Third Notice BLD | 12/22/2008 | 12/22/2008 | 12/10/2014 | | DONE |
Cathy Brown
|
|
|
This permit finaled on the web by Jakie Phelps
|
Second Notice BLD | 11/7/2008 | 11/7/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
Routing - PLAN CHECK | 10/20/2005 | | 12/22/2008 | | PASS |
Cathy Brown
|
|
|
|
First Notice | | 9/16/2008 | 11/7/2008 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 3/1/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/31/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/31/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11270 issued 10-26-06 to the Peterson Autoplex - BMS Showroom
|
BLD-Final | 10/25/2006 | 10/26/2006 | 10/26/2006 | A | PASS |
Jim Sly
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith OK for Perm Occ. :)
|
Permanent Occupancy | | 10/26/2006 | 10/26/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/24/2006 | 10/25/2006 | 10/25/2006 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled. THe correct door hardware has been installed.
|
Temporary occupancy | | | 10/12/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5460 issued 10-12-06 to Peterson Auoplex for the BMW Showroom addn.
|
BLD-Final | 10/10/2006 | 10/11/2006 | 10/11/2006 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Temp occ granted. All life/safety issues have been resolved. Waiting for ada counter tops and additional door hardware.
|
BLD-Final | 10/3/2006 | 10/4/2006 | 10/4/2006 | A | FAIL |
Mike Jordan
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. No handrails installed at ramp or stairs at front enterance. Riser height on conc. stairs at front enetrance exceed the max 7 inch allowable. Handrail not continous at new stairway. Needs to have ada accessible counters at cashier and service counter.
|
FIRE-Final Inspection | 9/27/2006 | 9/28/2006 | 9/28/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hanniman's permission until the two man doors on the east side of the showroom have been provided with approved door hardware.
|
Code Occupancy Approval | | | 9/27/2006 | | PASS |
|
|
|
FINAL SIGNED OFF
|
BLD-Framing/Rough-in | 8/25/2006 | 8/25/2006 | 8/25/2006 | P | PASS |
Mike Jordan
|
|
|
charlie - ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Remainder of show room.
|
FIRE-Conference | 7/17/2006 | 7/17/2006 | 7/17/2006 | P | DONE |
Troy Cobbley
|
|
|
Dan and I went over inspection procedure for the sprinkler system above the special ceiling.
|
BLD-Conference | 7/17/2006 | 7/17/2006 | 7/17/2006 | P | PART |
Mike Jordan
|
|
|
dan -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. ceiling grid. reviewed submittals. west half of showroom. Due to differnt type of system ele. and mech. has agreed to insp aftewr first half is complete.
|
BLD-Framing/Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PASS |
Mike Jordan
|
|
|
charlie; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. mezz. framing in existing bldg.
|
BLD-Framing/Rough-in | 5/3/2006 | 5/3/2006 | 5/3/2006 | P | PASS |
Mike Jordan
|
|
|
charlie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 4/12/2006 | 4/13/2006 | 4/13/2006 | P | CANC |
Mike Jordan
|
|
|
Rom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PART |
Mike Jordan
|
|
|
Rom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Contractor to fax special inspection report to structural engineer for approval of changes. Also need to add the hilti pins along back wall. Area of inspection is mezz.
|
BLD-Other | 3/29/2006 | 3/30/2006 | 3/30/2006 | A | PASS |
Mike Jordan
|
|
|
tom Note: structural steel columns - joyces; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Reveiwed special insp. reports and performed a partial insp. on welded connections.
|
BLD-Foundation | 2/24/2006 | 2/24/2006 | 2/24/2006 | P | PART |
Mike Jordan
|
|
|
re-bar and masonary grout insp//grouting at 1pm//tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. West wall, top of wall. Also reveiwed special inspection reports.
|
BLD-Foundation | 2/21/2006 | 2/21/2006 | 2/21/2006 | P | DEFR |
Mike Jordan
|
|
|
masonary wall, grout and re-bar insp//grouting at 1pm// tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Wall inspected by special inspector.
|
BLD-Concrete | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | DEFR |
Mike Jordan
|
|
|
rebar for concrete Tom ###-####
|
BLD-Other | 2/14/2006 | 2/14/2006 | 2/14/2006 | P | PART |
Mike Jordan
|
|
|
re-bar and grout inspection//tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/9/2006 | 2/9/2006 | 2/9/2006 | P | PASS |
Mike Jordan
|
|
|
Tom -- for slab; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
PubWorks Occupancy Approval | 1/25/2006 | 1/25/2006 | 1/25/2006 | | DONE |
|
|
|
Drainage inspection not required per B. Murphy 1/25/06
|
BLD-Foundation | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Mike Jordan
|
|
|
tom; Phone #: ###-#### Note: before 3:00 conrete pour Internet Inspection Request from: Cathy Chiles. Perimeter stemwalls.
