest France
|
|
|
Exit discharge lights do not function on alternate power supply, missing exit signs at outside enclosures as indicated on plans, door hardware at one location on the 1st floor is incorrect, need to add exit signs at some locations on the 1st floor as discussed, provide signage at the FACP and fire riser room doors, missing ceiling tile in the storage rooms for proper operation of the fire sprinklers, provide cover and key for knox box.
|
PubWorks Occupancy Approval | 4/4/2007 | 4/4/2007 | 4/4/2007 | | DONE |
|
|
|
signed off 03/30/07 G. Fitts.
|
Code Occupancy Approval Temp | 4/3/2007 | 4/3/2007 | 4/3/2007 | A | PASS |
Dena Gambrel
|
|
|
4-3-07 Temp signed. Sarah was o.k. to have new landscape plan submitted and it was this afternoon.
|
BLD-Final | 3/16/2007 | 3/19/2007 | 3/19/2007 | A | PART |
Jim Storey
|
|
|
Vern fire calking; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Other | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | PART |
Jim Storey
|
|
|
Vern -fire calking; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Conference | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | FAIL |
Jim Storey
|
|
|
Vern this inspection is for fire caulking; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Other | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | PASS |
Jim Storey
|
|
|
Vern; Phone #: ###-#### Internet Inspection Request from: Stacie Backus2-4 ok
|
BLD-Conference | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PART |
Jim Storey
|
|
|
misc fire stopping 4 thru 2 nd floors ok to start ceilling tile.
|
Override - Parcel Holds | | | 3/1/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 3/1/2007 | | |
|
|
|
|
BLD-Other | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | PASS |
Jim Storey
|
|
|
vern - shaft inspect; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Wall cover | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PART |
Jim Storey
|
|
|
vern - cover inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 1st floor radus furdown ok to cover.
|
BLD-Framing/Rough-in | 1/31/2007 | 2/1/2007 | 2/1/2007 | A | FAIL |
Jim Storey
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Victoria Beall maintane fire assemblies floor and walls thrurout job.
|
BLD-Framing/Rough-in | 12/21/2006 | 12/22/2006 | 12/26/2006 | P | PART |
Jim Storey
|
|
|
Vern; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett conf with troy and vern reviwing 1 st floor.
|
CHANGE STATUS TO (ISS) | | | 12/21/2006 | | DONE |
|
|
|
resubmittal/modification picked up and paid for
|
BLD-Framing/Rough-in | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | PART |
Jim Storey
|
|
|
###-#### - vern Note: 1st floor (note able to inspect not dealing with mech) east wing bathrooms/ office space ok
|
Case Summary (BLD) | | | 12/20/2006 | | |
|
|
|
|
Print Occupancy Form | | | 12/20/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/20/2006 | | DONE |
|
|
|
called Vern ###-#### and told him permit is ready and fee
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 12/20/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 12/19/2006 | | 12/20/2006 | | PEND |
|
|
|
(3) PLAN MODIFICATION/RESUBMITTALS - Expedited. (Mike P.) Waiting for others to approve prior to issuing permit.
|
Routing - PUBLIC WORKS | 12/20/2006 | | 12/20/2006 | | PASS |
|
|
|
(4) PLAN MODIFICATION/RESUBMITTALS - Expedited. To add additional sinks located in the new Barrista Bar area.
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
Routing - MECHANICAL | 12/18/2006 | | 12/19/2006 | | PASS |
|
|
|
(2) PLAN MODIFICATION/RESUBMITTALS - Expedited. (Lee Rice)
|
Routing - PLUMBING | 12/18/2006 | | 12/19/2006 | | PASS |
|
|
|
(6) PLAN MODIFICATION kitchen area
|
Routing - FIRE | 12/15/2006 | | 12/18/2006 | | PASS |
|
|
|
(1) PLAN MODIFICATION/RESUBMITTALS - Expedited. *Updated review comments attached to plans.
