DOC-Permit Expired | 12/5/2006 | 12/5/2006 | 12/5/2006 | | DONE |
Jim Sly
|
|
|
Permit expired by limitations.
|
BLD-Aging Inspection | 8/2/2006 | 8/2/2006 | 8/4/2006 | | NR |
Jim Sly
|
|
|
|
Issue PAID IN FULL permit | | | 4/4/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/31/2006 | | DONE |
|
|
|
talked to greg nelson at ###-#### to let them know the permit has expired & needs to pickup by tuesday or will void permit
|
Case Summary (BLD) | | | 12/29/2005 | | |
|
|
|
|
Telephone call | | | 12/29/2005 | | DONE |
|
|
|
talked to brad bengson at ###-#### that permit is ready-he has questions on the erosion told him to call aimee or steve
|
Inspection Record Card- Bld | | | 10/24/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 10/24/2005 | | |
|
|
|
|
Telephone call | | | 10/24/2005 | | DONE |
|
|
|
talked to brad bengson at ###-#### that permit is ready
|
Routing - PLAN CHECK | 10/20/2005 | | 10/21/2005 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 10/20/2005 | | 10/20/2005 | | PASS |
|
|
|
|
1st review completed | | | 10/19/2005 | | FAIL |
|
|
|
failed public works.
|
Routing - FIRE | 10/3/2005 | | 10/19/2005 | | PASS |
|
|
|
Approved with no review comments. No structures are to be built under this permit; proposed use will not affect the FD access to existing buildings on adjoining properties.
|
Routing - PLANNING | 9/23/2005 | | 9/30/2005 | | PASS |
|
|
|
Approved per DRH04-00086.
|
Routing - PLUMBING | 9/16/2005 | | 9/23/2005 | | PASS |
|
|
|
No plumbing shown.
|
Routing - PUBLIC WORKS | 9/14/2005 | | 9/16/2005 | | FAIL |
|
|
|
Requires drainage revisions: Variance required. Contact Brian Murphy ###-####
|
Routing - Erosion and Sediment | 9/16/2005 | | 9/16/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 9/8/2005 | | 9/14/2005 | | PASS |
|
|
|
ROS_6433 approved by Planning Director on 3/01/2005.
|
Plan routing begun/NEW & ADDTN | | | 9/8/2005 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/8/2005 | | |
|
|
|
|
Application received | | | 9/2/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/2/2005 | | |
|
|
|
|
BLD-Final | 8/4/2006 | 10/3/2006 | | P | |
Jim Sly
|
|
|
|
Plan assigned to (DLD) Darla | 9/8/2005 | 9/8/2005 | | | |
|
|
|
|
Fee Review-notes | 9/2/2005 | 9/2/2005 | | | |
|
|
|
|
Routing - PLAN CHECK | 9/30/2005 | | | | PEND |
|
|
|
(Darla or Kelly) Failed Public Works.
|