Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-02410
StatusFinaled
Name AMANDA FEELY
Site Address 8851 8857 W CANDLESTON CT
Project NameNEWCASTLE HEIGHTS 1 story 4 pl
Customer Number 
ePlanReviewNo
Description
Lot 7 * To construct a new 4,192 sq .ft. single story, wood framed, four unit apartment building on a concrete slab. Each unit is 2 bedroom and two bath at 1,048 sq. ft. All construction per the approved plans and attached comment list. MJP CUP 04-00106 DRH 04-00289.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  4/18/2008  
Second Notice BLD11/19/200711/19/200711/19/2007 DONE
First Notice has not been responded to.
First Notice 11/9/200711/19/2007 DONE
Permanent Occupancy  11/9/2007 DONE
Code Occupancy Approval11/5/200711/5/200711/5/2007PPASS
DetailsScott M.Brown
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
Temporary occupancy  9/6/2006 DONE
Temp. Occ. Cert. # 5439 issued 9-6-06 to Newcastle Heights.
BLD-Final8/30/20068/30/20068/30/2006APASS
DetailsMike Jordan
Temp occ given. Will be ok for perm occ once code enforcement finals.
BLD-Final8/11/20068/11/20068/11/2006PNR
DetailsMike Jordan
Internet Inspection Request from: paul thornton. Needs code enforcement final.
FIRE-Final Inspection7/28/20067/28/20067/28/2006PPASS
DetailsForrest France
Life safety is acceptable, inspection passed.
BLD-Energy code compliance4/11/20064/11/20064/11/2006APASS
DetailsMike Jordan
Internet Inspection Request from: paul thornton
BLD-Framing/Rough-in4/6/20064/7/20064/7/2006APASS
DetailsJim Sly
Internet Inspection Request from: paul thornton
BLD-Wall cover3/27/20063/27/20063/27/2006PPART
DetailsMike Jordan
shear inspection ready to side Internet Inspection Request from: paul thornton. Shear nail on exterior walls.
BLD-Concrete3/7/20063/8/20063/8/2006APART
DetailsMike Jordan
center footings and rebar Internet Inspection Request from: Adrian Marriage
BLD-Footing3/7/20063/7/20063/7/2006PNR
DetailsMike Jordan
Paul; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong.
BLD-Foundation2/27/20062/27/20062/27/2006PPART
DetailsMike Jordan
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Energy code compliance2/23/20062/24/20062/24/2006APASS
DetailsTom Arcoraci
Ridgid insulation, thanks-Adrian Internet Inspection Request from: Adrian Marriage
BLD-Foundation2/22/20062/23/20062/23/2006APART
DetailsMike Jordan
wall inspection Internet Inspection Request from: Adrian Marriage
BLD-Foundation2/22/20062/23/20062/23/2006PCANC
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing2/17/20062/21/20062/21/2006APART
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Footing2/16/20062/17/20062/17/2006PNR
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  2/13/2006 DONE
Telephone call  2/7/2006 DONE
left mess for bob unger at ###-#### is ready
Permit Ready to Issue  2/6/2006 DONE
Print Occupancy Form  2/6/2006  
Plan assigned to (M_P)9/6/20059/6/20052/3/2006 PASS
2/3/2006 11:48:33 M_P - activity updated through activity BLDA022 from case BLD05-02410.
PLANS/APPL TAKEN TO FRONT DESK  2/3/2006 DONE
Print Pending Permit.LaserJet4  2/3/2006 DONE
Case Summary (BLD)  2/3/2006 DONE
Routing - PLAN CHECK11/18/2005 2/3/2006 PASS
Plan resubmittals received  1/24/2006 DONE
Received 1 letter,1 comment response, & 2 copys of sheets A2.1,A2.2,A4.1 taken to Mike P.
1st review completed  11/18/2005 FAIL
FAILED PLANNING AND PLAN CHECK
Routing - FIRE11/7/2005 11/16/2005 PASS
Routed to FV 11/10
Routing - PLAN CHECK9/15/2005 11/7/2005 FAIL
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
Case Summary (BLD)  11/7/2005  
Routing Off Site - STRUCTURAL  11/4/2005 PASS
Routing - PLAN CHECK10/12/2005 10/26/2005  
Routing to Planning Land Division.
Routing - PLANNING Land Div10/26/2005 10/26/2005 PASS
Routing - PUBLIC WORKS10/11/2005 10/12/2005 PASS
Routing - PLAN CHECK9/15/2005 10/11/2005  
Routed to P.W. for addressing
Routing - PLANNING9/14/2005 9/15/2005 PASS
Approved per DRH04-00289.
Routing - PLUMBING9/12/2005 9/14/2005 PASS
per plans and 2003 upc
Routing Off Site - STRUCTURAL9/6/2005 9/14/2005 FAIL
Routed to AHJ Engineering
Faxed comments to Steve White, additional review required by outside engineering firm.
Routing - Erosion and Sediment9/9/2005 9/12/2005 PASS
ESC plan approved with attached conditions. Reference ESC05-01477 as Master Plan.
Routing - PUBLIC WORKS9/6/2005 9/9/2005 PASS
Plan routing begun/NEW & ADDTN  9/6/2005  
Routing - PLANNING Land Div9/6/2005 9/6/2005 FAIL
Must record final plat.
Plans ACCEPTED BY PLAN TECH  9/6/2005  
Application received  8/30/2005