|
Plan resubmittals received | | | 12/14/2006 | | |
|
|
|
(ok to log in as resubmittals per Marlene S.) Received 4 copies of page M-1, and 2 copies of the following: CDHD Plan Review Form, A5.08, A9.05, P-1, P-1A, P-6, M-6, M-7, E1.05; taken to Marlene Southard
|
BLD-Conference | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PART |
Jim Storey
|
|
|
vern - note: around 2:00 ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith reviewed fire stopping and 1hr vs 2 hr aplacations
|
BLD-Other | 12/4/2006 | 12/5/2006 | 12/5/2006 | P | FAIL |
Jim Storey
|
|
|
VERN - COVER; 1ST FLOOR Phone #: ###-#### Internet Inspection Request from: Cathy Chiles fire stopping sprinkler lines. gyp bhind tubs,
|
Telephone call | | | 12/5/2006 | | DONE |
|
|
|
Marlene received notice from Jim Storey today that the mechanical permits had been issued by overriding the parcel tag conditions. We never received the required mechanical plans. I called the architect (Robert Juskevich) and he couldn't find our plan review comments and requested I refax the review to him, which I did. I also called the ME, Suzanne Maranello (###-####) who had indicated in a phone conversation 2/31/06 that she had revised the mech plans to show everything we requested but that the architect had resubmitted the wrong plan revision and that she would follow up with him to resend the proper sheets. I left her a voice message that we had not yet received her revised plans and requested she follow up with the architect and call me. Marlene asked Jim to not continue with the rough-in inspection until the Mechanical plans have been received and approved.
|
BLD-Aging Inspection | 11/28/2006 | 11/28/2006 | 11/28/2006 | | NR |
Jim Storey
|
|
|
ncfi
|
BLD-Framing/Rough-in | 9/28/2006 | 9/28/2006 | 10/2/2006 | P | PASS |
Jim Storey
|
|
|
vern - 2nd floor; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/28/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/26/2006 | 9/26/2006 | 9/26/2006 | P | FAIL |
Jim Storey
|
|
|
Vern; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshauptc/n posted
|
BLD-Framing/Rough-in | 9/22/2006 | 9/25/2006 | 9/25/2006 | A | CANC |
Jim Storey
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/22/2006 | | |
|
|
|
|
BLD-Energy code compliance | 9/11/2006 | 9/12/2006 | 9/12/2006 | A | PASS |
Jim Storey
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles3rd floor ok
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/11/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/7/2006 | 9/8/2006 | 9/8/2006 | A | PART |
Jim Storey
|
|
|
vern- 3rd floor; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley exterior walls ok to insulate only.
|
BLD-Framing/Rough-in | 9/6/2006 | 9/7/2006 | 9/7/2006 | P | NR |
Jim Storey
|
|
|
vern- 3rd floor; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/6/2006 | | |
|
|
|
|
BLD-Energy code compliance | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | PART |
Jim Storey
|
|
|
vern Note: 4th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ec ok 4th floor
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 9/5/2006 | | |
|
|
|
needs energy 4th floor
|
BLD-Framing/Rough-in | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Jim Storey
|
|
|
vern - 4th floor only; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley gyp above fur down/
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/28/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/7/2006 | 8/7/2006 | 8/7/2006 | P | PART |
Jim Storey
|
|
|
vern - hold down; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley bolts for sheerinstaled
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/7/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/26/2006 | 6/27/2006 | 6/27/2006 | A | PART |
Jim Storey
|
|
|
vern - 1st floor ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckleyverified beam and collum fire assembly ok to instal
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/26/2006 | | |
|
|
|
|
BLD-Other | 6/19/2006 | 6/19/2006 | 6/19/2006 | P | PART |
Jim Storey
|
|
|
Vern, roof nailing; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt roof nailling for sheer top of wall ok all but under paripet slope.
|
BLD-Conference | 6/9/2006 | 6/12/2006 | 6/12/2006 | P | PASS |
Jim Storey
|
|
|
vern ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/9/2006 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/9/2006 | | |
|
|
|
a conf
|
BLD-Conference | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | PART |
Jim Storey
|
|
|
vern; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie sheer ok east half of bldg.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/5/2006 | | |
|
|
|
need conf insp for bld
|
BLD-Aging Inspection | 5/2/2006 | 5/2/2006 | 5/2/2006 | | NR |
Jim Storey
|
|
|
|
Plan resubmittals received | | | 4/7/2006 | | |
|
|
|
|
Telephone call | | | 2/22/2006 | | DONE |
|
|
|
I called Robert, architect at Mind's Eye, ###-#### to inquire about the mech plans which have not been submitted yet. He says he has the plans but hasn't had time to contact Marlene to determine the procedure to submit plans for a Mechanical permit to be reviewed by Bldg and Fire. Its on his "to do list".
