Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02394
StatusFinaled
Name CM COMPANY
Site Address 9101 W FAIRVIEW AVE
Project NamePETERSON AUTOPLEX BMW SHOWROOM
Customer Number 
ePlanReviewNo
Description
Peterson Autoplex - BMW Showroom Addition -To construct a new 7,738 sq. ft. one story type VB fully fire sprinklered show room addition which includes a new 986 sq. ft mezzanine and a 704 sq. ft. covered parking area to the north side of an existing auto shop. Other work includes remodeling restrooms and adding a 588 sq. ft. mezzaine within the existing shop building with new mechanical ventilation system. All work is per approved plans and attachments, DRH05-00300. Fire sprinklers are used for area.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/200812/10/2014 DONE
DetailsCathy Brown
This permit finaled on the web by Jakie Phelps
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Routing - PLAN CHECK10/20/2005 12/22/2008 PASS
DetailsCathy Brown
First Notice 9/16/200811/7/2008 DONE
Third Notice BLD1/8/20071/8/20073/1/2007 DONE
Second Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 10/31/200612/27/2006 DONE
Permanent occupancy  10/31/2006 DONE
Perm. Occ. Cert. # 11270 issued 10-26-06 to the Peterson Autoplex - BMS Showroom
BLD-Final10/25/200610/26/200610/26/2006APASS
DetailsJim Sly
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OK for Perm Occ. :)
Permanent Occupancy 10/26/200610/26/2006 DONE
Details
FIRE-Final Inspection10/24/200610/25/200610/25/2006APASS
DetailsTroy Cobbley
Fire life safety finaled. THe correct door hardware has been installed.
Temporary occupancy  10/12/2006 DONE
Temp. Occ. Cert. # 5460 issued 10-12-06 to Peterson Auoplex for the BMW Showroom addn.
BLD-Final10/10/200610/11/200610/11/2006PPART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp occ granted. All life/safety issues have been resolved. Waiting for ada counter tops and additional door hardware.
BLD-Final10/3/200610/4/200610/4/2006AFAIL
DetailsMike Jordan
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. No handrails installed at ramp or stairs at front enterance. Riser height on conc. stairs at front enetrance exceed the max 7 inch allowable. Handrail not continous at new stairway. Needs to have ada accessible counters at cashier and service counter.
FIRE-Final Inspection9/27/20069/28/20069/28/2006PPART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hanniman's permission until the two man doors on the east side of the showroom have been provided with approved door hardware.
Code Occupancy Approval  9/27/2006 PASS
FINAL SIGNED OFF
BLD-Framing/Rough-in8/25/20068/25/20068/25/2006PPASS
DetailsMike Jordan
charlie - ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Remainder of show room.
FIRE-Conference7/17/20067/17/20067/17/2006PDONE
DetailsTroy Cobbley
Dan and I went over inspection procedure for the sprinkler system above the special ceiling.
BLD-Conference7/17/20067/17/20067/17/2006PPART
DetailsMike Jordan
dan -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. ceiling grid. reviewed submittals. west half of showroom. Due to differnt type of system ele. and mech. has agreed to insp aftewr first half is complete.
BLD-Framing/Rough-in7/10/20067/10/20067/10/2006PPASS
DetailsMike Jordan
charlie; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. mezz. framing in existing bldg.
BLD-Framing/Rough-in5/3/20065/3/20065/3/2006PPASS
DetailsMike Jordan
charlie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final4/12/20064/13/20064/13/2006PCANC
DetailsMike Jordan
Rom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Framing/Rough-in4/13/20064/13/20064/13/2006PPART
DetailsMike Jordan
Rom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Contractor to fax special inspection report to structural engineer for approval of changes. Also need to add the hilti pins along back wall. Area of inspection is mezz.
BLD-Other3/29/20063/30/20063/30/2006APASS
DetailsMike Jordan
tom Note: structural steel columns - joyces; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Reveiwed special insp. reports and performed a partial insp. on welded connections.
BLD-Foundation2/24/20062/24/20062/24/2006PPART
DetailsMike Jordan
re-bar and masonary grout insp//grouting at 1pm//tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. West wall, top of wall. Also reveiwed special inspection reports.
BLD-Foundation2/21/20062/21/20062/21/2006PDEFR
DetailsMike Jordan
masonary wall, grout and re-bar insp//grouting at 1pm// tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Wall inspected by special inspector.
