(F) Reprint permit | | | 4/18/2008 | | DONE |
|
|
|
|
Second Notice BLD | 11/19/2007 | 11/19/2007 | 11/19/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/9/2007 | 11/19/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/9/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
Temporary occupancy | | | 8/31/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5430 issued 8-31-06 to Newcastle Heights.
|
BLD-Final | 8/30/2006 | 8/30/2006 | 8/30/2006 | A | PASS |
Mike Jordan
|
|
|
Temp occ given. Will be ok for perm occ once code enforcement finals.
|
BLD-Final | 8/11/2006 | 8/11/2006 | 8/11/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs code enforcement final.
|
FIRE-Final Inspection | 7/28/2006 | 7/28/2006 | 7/28/2006 | P | PASS |
Forrest France
|
|
|
Life safety is satisfactory, inspection passed.
|
BLD-Energy code compliance | 4/16/2006 | 4/17/2006 | 4/17/2006 | A | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/14/2006 | 4/14/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs to complete fire caulking, get repair for broken A40 and 41 trusses from engineer. Also correct glazing in windows at the (3/4 hour) for fire speration distance. 5/8 type X required on inside also. ok to insulate.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. could not locate approved plans or truss engineering.
|
BLD-Wall cover | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PART |
Mike Jordan
|
|
|
shear inspection ready to side Internet Inspection Request from: paul thornton. Shear nail insp. on exterior walls.
|
BLD-Concrete | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PART |
Mike Jordan
|
|
|
interior footings and rebar lookie. Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 3/2/2006 | 3/2/2006 | 3/2/2006 | P | PASS |
Mike Jordan
|
|
|
Adrian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Conference | 2/25/2006 | 2/27/2006 | 2/27/2006 | A | DONE |
Mike Jordan
|
|
|
9 am: ITI will inspect rebar in wall as per Lochsa directive. Internet Inspection Request from: Adrian Marriage
|
BLD-Foundation | 2/23/2006 | 2/23/2006 | 2/23/2006 | P | FAIL |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Improper vert spacing, clearance issues. Needs RFI from engineer for epoxy of missing bar. Will also need special insp for epoxy.
|
BLD-Footing | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | NR |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 2/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/7/2006 | | |
|
|
|
left mess for bob unger at ###-#### is ready
|
Permit Ready to Issue | | | 2/6/2006 | | |
|
|
|
|
Print Occupancy Form | | | 2/6/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/6/2005 | 9/6/2005 | 2/3/2006 | | PASS |
|
|
|
2/3/2006 11:51:53 M_P - activity updated through activity BLDA022 from case BLD05-02411.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/3/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/3/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/18/2005 | | 2/3/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/24/2006 | | DONE |
|
|
|
Received 1 letter,1 comment response, & 2 copys of sheets A2.1,A2.2,A4.1 taken to Mike P.
|
1st review completed | | | 11/18/2005 | | FAIL |
|
|
|
FAILED PLANNING AND PLAN CHECK
|
Routing - FIRE | 11/7/2005 | | 11/16/2005 | | PASS |
|
|
|
Routed to FV 11/10
|
Routing Off Site - STRUCTURAL | | | 11/7/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/15/2005 | | 11/7/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to architect requesting additional information be submitted for further review prior to issuing permit.
|
Case Summary (BLD) | | | 11/7/2005 | | |
|
|
|
|
Routing - PLAN CHECK | 10/12/2005 | | 10/26/2005 | | |
|
|
|
Routing to Planning Land Division.
|
Routing - PLANNING Land Div | 10/26/2005 | | 10/26/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/11/2005 | | 10/12/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | | | 10/11/2005 | | |
|
|
|
Routed to P.W. for addressing
|
Routing - PLANNING | 9/14/2005 | | 9/15/2005 | | PASS |
|
|
|
Approved per DRH04-00289.
|
Routing - PLUMBING | 9/12/2005 | | 9/14/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing Off Site - STRUCTURAL | 9/6/2005 | | 9/14/2005 | | FAIL |
|
|
|
Routed to AHJ Engineering
Faxed comments to Steve White, additional review required by outside engineering firm.
|
Routing - Erosion and Sediment | 9/9/2005 | | 9/12/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions. Reference ESC05-01477 as Master Plan.
|
Routing - PUBLIC WORKS | 9/6/2005 | | 9/9/2005 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/6/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/6/2005 | | 9/6/2005 | | FAIL |
|
|
|
Must record final plat.
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2005 | | |
|
|
|
|
Application received | | | 8/30/2005 | | |
|
|
|
|