|
Telephone call | | | 2/13/2006 | | DONE |
|
|
|
Phone call from Robert, Mind's Eye Arch., inquiring what they needed to do about the Mechanical plans. I explained that the 1/31 re-submitted plan was the same mechanical plan that was included in the set we issued under the building permit. I explained my telcon with Suzanne Merannello, ME on 2/3; (she said they had prepared a revised sheet with all the correct information on it but the architect must have submitted the wrong sheet). I explained that they need to submit the revised plans under a separate Mechanical permit for approval by the Bldg and Fire divisions, as explained on the Building permit Fire Review comments, which was issued with that provision to accommodate their difficulty in providing the plans with the building plan package. He asked how to get a Mech permit and I referred him to Marlene for details. Also briefed Marlene on the situation in anticipation of his call.
|
Routing - FIRE | 2/2/2006 | | 2/3/2006 | | FAIL |
|
|
|
The resubmitted plan was the same mechanical plan that was included in the set we issued under this building permit, with the provision that a separate Mechanical permit be obtained with proper plans submitted with that permit application. Spoke with Suzanne Merannello, ME; she said they had prepared a revised sheet with all the correct information on it but the architect must have submitted the wrong sheet. I explained that they need to submit the revised plans under a separate Mechanical permit for approval by the Bldg and Fire divisions, as explained on the Fire Review comments issued with that provision to accommodate their difficulty in providing the plans with the building plan package.
|
(F) Reprint permit | | | 2/1/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 1/31/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/31/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/31/2006 | | |
|
|
|
|
Plan resubmittals received | | | 1/31/2006 | | |
|
|
|
Received 2 sheets M-1 and routing to Sam Rogers.
|
Routing - FIRE | 1/26/2006 | | 1/27/2006 | | PASS |
|
|
|
Accepted per special approval by the PDS Building Dept manager; cooking hood plans will be submitted and reviewed by building and fire under a separate Mechanical permit application to be submitted at a later date, with a parcel tag that won't allow rough-in inspections on all trades until it is approved. Revised review faxed to architect.
|
Routing - PLAN CHECK | 1/27/2006 | | 1/27/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/27/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/27/2006 | | DONE |
|
|
|
PARCEL TAG put on project to prevent issuance and inspection of kitchen mechanical hood until plans are reviewed and approved by Fire and Building. A separate mechanical permit will be required for the hood installation. (msouthard)
|
Override - Parcel Holds | | | 1/27/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 1/27/2006 | | |
|
|
|
|
Telephone call | | | 1/27/2006 | | DONE |
|
|
|
left mess for alex jansen at ###-#### that permit is ready
|
Plan assigned to (M_P) | 8/30/2005 | | 1/27/2006 | | PASS |
|
|
|
1/27/2006 11:49:37 MYS - activity updated through activity BLDA022 from case BLD05-02392.
|
Routing - PLAN CHECK | 1/18/2006 | | 1/26/2006 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - FIRE | 1/17/2006 | | 1/18/2006 | | FAIL |
|
|
|
Faxed comments to architect. Resubmittal required specifying details of proposed Type 1 Exhaust hood. See attached comments.
|
Plan resubmittals received | | | 1/18/2006 | | FAIL |
|
|
|
Failed Plan Check, Fire.
|
Routing - PLAN CHECK | 12/22/2005 | | 1/17/2006 | | FAIL |
|
|
|
Called architect, requesting additional information be submitted for further review identifing penetrations into the dwelling unit separation walls.
|
Plan resubmittals received | | | 1/10/2006 | | DONE |
|
|
|
Received transmittal,1 letter to Mike P. 1 letter to Mary F. , 1 emergency generator ,1 product information sheet,1 commercial HVAC loads & 2 copys of sheets A0.01,A0.04,A0.05,A1.01,A1.02,A1.03,A1.04,A3.01,A3.03,A4.01,A4.02,A5.01,A5.08,A5.09,A5.10,A6.01,A6.02,A8.01,E1.06,E2.01,M-1,M-2,M-3,M-4,M-7 Taken to Mike P.
|
Routing - FIRE | 12/21/2005 | | 12/22/2005 | | FAIL |
|
|
|
Faxed comments to architect.
|
Routing - PLAN CHECK | 12/16/2005 | | 12/21/2005 | | |
|
|
|
Routed to fire.
|
Plan resubmittals received | | | 12/20/2005 | | DONE |
|
|
|
Letter to Sam Rogers regarding fire review and United Water fire flow information received via fax transmittal. Info forwarded to Mary F. in fire.
|
Routing - FIRE | 12/15/2005 | | 12/16/2005 | | FAIL |
|
|
|
Request for written response to each resubmittal item (except #3) from the previous review.