BLD-Concrete2/16/20062/16/20062/16/2006PDEFR
DetailsMike Jordan
rebar for concrete Tom ###-####
BLD-Other2/14/20062/14/20062/14/2006PPART
DetailsMike Jordan
re-bar and grout inspection//tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing2/9/20062/9/20062/9/2006PPASS
DetailsMike Jordan
Tom -- for slab; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
PubWorks Occupancy Approval1/25/20061/25/20061/25/2006 DONE
Drainage inspection not required per B. Murphy 1/25/06
BLD-Foundation1/19/20061/19/20061/19/2006PPASS
DetailsMike Jordan
tom; Phone #: ###-#### Note: before 3:00 conrete pour Internet Inspection Request from: Cathy Chiles. Perimeter stemwalls.
BLD-Footing1/17/20061/17/20061/17/2006PPART
DetailsMike Jordan
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Conc placed when on site. Noted that contractor had special insp.
BLD-Footing1/12/20061/12/20061/12/2006PPART
DetailsMike Jordan
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. east west and south perimeter footings. wip
Issue PAID IN FULL permit  11/10/2005 DONE
Plan assigned to (MLO)10/20/200510/20/200511/9/2005 PASS
11/9/2005 08:34:56 MLO - activity updated through activity BLDA022 from case BLD05-02394.
PLANS/APPL TAKEN TO FRONT DESK  11/9/2005 DONE
Print Occupancy Form  11/9/2005 DONE
Permit Ready to Issue  11/9/2005 DONE
Telephone call  11/9/2005 DONE
called ###-#### and left voicemessage for David Moe fees and that permit can be ready for pick up but need RP, ACHD, and land size for PWK
Routing - FIRE10/24/2005 11/8/2005 PASS
resubmittal acceptable; revised comments faxed to architect.
Plan resubmittals received  10/24/2005  
Received (10) copies of sheet FD1.1, (2) copies of sheet E1.3, (4) copies of sheet FP-2, (2) copies of sheet FP-3, FP-4 and 1. Routed to Mike O. Also received (1) memo and transmittal.
CHANGE STATUS TO (REV)  10/20/2005 DONE
Plan assigned to (MLO)8/31/2005 10/20/2005 PASS
10/20/2005 08:11:51 DLD - activity updated through activity BLDA022 from case BLD05-02394.
Routing - PUBLIC WORKS10/18/2005 10/19/2005 PASS
Routing - PLAN CHECK10/13/2005 10/18/2005 PASS
Plan resubmittals received  10/13/2005 DONE
Received 1 Transmittal letter,1 Memo, & 2 Copys of sheets G1.1,G1.2,A1.2,A7.1,A8.1,A8.2,A8.3,S0.1,S1.1,S2.1,S2.2,S5.1,S7.1,S7.2,S7.3 Taken to Mike Otto.
Routing Off Site - STRUCTURAL9/26/2005 10/12/2005 PASS
1st review completed  10/6/2005 FAIL
failed public works, structural, plan check, and fire
Routing - PLAN CHECK10/6/2005 10/6/2005 FAIL
corrections sent to architect
Plan resubmittals requested  10/6/2005 DONE
corrections from 9/14 incomplete
Routing - FIRE9/14/2005 10/6/2005 FAIL
review faxed to archtiect.
Plan resubmittals received  9/26/2005 DONE
Receicved 1 Transmittal Letter,2 Memos 2 Memorandums & 2 Copys of sheets G1.1,G1.2,A1.2,A8.1,A8.2,A8.3,S0.1,S1.1,S2.1,S2.2,S5.1,S7.1,S7.2,S7.3 Taken to Mike O.
Routing Off Site - STRUCTURAL9/1/2005 9/14/2005 FAIL
Called PDQ for pick up corrections sent to architect
Routing - PLAN CHECK9/12/2005 9/14/2005 FAIL
corrections sent to architect
Plan resubmittals requested  9/14/2005 DONE
IBC corrections
Plan resubmittals requested  9/14/2005 DONE
structural corrections
Routing - PLANNING9/9/2005 9/12/2005 PASS
DRH05-00030 Sara S. Approved per DRH05-00030.
Routing - PLUMBING9/8/2005 9/9/2005 PASS
note5 page P-1.3 1/2" drip cup will not take full R.P. discharge, provide adequate drainage.
Routing - Erosion and Sediment9/7/2005 9/8/2005 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS9/1/2005 9/7/2005 FAIL
Failed by Brian Murphy - Requires Drainage Plan. Contact at ###-####
Plan resubmittals received  9/7/2005  
Received (2) sets of Hazmat Data Sheets. Routed to Mike O.
(F) Reprint permit  9/1/2005 DONE
Plans ACCEPTED BY PLAN TECH  9/1/2005  
Plan routing begun/NEW & ADDTN  9/1/2005  
Routing - PLANNING Land Div9/1/2005 9/1/2005 PASS
Site is over 5 acres in size.
Application received  8/29/2005  
Recd Pcfee & Taken To Pln CK  8/29/2005  
Fee Review-notes8/29/20058/29/2005   
Routing - PLAN CHECK11/8/2005