Third Notice BLD | 8/18/2006 | 8/18/2006 | 12/22/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/2/2006 | 8/2/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/19/2006 | 8/2/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/19/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11139 issued 7-19-06 to WFS Financial.
|
BLD-Final | 7/10/2006 | 7/11/2006 | 7/11/2006 | A | PASS |
Mike Jordan
|
|
|
MATT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Was finaled by Jim Sly, noted ok for perm occ.
|
Permanent Occupancy | | 7/11/2006 | 7/11/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/3/2006 | 7/5/2006 | 7/5/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Conference | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | DONE |
Troy Cobbley
|
|
|
I left a correction notice with Tim Waterman giving him until June 23, 2006 to have all permits for WFS finales or the temporary occupancy would be revoked and utilities turned off.
|
Meeting | | | 5/22/2006 | | DONE |
|
|
|
90-day TOC period has expired. Approval by Dave Hanneman and Jenifer Gilliland to allow a 30-day extension if owner posts a bond. In subsequent telcon 5/19/06 4:00 pm, with FA vendor, Lynde Jones, Mountain Alarm, Lynde indicated they have approval to resume work and she will have a person on site Monday to begin work and she committed to have it done within 30 days, absolutely "drop dead date" and possibly sooner. With that assurance, JG agreed to defer posting bond at this time but will have Troy Cobbley issue a Correction Notice to building owner, Tim Waterman indicating that the TOC will be extended until 6/23 at which time if the alarm system has not been installed and satisfactorily inspected and tested, the building may be red tagged, possibly utilities terminated and occupants expected to vacate. I called building owner, Tim Waterman, Video Eye, 5/22/06, 9:00 am to advise of City course of action; not available, left voice message to call me.
|
BLD-Final | 2/23/2006 | 2/23/2006 | 2/23/2006 | P | DONE |
Tom Arcoraci
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Temporary occupancy | | | 2/13/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5368 issued 2-13-06 to WFS Financial.
|
BLD-Final | 12/6/2005 | 12/6/2005 | 12/6/2005 | P | PART |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK for Temp Occ. OK for Perm Occ. when Fire Perms. ():
|
FIRE-Final Inspection | 12/5/2005 | 12/6/2005 | 12/6/2005 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Steve Kueter's permission until the fire alarm permit has been finaled.
|
FIRE-Final Inspection | 11/30/2005 | 12/1/2005 | 12/1/2005 | A | PART |
Forrest France
|
|
|
Life safety issues are acceptable pending fire alarm upgrade now required for the entire building.
|
BLD-Framing/Rough-in | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PASS |
Mike Jordan
|
|
|
ceiling grid inspection please///matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 10/26/2005 | 10/27/2005 | 10/27/2005 | P | PASS |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue PAID IN FULL permit | | | 10/18/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/13/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/13/2005 | | DONE |
|
|
|
called Matt Rhees (arch.) and told him that permit is ready and fees
|
Routing - PLAN CHECK | 10/7/2005 | | 10/12/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/9/2005 | | 10/12/2005 | | PASS |
|
|
|
10/12/2005 11:19:52 CJW - activity updated through activity BLDA022 from case BLD05-02426.
|
Plan resubmittals received | | | 10/11/2005 | | DONE |
|
|
|
Received 1 Transmittal & 2 Copys of sheets A4.0,M4.0 Taken to Carl W.
|
1st review completed | | | 10/7/2005 | | FAIL |
|
|
|
Failed plan check
|
Routing - FIRE | 9/19/2005 | | 10/7/2005 | | PASS |
|
|
|
Comments faxed to the architect.
|
Plan resubmittals received | | | 9/28/2005 | | |
|
|
|
Received (2) copies of A3.0. Routed to Carl W.
|
Routing - PLAN CHECK | 9/12/2005 | | 9/19/2005 | | FAIL |
|
|
|
The IBC plan review was started on September 16, 2005 and was finished on September 19, 2005. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 9/9/2005 | | 9/12/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2005 | | |
|
|
|
|
Application received | | | 8/31/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/31/2005 | | |
|
|
|
|
Fee Review-notes | 8/31/2005 | 8/31/2005 | | | |
|
|
|
|