Permit NumberBLD05-02420
StatusExpired
Name WALLACE CONSTRUCTION
Site Address 30 W HORIZON DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project in the hillside area is for the addition of 295s.f. to an existing 624s.f. detached garage. A letter from the applicant's geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946 R-1B setbacks ok per sar. Separate ESC permit is required. All per the approved plans as marked and attached ESC plan approved by Steve Webb and attached engineering for foundations in the hillside area. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  12/8/2005 DONE
BLD-Framing/Rough-in11/10/200511/14/200511/14/2005APASS
DetailsTony Young
todd//please call 15 min prior; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
frame ok and insulated,, ok to cover
BLD-Framing/Rough-in11/7/200511/8/200511/8/2005APART
DetailsTony Young
todd ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
c/n on truss specs,, need h-1 connection at plate per plan,, need hangers on hip per specs,, need to strap new to existing at plates.
BLD-Foundation9/15/20059/15/20059/15/2005PPASS
DetailsDave Hannah
dave Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/9/20059/9/20059/9/2005PPASS
DetailsDave Hannah
dave Note: please call 1/2 hr prior to inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
PubWorks Subgrade Approval9/7/20059/7/20059/7/2005 DONE
Footing subgrade approved by the geotech
Issue PAID IN FULL permit  9/6/2005 DONE
Permit Ready to Issue  9/2/2005 DONE
Inspection Record Card- Bld  9/2/2005 DONE
Telephone call  9/2/2005 DONE
left mess that permit is ready
Plan assigned to (PEP)9/1/2005 9/1/2005 PASS
9/1/2005 10:54:36 PEP - activity updated through activity BLDA022 from case BLD05-02420.
PLANS/APPL TAKEN TO FRONT DESK  9/1/2005 DONE
Application received  8/31/2005  
Routing - Erosion and Sediment8/31/2005 8/31/2005 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK8/31/2005    
Perry P.