Third Notice BLD | 6/14/2006 | 6/14/2006 | 8/16/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/6/2006 | 5/25/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/6/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10978 issued 4-6-06 to Tully's.
|
BLD-Final | 4/4/2006 | 4/5/2006 | 4/5/2006 | P | PASS |
Dave Hannah
|
|
|
paul fishley; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
FIRE-Final Inspection | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | PASS |
Troy Cobbley
|
|
|
Related alarm and sprinkler permits are approved, life safety finaled.
|
Permanent Occupancy | | 4/5/2006 | 4/5/2006 | | DONE |
|
|
|
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5319 extended for 90 days per Jenifer thru 5-22-06
|
Routing - PLANNING | 12/29/2005 | | 12/2/2005 | | PASS |
|
|
|
Passed per approved DR.
|
FIRE-Final Inspection | 11/22/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Forrest France
|
|
|
Items on the correction notice issued 11/22 have been completed, final pending alarm resubmittals for device address changes and shell permit finals for alarm and sprinkler.
|
BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | P | PART |
Dave Hannah
|
|
|
Forest will sign-off arround 1:00 pm. Please come to inspect shortly after. Thanks. Internet Inspection Request from: Alex Monge ok for temp occ ok to go perm after others go perm and shell is cc
|
BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | NR |
Dave Hannah
|
|
|
Please call when you arrive. Internet Inspection Request from: Alex Monge
|
Temporary occupancy | | | 11/23/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5319 issued 11-23-05 to Tully's in the BODO, Bldg. # 7.
|
FIRE-Final Inspection | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | FAIL |
Forrest France
|
|
|
Lower the height of the provided fire extinguisher to 48" AFF, provide missing sprinkler escutcheon, remove tape from heads in the restrooms, provide additional emergency light in the back room as discussed.
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | NR |
Forrest France
|
|
|
The related fire alarm permit must be inspected and approved prior to life safety final.
|
BLD-Final | 11/16/2005 | 11/21/2005 | 11/21/2005 | A | NR |
Tom Arcoraci
|
|
|
Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 11/16/2005 | 11/21/2005 | 11/21/2005 | A | NR |
Forrest France
|
|
|
The related fire alarm permit work must be inspected and approved prior to life safety inspection and final.
|
FIRE-Sprinkler Rough-in | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | CANC |
Forrest France
|
|
|
Wrong inspection type called in by the general contractor, was intended for the sprinkler permit.
|
Plan Reviewer's activity | | | 11/3/2005 | | DONE |
|
|
|
Modified permit description and comments for clarity.
|
BLD-Wall cover | 10/31/2005 | 10/31/2005 | 11/1/2005 | P | PASS |
Dave Hannah
|
|
|
Please call Dennis Harter. Internet Inspection Request from: Alex Monge ok to cover wall ok to cover ceiling after fire proofing is patched
|
BLD-Wall cover | 10/20/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
Cover-up inspection at Tully's. Early AM please. Internet Inspection Request from: Alex Monge hard lid and walls ok but need all other trades signed of do not cover
|
BLD-Wall cover | 10/20/2005 | 10/21/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
Cover-up inspection at Tully's. Early AM please. I mistakenly scheduled you for Monday. Sorry. Internet Inspection Request from: Alex Monge ok to cover top 6ft of walls
|
Routing - PLAN CHECK | 10/14/2005 | | 10/17/2005 | | DONE |
|
|
|
Permit to be issued, per direction from Jenifer Gilliland. Approval of the project by the Planing Division was deferred until later. A permanent Certificate of Occupancy will not be given until design review issues are resolved. (note modified for clarity on 11-3-05)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/17/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/17/2005 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2005 | | DONE |
|
|
|
called Sylvester Ramirez ###-#### and left voicemessage that permit is ready and fees
|
Issue PAID IN FULL permit | | | 10/17/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/9/2005 | | 10/17/2005 | | PASS |
|
|
|
10/17/2005 08:58:30 CJW - activity updated through activity BLDA022 from case BLD05-02432.
|
Routing - PLANNING | 10/13/2005 | | 10/14/2005 | | FAIL |
|
|
|
The applicant has not received DR approval for the requested items. The application is being processed under DRH05-00362.
|
Routing - FIRE | 10/12/2005 | | 10/13/2005 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 10/5/2005 | | 10/12/2005 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 10/11/2005 | | |
|
|
|
Received (2) copies of sheet E1.1, E1.2 and E1.3. Routed to Carl W.
|
Plan resubmittals received | | | 10/10/2005 | | DONE |
|
|
|
Received 2 Copys pf sheet M1.0 Taken to Carl W.
|
Routing - FIRE | 10/4/2005 | | 10/5/2005 | | FAIL |
|
|
|
Fire review comment #1 regarding exiting discrepancies were not resolved by plan revisions or addressed in a response.
|
Routing - PLAN CHECK | 10/4/2005 | | 10/4/2005 | | |
|
|
|
Sent to Fire.
|
Routing - PLUMBING | 9/30/2005 | | 10/4/2005 | | PASS |
|
|
|
provide a floor sink at the beverage station per original plans if equipment requires. provide unit shutoff valve on water supply.
|
Routing - PLAN CHECK | 9/15/2005 | | 9/30/2005 | | FAIL |
|
|
|
One items still not resolved. Sent drawings back to Plumbing.
|
Plan resubmittals received | | | 9/28/2005 | | |
|
|
|
Received (2) copies of sheet A1.1, A5.0, A6.0, M1.0 and P1.0. Routed to Carl W.
|
Routing - PLAN CHECK | 9/13/2005 | | 9/15/2005 | | FAIL |
|
|
|
The IBC plan review was started on September 14, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - FIRE | 9/15/2005 | | 9/15/2005 | | FAIL |
|
|
|
Review faxed to architect.
|
1st review completed | | | 9/15/2005 | | FAIL |
|
|
|
Review failed plumbing, plan check and fire.
|
Routing - PLUMBING | 9/12/2005 | | 9/13/2005 | | FAIL |
|
|
|
Need revised plumbing plan showing floor sinks and waste and vent piping to meet health dept., 2003 UPC and Idaho plumbing code for indirect waste connections in kitchen.
|
Routing - PUBLIC WORKS | 9/9/2005 | | 9/12/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2005 | | |
|
|
|
|
Application received | | | 9/1/2005 | | |
|
|
|
|
Pending Assignment by MYS | 9/1/2005 | | 9/1/2005 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2005 | | |
|
|
|
|
Fee Review-notes | 9/1/2005 | 9/1/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | 12/2/2005 | | | | |
|
|
|
|