|
BLD-Footing | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | PART |
Mike Jordan
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Conc placed when on site. Noted that contractor had special insp.
|
BLD-Footing | 1/12/2006 | 1/12/2006 | 1/12/2006 | P | PART |
Mike Jordan
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. east west and south perimeter footings. wip
|
Issue PAID IN FULL permit | | | 11/10/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/20/2005 | 10/20/2005 | 11/9/2005 | | PASS |
|
|
|
11/9/2005 08:34:56 MLO - activity updated through activity BLDA022 from case BLD05-02394.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/9/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/9/2005 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2005 | | DONE |
|
|
|
called ###-#### and left voicemessage for David Moe fees and that permit can be ready for pick up but need RP, ACHD, and land size for PWK
|
Routing - FIRE | 10/24/2005 | | 11/8/2005 | | PASS |
|
|
|
resubmittal acceptable; revised comments faxed to architect.
|
Plan resubmittals received | | | 10/24/2005 | | |
|
|
|
Received (10) copies of sheet FD1.1, (2) copies of sheet E1.3, (4) copies of sheet FP-2, (2) copies of sheet FP-3, FP-4 and 1. Routed to Mike O. Also received (1) memo and transmittal.
|
CHANGE STATUS TO (REV) | | | 10/20/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 8/31/2005 | | 10/20/2005 | | PASS |
|
|
|
10/20/2005 08:11:51 DLD - activity updated through activity BLDA022 from case BLD05-02394.
|
Routing - PUBLIC WORKS | 10/18/2005 | | 10/19/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/13/2005 | | 10/18/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/13/2005 | | DONE |
|
|
|
Received 1 Transmittal letter,1 Memo, & 2 Copys of sheets G1.1,G1.2,A1.2,A7.1,A8.1,A8.2,A8.3,S0.1,S1.1,S2.1,S2.2,S5.1,S7.1,S7.2,S7.3 Taken to Mike Otto.
|
Routing Off Site - STRUCTURAL | 9/26/2005 | | 10/12/2005 | | PASS |
|
|
|
|
1st review completed | | | 10/6/2005 | | FAIL |
|
|
|
failed public works, structural, plan check, and fire
|
Routing - PLAN CHECK | 10/6/2005 | | 10/6/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 10/6/2005 | | DONE |
|
|
|
corrections from 9/14 incomplete
|
Routing - FIRE | 9/14/2005 | | 10/6/2005 | | FAIL |
|
|
|
review faxed to archtiect.
|
Plan resubmittals received | | | 9/26/2005 | | DONE |
|
|
|
Receicved 1 Transmittal Letter,2 Memos 2 Memorandums & 2 Copys of sheets G1.1,G1.2,A1.2,A8.1,A8.2,A8.3,S0.1,S1.1,S2.1,S2.2,S5.1,S7.1,S7.2,S7.3 Taken to Mike O.
|
Routing Off Site - STRUCTURAL | 9/1/2005 | | 9/14/2005 | | FAIL |
|
|
|
Called PDQ for pick up corrections sent to architect
|
Routing - PLAN CHECK | 9/12/2005 | | 9/14/2005 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 9/14/2005 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals requested | | | 9/14/2005 | | DONE |
|
|
|
structural corrections
|
Routing - PLANNING | 9/9/2005 | | 9/12/2005 | | PASS |
|
|
|
DRH05-00030 Sara S. Approved per DRH05-00030.
|
Routing - PLUMBING | 9/8/2005 | | 9/9/2005 | | PASS |
|
|
|
note5 page P-1.3 1/2" drip cup will not take full R.P. discharge, provide adequate drainage.
|
Routing - Erosion and Sediment | 9/7/2005 | | 9/8/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/1/2005 | | 9/7/2005 | | FAIL |
|
|
|
Failed by Brian Murphy - Requires Drainage Plan. Contact at ###-####
|
Plan resubmittals received | | | 9/7/2005 | | |
|
|
|
Received (2) sets of Hazmat Data Sheets. Routed to Mike O.
|
(F) Reprint permit | | | 9/1/2005 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/1/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/1/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/1/2005 | | 9/1/2005 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Application received | | | 8/29/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2005 | | |
|
|
|
|
Fee Review-notes | 8/29/2005 | 8/29/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | 11/8/2005 | | | | |
|
|
|
|