|
Routing - PLAN CHECK | 12/15/2005 | | 12/15/2005 | | FAIL |
|
|
|
Second review failed e-mailed and mailed comments to the architect. Additoional information required for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 12/1/2005 | | 12/2/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/30/2005 | | DONE |
|
|
|
Received 1 letter, 2 structural calcs, & 5 copys of sheets S-1,S-2,S-3,S-4,S-5,S-6 Taken to Mike P.
|
Routing Off Site - STRUCTURAL | 11/18/2005 | | 11/25/2005 | | FAIL |
|
|
|
3rd review failed, faxing and e-mailing comments to architect. Further review required.
|
Plan resubmittals received | | | 11/18/2005 | | |
|
|
|
Received (5) copies of sheet S-1 through S-6 and (2) copies of structural calcs. Routed to Mike P.
|
Routing Off Site - STRUCTURAL | 11/7/2005 | | 11/16/2005 | | FAIL |
|
|
|
2nd review failed, e-mailed comments to engineer and architect. Additional review required by outside engineering firm.
|
Routing - PLANNING Land Div | 11/9/2005 | | 11/9/2005 | | PASS |
|
|
|
ROS05-00050 was finalized on 11/09/05.
|
Routing - PLAN CHECK | 10/6/2005 | | 11/9/2005 | | |
|
|
|
Routing to Planning Land.
|
Plan resubmittals received | | | 11/7/2005 | | |
|
|
|
Received (3) copies of sheet S-1 through S-5 and (3) sets of structural calcs. Routed to Mike P.
|
Plan resubmittals received | | | 10/27/2005 | | |
|
|
|
Received (2) copies of coversheet and sheet A0.01, A0.02, A0.03, A0.04, A0.05, A1.01, A1.02, A1.03, A1.04, A1.05, A1.06, A1.07, A1.08, A1.09, A2.01, A2.02, A3.01, A3.02, A3.03, A4.01, A4.02, A5.01, A5.02, A5.03, A5.04, A5.05, A5.06, A5.07, A5.08, A5.09, A5.10, A6.01, A6.02, A8.01, A9.01, A9.02, A9.03, S-2, S-3, S-4, S-5, P-1, M-1, M-2, M-3, M-4, M-5 and E2.01. Routed to Mike P.
|
(F) Reprint permit | | | 10/18/2005 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/5/2005 | | 10/6/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions, rp information required to Boise City prior to start of construction.
|
1st review completed | | | 10/5/2005 | | FAIL |
|
|
|
failed planning land Div, ESC, plan check and fire.
|
Routing - PLAN CHECK | 10/5/2005 | | 10/5/2005 | | |
|
|
|
Routing to ESC.
|
Routing - FIRE | 9/21/2005 | | 10/5/2005 | | FAIL |
|
|
|
review emailed to architect.
|
Routing - PLAN CHECK | 9/2/2005 | | 9/21/2005 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect and owner requesting additional information be submitted for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 8/30/2005 | | 9/21/2005 | | FAIL |
|
|
|
Route outside engineering on 8/30/05.
Second review required by outside engineering firm.
|
Plan resubmittals received | | | 9/12/2005 | | |
|
|
|
Received (2) copies of sheet C-8 and (2) Erosion and Sediment Control Narratives. Routed to Mike P.
|
Routing - PLANNING | 9/2/2005 | | 9/2/2005 | | PASS |
|
|
|
Approved per DRH05-00187.
|
Routing - PUBLIC WORKS | 8/30/2005 | | 9/1/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/1/2005 | | 9/1/2005 | | FAIL |
|
|
|
ESC plan does not meet requirments set forth in BMC 8-17. Checklist prepared and faxed to PD. Also, contractor has been named so esc application needs to include certified RP.
|
Routing - PLUMBING | 9/1/2005 | | 9/1/2005 | | PASS |
|
|
|
4 notes attached to plan on grease interceptor vent, kitchen area ccc inspection on final, vent off of interceptor and floor sink locations per UPC 804.1 Approved as noted and per plan and 2003 UPC. 309
|
Routing - PLANNING Land Div | 8/30/2005 | | 8/30/2005 | | FAIL |
|
|
|
Prior to issuance of building permit, must complete easement vacation (SOS05-00014) and ROS/Property Line Adjustment ROS05-00050.
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/30/2005 | | |
|
|
|
|
Application received | | | 8/29/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2005 | | |
|
|
|
|
Fee Review-notes | 8/29/2005 | 8/29/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
(5) PLAN MODIFICATION/RESUBMITTALS - Expedited. (Marlene)
|