(F) Reprint permit | | | 4/18/2008 | | DONE |
|
|
|
|
Second Notice BLD | 11/19/2007 | 11/19/2007 | 11/19/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/9/2007 | 11/19/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/9/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
BLD-Aging Inspection | 10/25/2006 | 10/25/2006 | 10/25/2006 | | PASS |
Mike Jordan
|
|
|
|
Temporary occupancy | | | 8/31/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5432 issued 8-31-06 to Newcastle Heights.
|
BLD-Final | 8/15/2006 | 8/15/2006 | 8/15/2006 | A | PART |
Jim Storey
|
|
|
Internet Inspection Request from: paul thornton pending p&z sign off.
|
FIRE-Final Inspection | 8/10/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Energy code compliance | 5/18/2006 | 5/18/2006 | 5/18/2006 | P | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 5/15/2006 | 5/16/2006 | 5/16/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton
|
BLD-Framing/Rough-in | 5/12/2006 | 5/12/2006 | 5/12/2006 | A | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton
|
BLD-Wall cover | 4/16/2006 | 4/17/2006 | 4/17/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Shear nailing ok, exterior walls built with 2x4, plans call for 2x6. Also noted that plans call for 5/8 type X inside and outside exterior walls on all sides for 1hr. rating, which may not be applicable due to fire seperation distances. Contractor to contact architect to resolve issues.
|
BLD-Concrete | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | PART |
Mike Jordan
|
|
|
interior footing and rebar lookie; Phone #: ###-#### Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 3/2/2006 | 3/2/2006 | 3/2/2006 | P | PASS |
Mike Jordan
|
|
|
Adrian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PART |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 2/25/2006 | 2/27/2006 | 2/27/2006 | A | DONE |
Mike Jordan
|
|
|
9 am: ITI will inspect rebar in wall as per Lochsa directive. Internet Inspection Request from: Adrian Marriage
|
BLD-Foundation | 2/22/2006 | 2/23/2006 | 2/23/2006 | P | FAIL |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Improper vert spacing, clearance issues. Needs RFI from engineer for epoxy of missing verts, also will requier special insp. on epoxy.
|
BLD-Footing | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | NR |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 2/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/7/2006 | | DONE |
|
|
|
left mess for bob unger at ###-#### is ready
|
Permit Ready to Issue | | | 2/6/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/6/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/6/2005 | 9/6/2005 | 2/3/2006 | | PASS |
|
|
|
2/3/2006 11:47:30 M_P - activity updated through activity BLDA022 from case BLD05-02409.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/3/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/3/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/18/2005 | | 2/3/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/24/2006 | | DONE |
|
|
|
Received 1 letter,1 comment response, & 2 copys of sheets A2.1,A2.2,A4.1 taken to Mike P.
|
1st review completed | | | 11/18/2005 | | FAIL |
|
|
|
FAILED PLANNING AND PLAN CHECK
|
Routing - FIRE | 11/7/2005 | | 11/16/2005 | | PASS |
|
|
|
Routed to FV 11/10
|
Routing Off Site - STRUCTURAL | | | 11/7/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/15/2005 | | 11/7/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Case Summary (BLD) | | | 11/7/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 10/12/2005 | | 10/26/2005 | | |
|
|
|
Routing to Planning Land Division.
|
Routing - PLANNING Land Div | 10/26/2005 | | 10/26/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/12/2005 | | DONE |
|
|
|
Received 3 Plan Review comments, 6 Copys of sheets S0.1,S2.1 , 3Copys of sheets S4.1,S2.3,S2.4,S4.1,S5.1,S6.2,S6.3 Taken to Mike P.
|
Routing - PUBLIC WORKS | 10/11/2005 | | 10/12/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/15/2005 | | 10/11/2005 | | |
|
|
|
Routed to P.W. for addressing
|
Routing - PLANNING | 9/14/2005 | | 9/15/2005 | | PASS |
|
|
|
Approved per DRH04-00289.
|
Routing - PLUMBING | 9/12/2005 | | 9/14/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing Off Site - STRUCTURAL | 9/6/2005 | | 9/14/2005 | | |
|
|
|
Routed to AHJ Engineering
Faxed comments to Steve White, additional review required by outside engineering firm.
|
Routing - Erosion and Sediment | 9/9/2005 | | 9/12/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions. Reference ESC05-01477 as Master Plan.
|
Routing - PUBLIC WORKS | 9/6/2005 | | 9/9/2005 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/6/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/6/2005 | | 9/6/2005 | | FAIL |
|
|
|
Must record final plat.
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2005 | | |
|
|
|
|
Application received | | | 8/30/2005 | | |
|
|
|
|