REC-702 IS FOR DATUM CONSTRUCTION/Victory Plaza Building #2 (Shell Only) - To construct a new 32,200 square foot, one story office, warehouse shell building and related site improvements. This building will be constructed of concrete tilt-up exterior walls, steel interior framing and roof joists and concrete slab floor. This is a shell building only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is fully fire sprinklered. The sprinklers are used for area increase. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20071/30/2007 DONE
Second Notice has not been responded to.
Third Notice BLD1/8/20071/8/20071/30/2007 DONE
Second Notice has not been responded to.
Third Notice BLD1/8/20071/8/20071/30/2007 DONE
Second Notice has not been responded to.
Third Notice BLD1/8/20071/8/20071/30/2007 DONE
Second Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice12/12/200612/12/200612/27/2006 DONE
DetailsJim Sly
PubWorks Occupancy Approval12/13/200612/13/200612/13/2006 DONE
Signed permanent occupancy 12/08/06 S. Landaluce.
BLD-Final12/11/200612/12/200612/12/2006PPASS
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/C issued
DOC - Permit Finaled12/12/200612/12/200612/12/2006PPASS
DetailsJim Sly
FIRE-Final Inspection12/11/200612/12/200612/12/2006APASS
DetailsTroy Cobbley
Permit finaled
BLD-Final12/6/200612/7/200612/7/2006PNR
DetailsMike Jordan
mike - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Fire/life/safety failed.
Code Occupancy Approval  11/20/2006 PASS
FINAL SIGNED OFF.
BLD-Aging Inspection10/3/200610/3/200610/3/2006 PASS
DetailsMike Jordan
wip
BLD-Framing/Rough-in7/27/20067/27/20067/27/2006PPASS
DetailsMike Jordan
mike; Phone #: ###-#### Note: please call 1/2 hr prior to inspections Internet Inspection Request from: Cathy Chiles. Framing for soffits and riser/mech. rooms.
BLD-Footing6/5/20066/6/20066/6/2006APART
DetailsMike Jordan
mike Note: right before noon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. west footing.
BLD-Footing6/1/20066/2/20066/2/2006PNR
DetailsMike Jordan
mike - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Concrete5/18/20065/18/20065/18/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/18/2006 at 6:34:32 AM. Contact: ###-####. Reinforcement insp. for conc. tilt panels.
(F) Reprint permit  4/11/2006  
Issue PAID IN FULL permit  4/10/2006  
Plan assigned to (JCM)3/21/2006 3/22/2006 PASS
Plan Reviewer's activity  3/22/2006 PASS
Inserted, reviewed and approved the resubmitted structural and architectural plan sheet submitted to reflect the required concrete wall panel revisions for crane weight. JCM
CHANGE STATUS TO (RDY)  3/22/2006 DONE
Pulled for John M. to insert revised sheets no fee changes///3/22/06 BAS
CHANGE STATUS TO (REV)  3/21/2006 DONE
Received resubmittals
Plan resubmittals received  3/21/2006  
Received 1 copy of cover transmittal letter, 2 copies of the following; A-2, A-3, A-4, A-5, A-7, S-1, S-1a, S-2, S-2a, S-5, S-5a, S-7, S-8, S-11, S-10, S-17, S-19, S-20, S-21, S-24 and taken to John M.
Plan assigned to (JCM)9/7/20059/7/20053/17/2006 PASS
3/17/2006 09:35:28 JCM - activity updated through activity BLDA022 from case BLD05-02436.
Routing - PLAN CHECK3/15/2006 3/17/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/17/2006 DONE
Inspection Record Card- Bld  3/17/2006  
Telephone call  3/17/2006  
Left message with Ben Petersen ###-#### to pick up permit and to provide G.C., RCE#, R.P., ACHD 3-17-06 eus
Permit Ready to Issue  3/17/2006  
Routing - FIRE3/14/2006 3/15/2006 PASS
Attached updated review comments to plans. Faxed comments to architect.
Routing - PLAN CHECK3/8/2006 3/14/2006  
Routing - PLANNING3/7/2006 3/8/2006 PASS
Approved per DRH05-00229 and per revised plans.
Routing - PLUMBING3/3/2006 3/7/2006 PASS
rain drain system 1/4" per foot min.
Routing - PUBLIC WORKS3/2/2006 3/6/2006 PASS
Routing - Erosion and Sediment3/3/2006 3/3/2006 PASS
ESC plan already passed with attached conditions in October 2005.
Routing - PLANNING Land Div3/1/2006 3/2/2006 PASS
The property is a platted lot.
Plan Reviewer's activity  2/24/2006 DONE
Building was moved on the lot, along with additional building and site modifications. I inserted the revised plans and documents and started the rerouting of this project to all departments for another review. JCM
Routing - PLAN CHECK10/13/2005 2/24/2006  
To the plans to the permit techs and requested that they start the rerouting to all departments. JCM
Plan resubmittals received  2/23/2006 DONE
Received transmittal letter,& 5 copys of sheets C-1,C-2,C-3,C-4,C-5 taken to John M.
Plan resubmittals received  2/6/2006  
Received 1 copy of cover letter and Transmittal letter; 2 copies of each of the following; 0, SP-1, SP-2, L-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, A13, EN-1, E-0, E-1, E-3, Drainage calcs, & Drainage System O & M, Structural calcs; 3 Copies of the following; S1, S-1A, S-2, S-2A, S-3, S-4, S-9, S-10, S-11, S-12, S-13, S-14, S-15, S-16, S-17, S-23, 5 Copies of the following; 1, C-2, C-3, C-4, C-5
Plan Reviewer's activity  10/20/2005 PASS
Reviewed and approved resubmittals with red lined notes and attached comment list. JCM
1st review completed  10/13/2005 FAIL
failed planning land div, and plan check.
Routing - FIRE9/21/2005 10/13/2005 PASS
review faxed to architect.
Plan resubmittals received  10/4/2005  
Received (2) copies of sheet 0, SP-1, A-1, A-4, A-6, A-8, A-9, A-10, A-13, A-15, EN-1, S-1, S-1A, S-2, S-2A and S-4. Routed to John M.
Routing Off Site - STRUCTURAL9/8/2005 9/23/2005 PASS
Called PDQ for pick up - Received a faxed letter from the consulting structural engineer approving the plans and calculations as submitted. JCM
Routing - PLANNING9/14/2005 9/21/2005 PASS
Marty S. DRH05-00229
Routing - PLAN CHECK9/21/2005 9/21/2005 FAIL
John M.
Plan resubmittals requested  9/20/2005 DONE
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLUMBING9/12/2005 9/14/2005 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS9/7/2005 9/12/2005 PASS
Additional plans submitted  9/12/2005  
Received (2) additional soils reports to supplement faxed copy. Routed to John M.
Routing Off Site - STRUCTURAL9/12/2005 9/12/2005  
Routed additional soils report that was submitted to AHJ
Routing - Erosion and Sediment9/12/2005 9/12/2005 PASS
ESC plan approved with attached conditions.
Routing - PLANNING Land Div9/7/2005 9/7/2005 FAIL
Need to provide proof of legal land division.
Plans ACCEPTED BY PLAN TECH  9/7/2005  
Plan routing begun/NEW & ADDTN  9/7/2005  
(F) Reprint permit  9/7/2005 DONE
Application received  9/1/2005  
Recd Pcfee & Taken To Pln CK  9/1/2005  
Fee Review-notes9/1/20059/1/2005